SPIRE-01-2016
Systematic approaches for resource-efficient water management systems in process industries -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalNowadays, 12% of water utilisation in the EU is devoted to industrial use. Since water is a scarce resource, it is crucial for the European industry to change the current paradigm and develop more sustainable and efficient water technologies, which is also an important element for increasing its competitiveness, because a significant amount of energy is consumed for industrial water treatment. In the sustainable development context, efficient water use is closely linked to the efficient use and re-use of other resources, such as energy, chemicals, raw materials and soils. As such, these aspects need to be considered holistically in order to develop sustainable solutions.
Scope
The main objective is the optimisation of the use of water in industry. Research activities should focus on several of the following areas:
- Combining existing technologies (e.g. advanced processing, nano-technology and materials) in order to achieve enhanced sustainability in water treatment processes by reducing water use, energy and raw materials consumption and at the same time minimizing waste and/or recovering valuable substances.
- Selective separation processes in order to be able to treat specific industrial fluxes, also leading to the recovery of valuable substances.
- Adaptation of current processes or equipment to use alternative water sources. e.g. rainwater, salt or brackish water, cooling water, or Waste Water Treatment Plant (WWTP) effluent.
- Alternative cooling/heating methods. Reducing the energy levels that are needed for water and steam related production processes; dry cooling technologies; water and energy recovery processes from water vapour.
- Use of renewable energy, in order to achieve low energy water treatment processes (e.g. photo-degradation of pollutants).
- Development of closed loop recycling and reuse, involving cascading of processes and industrial water symbiosis.
- Development of a sustainable strategy for selecting materials and infrastructure for water transport and use, including water storage and treatment.
The proposals should also include a Life cycle analysis, since it offers the framework to deliver meaningful information on the "water footprint" of manufactured goods, delivered services, business operations and consumer behaviour. The total footprint of the process regarding water, energy and resources should be considered.
Activities are expected to focus on Technology Readiness Levels 5 to 7 and to be centred around TRL 6. This topic addresses cross-KET activities. The proposals are expected to allocate at least 30% of the budget to demonstration activities.
This topic is particularly suitable for SMEs.
The Commission considers that proposals requesting a contribution from the EU between EUR 5 and 7 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Expected Impact:- Reduction of at least 20% in water use compared to the current practice in the sector.
- Reduction of at least 30% in wastewater production compared to the current practice in the sector.
- Reduction of at least 15% in energy use compared to the current practice in the sector.
- Minimising the Water Footprint, employing less water intensive or waterless technologies and increasing recycling.
- New technology developments in water treatment and wide adoption of these technologies to enhance sustainability in the process industries.
- Decouple the industrial production from the utilisation of fresh water reserves
In order to properly monitor the Resource Efficiency Impact, Key Performance Indicators should be implemented.
Proposals should include a business case and exploitation strategy, as outlined in the Introduction to the LEIT part of this Work Programme.
Cross-cutting Priorities:Cross-cutting Key-Enabling Technologies (KETs)Contractual Public-Private Partnerships (cPPPs)SPIRE
News flashes
Flash Call Info:
An overview of the evaluation results of call Stage2 of the Two stage call of H2020-IND-CE-2016-17 (flash call info) is now available under the "Additinoal documents" section on the topic page.
FLASH INFORMATION ON THE CALL RESULTS2017 PILOTS TOPICS (two-stage)
Published: 14 October 2015Deadline: 4 May 2017Available budget: 48.66 M€
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 21Number of inadmissible proposals: 0Number of ineligible proposals: 0Number of above-threshold proposals: 9Total budget requested for above-threshold proposals:62,239,241 €
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Flash Call Info
In order to best ensure equal treatment, successful stage 1 applicants do not receive the evaluation summary reports (ESRs) for their proposals, but a GENERALISEDFEEDBACK with information and tips for preparing the full proposal. The generalised feedback for topics CIRC-01-2016-2017 and CIRC-02-2016-2017 is published under the CallConditions of each topic.
Flash Call Info:
An overview of the evaluation results of call Stage 1 of the Two stage call of H2020-IND-CE-2016-17 (flash call info) is now available under the "Topic conditions & documents" section on the topic page.
DEADLINE (second stage) of 2017 two-stage topics: 04.05.1721 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
PILOTS-03-20017: 9PILOTS-04-2017: 6PILOTS-05-2017: 6
An overview of the evaluation results (called 'Flash Call Info') of thetopic FOF-12-2017 of H2020-FOF-2017call is now available under the 'Topic conditions & documents' section onthe correspondanttopic page.
FLASH INFORMATION ON THE CALL RESULTS
H2020-IND-CE-2016-2017 (FOF (rtd) + SPIRE 2017 TOPICS)
Published: 14 October 2015Deadline: 19 January 2017Available budget: FOF(rtd) 86.18 M€ + SPIRE 82.11 M€
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.The results of the evaluation are as follows:
FOF (rtd)Number of proposals submitted (including proposals transferred from or to other calls): 154Number of inadmissible proposals: 2Number of ineligible proposals: 0Number of above-threshold proposals: 36Total budget requested for above-threshold proposals: 183,778,494.32 €
SPIRENumber of proposals submitted (including proposals transferred from or to other calls): 55Number of inadmissible proposals: 1Number of ineligible proposals: 0Number of above-threshold proposals:19Total budget requested for above-threshold proposals: 99,381,088.79 €
We recently informed the applicants about the evaluation results for their proposals.For questions, please contact the Research Enquiry Service.
H2020-IND-CE-2016-17
A total of 117 proposals were submitted in response to this call. The number of proposals for each topic/type of action is shown below:
• CIRC-01-2016-2017 (IA): 72• CIRC-02-2016-2017 (IA): 45
Corrigendum - FLASH INFORMATION ON THE CALL RESULTS
H2020-IND-CE-2016-2017 (2017 PILOTS TOPICS)Please read "Deadline: 27 October 2016"
FLASH INFORMATION ON THE CALL RESULTSH2020-IND-CE-2016-2017 (2017 PILOTS TOPICS)Published: 14 October 2015Deadline: 27 October 2017Available budget: 48,660,000 €
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call. The following overall thresholds were applied: 8/10
The results of the evaluation are as follows: Number of proposals submitted (including proposals transferred from or to other calls): 69Number of inadmissible proposals: -Number of ineligible proposals: -Number of above-threshold proposals: 21Total budget requested for above-threshold proposals: 147.997.304 €We recently informed the applicants about the evaluation results for their proposals. Above-threshold proposals have been invited to submit a full proposal by 4 May 2017.Information on the selected projects will be published on CORDIS after that date. For questions, please contact the Research Enquiry Service .
Deadline: 19.01.2017A total of 234 proposals were submitted in response to this call. The number of proposals for each topic is shown below:
FOF-06-2017: 34FOF-07-2017: 28FOF-08-2017: 16FOF-09-2017: 57FOF-10-2017: 21FOF-12-2017: 15 IA + 6 CSA
SPIRE-07-2017: 11SPIRE-08-2017: 11SPIRE-09-2017: 18SPIRE-10-2017: 10SPIRE-11-2017 2SPIRE-12-2017 1SPIRE-13-2017 4
Rules of Participation:
From 1 January 2017 Switzerland is associated to the whole Horizon 2020 programme, including the Societal Challenge calls. For more information please read the information sheet available here.
Flash Call Info:
An overview of the evaluation results of call H2020-IND-CE-2016-17 - Circular Economy (flash call info) is now available under the "Topic conditions & documents" section on the topic page.
FAQs 2017:
If you are applying for the 2017 topics under H2020-IND-CE-2016-17 - Circular Economy, do not forget to check new and archived FAQs relevant for your topic here.
Deadline (first stage) of 2017 two-stage topics: 27.10.1669 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
PILOTS-03-20017: 30PILOTS-04-2017: 14PILOTS-05-2017: 25
2016 CIRC topics - Deadline: 06.09.16
A total of 26 proposals were submitted in response to the second stage of this call. The number of proposals for each topic is shown below:CIRC-01a-2016 – 19CIRC-02a-2016 – 7
Please note that the latest information on results (Flash Call Info) for the topics CIRC-01-2016 and CIRC-02-2016 corresponding to the first stage of two stage call (that closed on 8 March 2016) can be found in the "Additional Documents" section of these topics.
Please note that the latest information on results (Flash Call Info) for the topics CIRC-03-2016, CIRC-04-2016, and CIRC-05-2016corresponding to the single stage call (that closed on 8 March 2016) can be found in the "Additional Documents" section of these topics.
A revised version of the Work programme 2016-2017 has been adopted in 25/07/2016.
The main changes in the call Industry 2020 in the Circular Economy sub-call Circular Economy concern:- New evaluation criteria and evaluation procedures for all topics.- Increase in available budget for CIRC-01-2017.- Changes in the challenge, scope or impact description of several topics related with the implementation of the United Nations (UN) Sustainable Development Goals, as well as the Paris Agreement under the UN Framework Convention on Climate Change.
Horizon 2020 Work Programme 2017 update
After the update to the Horizon 2020 Work Programme 2017 of 25 July 2016, the following updates were made:
- Open Access Data new provisions have been added for 2017 calls with an opening date on or after 26/07/2016.
- The text for evaluation criteria, scoring, threshold and procedure has been clarified.
- The text for topics FOF-12-2017, SPIRE-07-2017, SPIRE-08-2017 and SPIRE-12-2017 has been modified.
- The introduction of SPIRE topics under the call H2020-IND-CE-2016-17 has been modified.
- The new CSA topic SPIRE-13-2017 'Potential of Industrial Symbiosis in Europe' has been added to the call H2020-IND-CE-2016-17.
- The indicative budget for 2017 PILOTS topics under the call H2020-IND-CE-2017 was increased to €48.66 million in 2017.
- The indicative budget for 2017 FOF topics (rtd) under the call H2020-IND-CE-2017 was increased to €86.18 million in 2017.
- The indicative budget for 2017 SPIRE topics under the call H2020-IND-CE-2017 was increased to €82.11 million in 2017.
Flash Call InfoCall identifier: H2020-IND-CE-2016-2017 (2016 PILOTS topics)Call title: Industry 2020 in the circular economyPublished: 14 October 2015Deadline: 24 May 2016 17:00:00
Budget available: 32 M€
The Commission has completed the evaluation of the proposals submitted to the above call. The results of the evaluation are as follows:
- Number of proposals submitted (including proposals transferred from or to other calls): 15
- Number of inadmissible proposals: 0
- Number of ineligible proposals: 0
- Number of above-threshold proposals: 10
- Total budget requested for above-threshold proposals: 64,639,106 €
We recently informed the applicants about the evaluation results for their proposals.
The number of proposals that can finally be funded depends on the available budget and the formal approval of grant agreements by the Commission.
It is expected that the first grant agreements will be signed by November 2016.
Information on the selected projects will be published on CORDIS after that date.http://cordis.europa.eu/projects/home_en.html
In case of questions, please contact the Research Enquiry Service http://ec.europa.eu/research/enquiries
H2020-CIRC-2016-TwoStage, first stageThe evaluation of first stage proposals is now complete. The coordinators of proposals who failed to pass to the second stage have been informed in writing, and have each received an Evaluation Summary Report (ESR) setting out scores and comments.The “Flash info” published on the Participant Portal shows the key statistics related to this call, including number of proposals submitted, the number evaluated, and the number passing the thresholds and thus invited to the second stage.For successful first stage applicants, it is important to uphold the principle of equal treatment, and to ensure that all have a chance to benefit from the comments of experts. Therefore, instead of an ESR, this generalised feedback is provided now to all applicants invited to submit a full proposal at the second stage. You are kindly requested to take this feedback into account when preparing your full proposal. At the second stage you have a chance to address or clarify issues that should convince the second stage experts. Some or all of these experts may not be the same as those who reviewed your outline proposal.
Summary of main shortcomings in first stage successful proposals
CIRC-01:
• The objectives did not always include quantitative targets or these targets were not always convincingly supported.• The concept description was not always focused and clear on the innovation potential, the circular economy view, the economic mechanisms and governance required for a swift on a specific circular value chain.• The role of end-users was not always sufficiently described with regards to their importance in the value chain or their involvement is missing at early stages • The expected TRL was not always sufficiently substantiated.• Large scale demonstrations were not always sufficiently explained and/or did not always have a clear co-design approach to justify the need for such demonstrations.• Expected economic and environmental impacts were not always adequately quantified and/or were not always sufficiently explained in relation to the demonstration. • Business models were not always sufficiently presented.
CIRC-02:
• The objectives did not always include quantitative targets or they were not always convincingly substantiated.• Objectives addressing the relevant legal, societal and market challenges were not always present.• The interest among fertilizer companies or other potential end-users of the recycled nutrient was not always demonstrated. • The role of end-users of recycled nutrient was not always sufficiently described, and often defined to contribute only in the last stages of the proposed action.• Quantitative information supporting the expected impact of the action was not always presented.• Metrics for the final capacity of the technology and its outputs were not always described.
FLASH INFORMATION ON THE CALL RESULTS (FLASH CALL INFO)Call for proposals: H2020-CIRC-2016-TwoStage, first stageCall Title: Industry H2020 in the Circular EconomyPublished: 14.10.2015Deadline: 08.03.2016 (first stage)
Indicative available budget: EUR 80 millionBudget per topic/type of action with separate ‘call-budget-split’:
• CIRC-01-2016 - Systemic, eco-innovative approaches for the circular economy: design for circular values and supply chains /IA: EUR 60 million• CIRC-02-2016 - Water in the context of the circular economy: demonstrating the potential of efficient nutrient recovery from water /IA: EUR 20 million
The Agency EASME has now completed the evaluation of the proposals submitted to the above-mentioned call. The following overall thresholds were applied:• CIRC-01-2016: Overall threshold applied 8.0• CIRC-02-2016: Overall threshold applied 8.0
The results of the evaluation are as follows:• CIRC-01-2016: 70 proposals submitted, 19 above thresholds• CIRC-02-2016: 32 proposals submitted, 8 above thresholds
Total number of proposals submitted (including proposals transferred from or to other calls): 102Total number of inadmissible proposals: 1Total number of ineligible proposals: 0Total number of above-threshold proposals: 27Total budget requested for above-threshold proposals: 231.54 million
We recently informed the applicants about the evaluation results for their proposals. Above-threshold proposals have been invited to submit a full proposal by 06.09.2016Information on the selected projects will be published on CORDIS after that date. Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Agency.For questions, please contact the Research Enquiry Service .
