Closed EUJ-01-2016 H2020

5G – Next Generation Communication Networks

Related topics

Hover a topic or connection to preview why it's linked, click for details, double-click to open it · drag to rearrange

Centre = current topic · inner ring = direct links, outer ring = topics linked through one of them · colour = call status (click a status to hide it) · thicker line = stronger link

Topics in this graph

4 direct links · 6 linked through them

  • ICT-06-2014 Closed Import topictree v1 · weight 2
    Smart optical and wireless network technologies

    EUJ call is more about general 5G concepts requirements and characteristics. ICT-06 about specific aspects of wireless and optical networks.

    Linked through ICT-06-2014 (1)

  • ICT-14-2014 Closed Import topictree v1 · weight 2
    Advanced 5G Network Infrastructure for the Future Internet

    EUJ call is more about general 5G concepts requirements and characteristics. ICT-14 about shorter-term aspects of radio communication and/or network architecture

    Linked through ICT-14-2014 (2)

    • ICT-09-2017 Closed Import topictree v1 · weight 1
      Networking research beyond 5G

      weak link from advanced research in the context of 5G to research beyond 5G

    • ICT-08-2017 Closed Import topictree v1 · weight 1
      5G PPP Convergent Technologies

      ubiquitos 5G access network applications targeted in both topics

  • EUK-01-2016 Closed Import topictree v1 · weight 2
    5G – Next Generation Communication Networks

    Joint Calls with Japan and South Korea - international approach

    Linked through EUK-01-2016 (1)

    • EUK-02-2018 Closed Import topictree v1 · weight 2
      5G

      Building on the outcomes of previous joint call on 5G R&I (where the main output of the work was a proof of concept for an interoperability/architecture framework which demonstrates a possible way forward for the needed definition of the interoperability specifications) the focus of 2018 call is on large scale demonstrations and trials towards 5G applications (strong aspect is hrmonization for 5G standards and spectrum.

  • EUJ-02-2018 Closed Import topictree v1 · weight 2
    5G and beyond

    Building on the outcomes of previous phases of 5G R&I (where enphasis was on developing common positions, standards and interoperable systems for critical networks and computing platforms), the main goal of 2018 call is to evaluate in real setup innovative end-to-end 5G systems. Most of the work will be on large scale demonstrations and trials towards 5G applications and also start working on enabling technologies for beyond 5G

    Linked through EUJ-02-2018 (2)

    • ICT-17-2018 Closed Import topictree v1 · weight 1
      5G End to End Facility

      EUJ Collaboration with Japan; evaluation of innovative end-to-end 5G systems built on the outcomes of previous phases of the 5G R&I

    • ICT-19-2019 Closed Import topictree v1 · weight 1
      Advanced 5G validation trials across multiple vertical industries

      EUJ Cooperation with Japan based on large-scale demonstration an trials towards 5G applications & joint research on enabling technologies beyond 5G

Call text (as on F&T portal)

View on F&T portal
Specific Challenge:

Bold 5G initiatives in both EU and Japan open industrial collaboration prospects to further progress with the objective of developing common positions, standards and interoperable systems for critical networks and computing platforms. Proposals with balanced participation of EU and Japanese partners should make a substantial contribution to the identified themes indicating the benefits of a joint effort.

Progress on standards related technologies and system approaches are needed to realise 5G radio access and include ultra-lean signalling design, new spectrum and access methods, massive MIMO, a new air interface, and SON. It also requires to further valorise the themes made in the first two EU-Japan coordinated calls with co-funding scheme between EC and MIC/NICT, to achieve high speed/high capacity dense local networks and user environments. Unified network management applying SDN/NFV techniques is directly applicable in the context of this challenge

Scope

Research and Innovation Actions

Two aspects that are complementing each other are in scope:

