FoF-08-2015

ICT-enabled modelling, simulation, analytics and forecasting technologies -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal

Scope

Specific challenge: Simulating continuous and discrete manufacturing processes, forecasting the behaviour of manufacturing systems and processes, and designing products to an even larger extent through virtual mock-ups and optimization methods integrated in the design and production chain are key enablers for Europe's future manufacturing sector. Advances in ICT in terms of high performance computing power and communication speed, smart sensor technologies for generating and exploiting "big data", the convergence of the embedded world and the Internet/Cloud world in cyber physical systems (CPS), multi-modal visualisation and interaction technologies, are leading to a new generation of modelling, simulation, forecasting and decision support methods and tools. These offer a huge potential for making the whole manufacturing chain more competitive.

Scope:

a.      R&I Actions: proposals are expected to cover at least one of the two themes identified below.

Innovative modelling, simulation, analytics and forecasting tools for manufacturing at large, building on advances in ICT. The Commission considers that proposals requesting a contribution from the EU between EUR 2 and 4 million would allow this area to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts. Projects should be driven by industrial use-cases and should include proof-of-concept demonstrations for validation, preferably on real process chains. They should address as appropriate several of the following issues:

               Modelling and simulation methods involving multiple phenomena (physical, mechanical, energetic, chemical, energy, material characteristics, cost, …); including multi-scale and integrated discrete/continuous models, multidisciplinary and multiobjective design optimisation tools taking a holistic approach; and/or integrating virtual and physical experiments building on the combination of simulated, experimental, and real world data in real time.

               Integrated knowledge-based systems covering the complete product life-cycle with advanced analytics, smart decision support systems and self-learning capabilities exploiting the availability of "big data" from smart sensors, historical process files, or human-authored data; and addressing aspects, e. g. interactivity, real-time, data-fusion, imprecise computing, compressed sensing, advanced visualisation, security and privacy.

Integrated modelling, simulation and information management systems benefiting from recent advances in ICT. The Commission considers that proposals requesting a contribution from the EU between EUR 5 and 8 million would allow this area to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts. Projects are expected to stimulate pre-normative or standardisation activities related to aspects such as information/knowledge exchange, data sharing, semantic technologies, tool integration, etc. Projects must include reference implementations and demonstration and validation in minimum two comprehensive and complementary industrial use cases. Focus is on at least one of the following issues:

               Integrated information management systems for product-process-production systems that are well embedded into their social, environmental and economic context.

             Advanced computer aided technologies (CAx), modelling, simulation and decision support toolboxes tailored for novel manufacturing processes, e. g. laser-based and additive manufacturing.

For this topic, proposals should include an outline of the initial exploitation plan and business scenario, which will be developed further in the proposed project.

 

b.       Support Actions: Road mapping and constituency building for novel ICT-enabled concepts in manufacturing supporting the wide adoption of virtual, integrated, scalable, semantic factory models; merging design and production models; and integrating novel ICT for creativity. Stimulating EU-US collaboration on R&I related to modelling and simulation.

Expected impact:

  •             Increased productivity during design and ramp-up phases and for higher mass customization capacity for big enterprises as well as SMEs through access to on-demand scalable manufacturing process chains and services and through agreed data standards.
  •             Improved cost efficiency and accuracy, reliability and speed of simulation techniques for manufacturing processes and/or full complex products.
  •             Reduced time to production and optimised supply chains enabled by increased tool interoperability and data integration.
  •             Enhanced interoperability of integrated product and factory design systems and global state monitoring enabling new type of services related to the data analysis, simulations and visualization techniques in each manufacturing stage.

Types of action:

  • Research & Innovation Actions. It is expected that a minimum of one Research & Innovation Action is supported for each theme.
  • Coordination and Support Actions
  • Cross-cutting Priorities:

    International cooperation

    News flashes

    2015-05-11

    The Flash Call Info for topics FoF 8 and FoF 9 can now be found under the tab 'Call documents', just as the Flash Call Info for the other topics (FoF 10 - FoF 14).

    2015-04-29

    Call Flash info can be found under Call Documents tab

    2015-03-05

    In addition, a total of 131 proposals were submitted under the following topics:

    FoF-08-2015: 114FoF-09-2015: 17

    2015-02-12

    A total of 215 proposals were submitted in response to this call.The number of proposals for each topics is shown below:

    FoF-10-2015: 56FoF-11-2015: 35FoF-12-2015: 51FoF-13-2015: 35FoF-14-2015: 38

    2014-10-22
    The submission session is now available for: FoF-08-2015(RIA-CSA), FoF-09-2015(IA-CSA), FoF-10-2015(RIA), FoF-11-2015(IA), FoF-12-2015(IA), FoF-13-2015(RIA), FoF-14-2015(RIA)
    2014-08-20

    Call Flash info can be found under call documents

    2014-07-23

    After the update to the Horizon 2020 Work Programme of 22 July 2014,the following updates were made to the topics of this call:

    • Call budget
    • Call deadline is set to 04/02/2015
    • Scope under 'Topic Descriptions' tab
    • Eligibility conditions under 'Topic Conditions and Documents' tab

    2014-07-23

    After the update to the Horizon 2020 Work Programme of 22 July 2014, the following updates were made to the topics of this call:

    • Scope under 'Topic Descriptions' tab
    • Eligibility conditions under 'Topic Conditions and Documents' tab
    • Call budget
    2014-05-27

    A total of 243 proposals were submitted in response to this call.The number of proposals for each topics is shown below:FoF 01-2014: 56FoF 02-2014: 74FoF 03-2014: 33FoF 04-2014: 21FoF 05-2014: 28FoF 06-2014: 22FoF 07-2014: 9

    2014-03-10

    Clarification for NMP+B project proposers and evaluators on “Business Plan” and “Synergies with ESIF” - See "Call Documents"

    2013-12-23
    The submission session is now available for: FoF-01-2014(RIA-CSA), FoF-02-2014(RIA), FoF-03-2014(RIA), FoF-04-2014(IA), FoF-05-2014(RIA), FoF-06-2014(IA), FoF-07-2014(CSA)
    call topic details
    Call status: Closed
    Publication date: 2013-12-11 (11 years ago)
    Opening date: 2014-10-22 (10 years ago)
    Closing date: 2015-02-04 (10 years ago)
    Procedure: single-stage

    Budget: 68000000
    Expected grants: not specified
    News flashes

    This call topic has been appended 11 times by the EC with news.

    • 2015-05-11
      the flash call info for topics fof 8 and...
    • 2015-04-29
      call flash info can be found under call...
    • 2015-03-05
      in addition, a total of 131 proposals we...
    • 2015-02-12
      a total of 215 proposals were submitted...
    • 2014-10-22
      the submission session is now available...
    • 2014-08-20
      call flash info can be found under call...
    • 2014-07-23
      after the update to the horizon 2020 wor...
    • 2014-07-23
      after the update to the horizon 2020 wor...
    • 2014-05-27
      a total of 243 proposals were submitted...
    • 2014-03-10
      clarification for nmp+b project proposer...
    • 2013-12-23
      the submission session is now available...
    Call

    H2020-FoF-2014-2015

    Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

    There are 13 other topics in this call:

    Source information

    Showing the latest information. Found 1 version of this call topic in the F&T portal.

    Information from

    • 2024-03-30_20-33-41

    Annotations (will be publicly visible when approved)

    You must be logged in to add annotations
    No annotations yet

    Events

    This is just a very first implementation, better visualisation coming

    Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

    Call topic timeline

    What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
    1. Work programme available

      - 11 years ago

      The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

    2. Publication date

      - 11 years ago

      The call was published on the Funding & Tenders Portal.

    3. Opening date

      - 10 years ago

      The call opened for submissions.

    4. Closing date

      - 10 years ago

      Deadline for submitting a project.

    5. Time to inform applicants Estimate

      - 9 years ago

      The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

    6. Sign grant agreement Estimate

      - 9 years ago

      The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

    7. Today

    Funded Projects

    Loading...

    Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)