An overview of the following evaluation results (flash call info) is now availableunder the tab Topic conditions and documents:
- 2016 SPIRE topics
- 2016 FOFtopics
- 2016 PILOTS topics (first stage results)
2016CIRCtopics - Deadline: 08.03.16
Circular EconomyTOPICS - 138 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
CIRC-01 : 72CIRC-02 : 33CIRC-03 : 4CIRC-04 : 18CIRC-05 :11
2016 FOF and SPIREtopics - Deadline: 21.01.16
Factories of the Future TOPICS - 183 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
FoF-01 : 23FoF-02 : 20FoF-03 : 41FoF-04 : 27FoF-05 : 3ICT FoF-11 : 49ICT FoF-13 : 20
Sustainable Process Industries TOPICS - 62 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
SPIRE-01: 15 SPIRE-02: 22SPIRE-03: 9SPIRE-04: 13SPIRE-05: 2SPIRE-06: 1For Energy-Efficient Building topics, see here
Deadline (first stage) of 2016 two-stage topics: 08.12.15
59 proposals were submitted in response to this call.The number of proposals for each topics is shown below:
PILOTS-01-2016: 27PILOTS-02-2016: 32
Publication date: 2015-10-14 (9 years ago)
Opening date: 2015-10-15 (9 years ago)
Closing date: 2016-01-21 (9 years ago)
Procedure: single-stage
Budget: 74000000
Expected grants: not specified
This call topic has been appended 29 times by the EC with news.
-
2017-12-05
flash call info:an overview of the evalu... -
2017-07-06
flash information on the call results201... -
2017-06-06
flash call infoin order to best ensure e... -
2017-05-30
flash call info:an overview of the evalu... -
2017-05-17
deadline (second stage) of 2017 two-stag... -
2017-05-05
an overview of the evaluation results (c... -
2017-04-27
flash information on the call resultsh20... -
2017-03-08
h2020-ind-ce-2016-17a total of 117 propo... -
2017-02-07
corrigendum - flash information on the c... -
2017-01-30
flash information on the call resultsh20... -
2017-01-25
deadline: 19.01.2017a total of 234 propo... -
2017-01-18
rules of participation:from 1 january 20... -
2016-12-05
flash call info:an overview of the evalu... -
2016-11-08
the submission session is now available... -
2016-11-08
deadline (first stage) of 2017 two-stage... -
2016-09-20
the submission session is now available... -
2016-09-20
the submission session is now available... -
2016-09-07
2016 circ topics - deadline: 06.09.16a t... -
2016-08-09
please note that the latest information... -
2016-08-03
a revised version of the work programme... -
2016-08-03
the submission session is now available... -
2016-07-25
horizon 2020 work programme 2017 updatea... -
2016-07-12
flash call infocall identifier: h2020-in... -
2016-05-20
h2020-circ-2016-twostage, first stagethe... -
2016-05-18
flash information on the call results (f... -
2016-04-19
an overview of the following evaluation... -
2016-03-09
2016circtopics - deadline: 08.03.16circu... -
2016-01-25
2016 fof and spiretopics - deadline: 21.... -
2015-12-14
deadline (first stage) of 2016 two-stage...
H2020-IND-CE-2016-17
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 35 other topics in this call:
- CIRC-01-2016-2017
- CIRC-02-2016-2017
- CIRC-03-2016
- CIRC-04-2016
- CIRC-05-2016
- FOF-01-2016
- FOF-02-2016
- FOF-03-2016
- FOF-04-2016
- FOF-05-2016
- FOF-06-2017
- FOF-07-2017
- FOF-08-2017
- FOF-09-2017
- FOF-10-2017
- FOF-11-2016
- FOF-12-2017
- FOF-13-2016
- PILOTS-01-2016
- PILOTS-02-2016
- PILOTS-03-2017
- PILOTS-04-2017
- PILOTS-05-2017
- SPIRE-02-2016
- SPIRE-03-2016
- SPIRE-04-2016
- SPIRE-05-2016
- SPIRE-06-2016
- SPIRE-07-2017
- SPIRE-08-2017
- SPIRE-09-2017
- SPIRE-10-2017
- SPIRE-11-2017
- SPIRE-12-2017
- SPIRE-13-2017
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-30_14-20-20
Annotations (will be publicly visible when approved)
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 9 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Publication date
- 9 years agoThe call was published on the Funding & Tenders Portal.
-
Opening date
- 9 years agoThe call opened for submissions.
-
Closing date
- 9 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 8 years agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 8 years agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)