  • 5G technologies and systems to realize high-performance heterogeneous networks which have dynamic resource allocation capabilities, superior spectral efficiency performances and functions of supporting a very wide range of application requirements. The work focuses on interoperability across heterogeneous networking implementation, on the basis of agreement on the overall testing and evaluation methodologies and the identification of related evaluation criteria and parameters and usage scenarios. This work is expected to visibly contribute to the overall evaluation methodology of 5G technologies carried out by 3GPP. It includes both below and above 6GHz relevant frequency bands in the context of global interoperability scenarios.
  • 5G network to control heavy dynamicity, which change traffic volume and characteristic as well as traffic growth, with agile and flexible control or management scheme such as SDN/NFV. The Software-Defined Networking (SDN) technologies with networks controlled by software, automatically is targeted for advancing networks, as well as the Network Functions Virtualisation (NFV) to virtualize entire classes of network node functions into building blocks that may be connected, or chained, together to create telecommunication services. They draw out the performance of 5G and are essential to manage the networks in the near future. The work focuses on the earliest networks by SDN and NFV in the world, on the overall testing and evaluation SDN network management and the result of related evaluation will contribute to to relevant standardisation (i.e. ONF, ITU, 3GPP). This work is expected to visibly contribute to the overall evaluation methodology of 5G technologies carried out by 3GPP.

Sharing the results in common testbeds and applications may be targeted, and the 2020 Tokyo Olympics may be considered as a deployment scenario of 5G networks or technologies.

A strong focus should be given towards a common standardization roadmap for 5G which may start with 3GPP R14, including coordinated and common standards in the SDN/NFV domain. Standardization impact through EU and Japanese research efforts are addressed through H2020 as well as 5GMF (5G Mobile Communication Promotion Forum) and should also be relevant in the context of the WRC’19 5G spectrum process.

The Commission considers that proposals requesting a contribution from the EU up to EUR 1.5 million would allow this specific challenge to be addressed appropriately by two distinct projects. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts. No more than one action per bullet point will be funded.

Expected Impact:
  • Optimised exploitation of access resources through interoperability across a range of technologies for multiple applications in both dense and rural environments.
  • Development and demonstration of key enabling technologies for the future generations of integrated/heterogeneous access network systems.
  • Joint identification of standardization requirements and contribution to standardization bodies and fora, supporting global views on open standards and interoperability, with particular focus on 3GPP and WRC'19 developments. It includes a significant contribution to the testing and evaluation methodologies of 5G access technologies under 3GPP.
  • New basic technologies for network management. Implementation acceleration through agile relocation and flexible reconnection of virtual network functions (VFN) with real-time monitoring as proof of concepts.
Cross-cutting Priorities:

International cooperation

News flashes

2016-01-26

A total of 19 proposals were submitted in response to this call. The breakdown per topic is as follows:EUJ-01-2016: 4EUJ-02-2016: 13EUJ-03-2016: 2

2015-10-20
The submission session is now available for: EUJ-01-2016(RIA), EUJ-02-2016(RIA), EUJ-03-2016(RIA)
call topic details
Call status: Closed
Opening date: 2015-10-20 (10 years ago)
Closing date: 2016-01-19 (10 years ago)
Procedure: single-stage

Budget: 3,000,000
Expected grants: not specified
News flashes

This call topic has been appended 2 times by the EC with news.

  • 2016-01-26
    a total of 19 proposals were submitted i...
  • 2015-10-20
    the submission session is now available...
Call

H2020-EUJ-2016

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 2 other topics in this call:

Source information

Showing the latest information. Found 1 version of this call topic in the F&T portal.

Information from

  • 2024-03-30_14-20-49

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

14 Aug 2015 · est.

Call opens

20 Oct 2015

Call closes

19 Jan 2016

Outcome expected

19 Jun 2016 · est.

Grant agreement signed

19 Sep 2016 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    14 Aug 2015 · 11 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    20 Oct 2015 · 10 years ago

    Submissions can be made from this date.

  3. Call closes

    19 Jan 2016 · 10 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    19 Jun 2016 · 10 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    19 Sep 2016 · 10 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

1 bubble

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal