EUJ-3-2014
Access networks for densely located users -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalScope
Specific Challenge:
The topic focus on technologies and system approaches to realize high speed/high capacity dense local networks, as may be encountered in very high density locations where many users use high-capacity broadband applications. The goal is to develop high-performance heterogeneous access network systems which have dynamic resource allocation capability.Scope: As last-mile connection links, future network systems would comprise various broadband transmission media such as optical fibres, millimetre-wave links, etc. to add to current access technology. The objectives of this activity is to optimize link performance from points of views, such as CAPEX, OPEX, radio-wave resources and environmental constraints without compromising the applicability in wide variety of use cases such as dense business districts, conference sites, evacuation sites, schools, railway stations, etc. Research should include network architecture using service centric network control. Technological focus would be also on low-cost broadband link technologies designed for cross-layer control, and on reduction of power consumption in access networks. Life cycle assessment of hardware in the network would be a target in the topic.
Expected impact:
Better exploitation of new broadband links for short range, very high capacity communication applications in dense environments.
Key enabling technologies for the future generations of integrated/heterogeneous access network systems with improved economic, spectral and energy efficiency.
Joint identification of standardization requirements and contribution to standardization bodies and fora.
Types of action:
Research & Innovation Actions – The Commission considers that proposals requesting a contribution from the EU of EUR 1,5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
Cross-cutting Priorities:News flashes
An overview of the evaluation results (Flash Call Info) is now available under the tab 'Call documents'.
A total of 26 proposals were submitted in response to this call. The number of proposals for each topic is shown below:EUJ1 - 9EUJ2 - 3EUJ3 - 7EUJ4 - 7
As a specific arrangement for the evaluation of Call H2020-EUJ-2014, it is requested to include a final draft of a Coordination agreement.Therefore the Proposal Template has been modified to include a part 4.3 as the correct placefor thecoordination agreement. The new version of theProposal Template (Technical Annex Section 4-5) can be downloaded from the Submission Service.
Publication date: 2014-01-07 (11 years ago)
Opening date: 2014-01-07 (11 years ago)
Closing date: 2014-04-10 (11 years ago)
Procedure: single-stage
Budget: 6000000
Expected grants: not specified
This call topic has been appended 4 times by the EC with news.
-
2014-09-16
an overview of the evaluation results (f... -
2014-05-12
a total of 26 proposals were submitted i... -
2014-03-24
as a specific arrangement for the evalua... -
2014-01-23
the submission session is now available...
H2020-EUJ-2014
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 3 other topics in this call:
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-31_11-16-53
Annotations (will be publicly visible when approved)
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 11 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Publication date
- 11 years agoThe call was published on the Funding & Tenders Portal.
-
Opening date
- 11 years agoThe call opened for submissions.
-
Closing date
- 11 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 10 years agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 10 years agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)