HORIZON-JU-SNS-2024-STREAM-B-01-01

System Architecture - Standardisation and Follow-up/PoCs -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal
Expected Outcome:

The target outcomes address consolidation of results in the field of:

  • Architectures providing built-in capabilities/mechanisms that enable the seamless integration of multiple system segments (e.g., public and private, terrestrial and satellite, inter-operation among operators, computing and networking) and allow the establishment of innovative business models, including the migration and deployment models. Increased global resilience (at a technical and economical level) is expected to be a key outcome of these architecture innovations.
  • Innovative solutions for native and trustworthy AI for telecommunication to support end-to-end operational processes.
  • Mechanisms (e.g., Digital twinning frameworks) to be used for the improved management and operation of 6G networks.
  • New communication mechanisms and methods that new system level communication concepts and associated protocols and methods that will enable optimized communications such as shared situational awareness and dynamic capabilities among all stakeholders (verticals, service providers and network operators) through appropriate interfaces including APIs.
  • Enhanced data plane frameworks that guarantee economically and technically sustainable architectures with cross-flow resource management capabilities.
  • Algorithms, software and hardware implementations paired with organisational processes where appropriate, which can be used for PoC and later trials systems.
  • Dissemination of solutions for international consensus building, which can be exploited in standardisation activities.
  • Contributions to international standardisation, considering also topics related to backward compatibility and further evolution of the 6G architecture.
Objective:

Please refer to the "Specific Challenges and Objectives" section for Stream B in the Work Programme, available under ‘Topic Conditions and Documents - Additional Documents’.

Scope:

The focus of this Strand is on several complementary issues mentioned below and applicants may select one or more of these issues.

  • New design approaches for 6G system architecture systems in all aspects of control, data and management plane including further advances that emerge out of the collaboration of individual networks or subsystems owned by different stakeholders, at computing and networking levels. These subsystems may potentially include Non-Public Networks (NPN) - including short/extreme connectivity - and/or NTN segments. This may require rethinking key service and network interfaces, structure and enablers covering simplification, sustainability, energy-efficiency, resource or asset sharing, resource configuration orchestration and allocation, robustness, and security, federation and mobility across networks. For the new advanced 6G services, it is desirable to enhance networks with the capability to guarantee a certain performance (i.e., latency, reliability, throughput) across different operation conditions (e.g., using overlay time synchronisation). Negotiation, accounting and billing across multiple systems, as well proper authentication, authorisation are also in scope. The work covers the migration/deployment strategies that may be most appropriate in EU deployment scenarios.
  • Native and trustworthy integration of AI for telecommunications, including edge cloud continuum. Native integration of AI/ML is in scope to implement end-to-end adaptive decision-making ensuring conflict resolution and a high degree of trustworthiness while addressing privacy and explainability issues, operating at different time scales with expected impact on energy and network as well as other services’ performance.
  • Network exposure to vertical application developers including protocols, algorithms, architectures and solutions for user-to-systems interface. Allowing exposition of available resources and required/value-added service attributes (performance, security, sustainability) related to the user applications and getting semantic of the requirements from user applications explicitly or implicitly. Specific approaches for relevant vertical ecosystems are in scope.
  • Mechanisms, leading to partial or complete Digital network twinning, applied in 6G including the dynamic virtual representation of critical components and systems, the simulation and modelling tools for large-scale real-time environments; derivation of network models (digital twins) from traffic analysis; These models should be created in a trustworthy (secure) and privacy preserving way. Digital twin models as a core for network planning, management and control are also in scope.
  • New Data Transfer Paradigms, considering enhanced data plane (including IP framework evolution) techniques with deep Edge integration. In scope are considered Compute-Interconnection (CIC) architectural frameworks expected to enable data plane evolution that is economically and technically sustainable. Cross-flow and cross-endpoint data plane mechanisms and protocols for cross-flow resource and timing (latency) control.

The scope includes, where relevant, harmonisation/coordination with Member States or Associated Countries 6G initiatives. Any produced PoCs should be implemented in a way that their integration in SNS WP2025-26 Stream C and/or Stream D project will be possible (e.g., open-source solutions, appropriate documentation, support after the completion of the project).

News flashes

2024-04-19

PROPOSAL NUMBERS

Call HORIZON-JU-SNS-2024 has closed on the 18 April 2024 at 17.00.00

109 proposals have been submitted.

The breakdown per topic is:

  • HORIZON-JU-SNS-2024-STREAM-B-01-01: 26 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-02: 26 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-03: 15 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-04: 15 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-05: 3 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-06: 1 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-07: 2 proposals
  • HORIZON-JU-SNS-2024-STREAM-B-01-08: 8 proposals
  • HORIZON-JU-SNS-2024-STREAM-C-01-01: 2 proposals
  • HORIZON-JU-SNS-2024-STREAM-CSA-01: 1 proposals
  • HORIZON-JU-SNS-2024-STREAM-D-01-01: 10 proposals

Evaluation results are expected to be communicated in July 2024

2024-01-16
The submission session is now available for: HORIZON-JU-SNS-2024-STREAM-D-01-01(HORIZON-JU-IA), HORIZON-JU-SNS-2024-STREAM-B-01-08(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-B-01-03(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-B-01-06(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-C-01-01(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-B-01-07(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-B-01-01(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-CSA-01(HORIZON-JU-CSA), HORIZON-JU-SNS-2024-STREAM-B-01-05(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-B-01-04(HORIZON-JU-RIA), HORIZON-JU-SNS-2024-STREAM-B-01-02(HORIZON-JU-RIA)
2023-12-08

Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.

call topic details
Call status: Closed
Publication date: 2023-12-04 (1 year ago)
Opening date: 2024-01-16 (1 year ago)
Closing date: 2024-04-18 (1 year ago)
Procedure: single-stage

Budget: 16000000
Expected grants: 2
Contribution: 8000000 - 8000000
News flashes

This call topic has been appended 3 times by the EC with news.

  • 2024-04-19
    proposal numberscall horizon-ju-sns-2024...
  • 2024-01-16
    the submission session is now available...
  • 2023-12-08
    please note that the funding rates in th...
Source information

Showing the latest information. Found 3 versions of this call topic in the F&T portal.

Information from

  • 2024-11-23_03-30-19
  • 2024-07-04_15-01-30
  • 2024-03-30_14-17-54

Check the differences between the versions.

Annotations (will be publicly visible when approved)

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 1 year ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Publication date

    - 1 year ago

    The call was published on the Funding & Tenders Portal.

  3. Opening date

    - 1 year ago

    The call opened for submissions.

  4. Closing date

    - 1 year ago

    Deadline for submitting a project.

  5. Time to inform applicants Estimate

    - 8 months ago

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  6. Sign grant agreement Estimate

    - 5 months ago

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.