Closed HORIZON-CL4-2024-RESILIENCE-01-04 HORIZON

Technologies for processing and refining of critical raw materials (IA)

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects outcomes will enable achieving the expected impacts of the destination by increasing access to primary raw materials and secondary raw materials, in particular critical raw materials[1] for EU industrial value chains and strategic sectors.

Projects are expected to contribute to the following outcomes:

-Increase recovery rates of valuable raw materials, particularly critical raw materials from low grade or complex ores and/or from extractive waste;

-Significantly increase economic performance in terms of higher material-, water-, energy- and cost-efficiency and flexibility in minerals processing and metallurgical processes;

-Significantly improve the health, safety and environmental performance of the operations throughout the whole life cycle which is considered, including a reduction in waste, wastewater and emissions generation and a better recovery of resources from generated waste;

-Improve responsible supply of raw materials to Europe in line with the EU principles for sustainable raw materials, which are a non-regulatory set of principles based on the EU acquis. They set out requirements for sustainable raw materials and extraction and processing in Europe in terms of social, environmental and economic performance.[2]Actions are expected to contribute to the implementation the EU action plan on Critical Raw Materials.[3]

Scope:

Actions should demonstrate new or improved systems integrating relevant processing and refining technologies for better recovery of raw materials from low grade and/or complex ores from extractive wastes, less waste, higher energy efficiency. The action could also reduce the content of toxic elements or compounds in the resulting material products. The actions should target minerals and metals, particularly critical raw materials.

The solution proposed should be flexible enough to adapt to different or variable primary and secondary raw materials grades and should be supported by efficient and robust process control. Where relevant, any solution proposed for the reduction of the content of toxic elements or compounds in the resulting materials should also include the appropriate management of the hazardous substances removed.

Actions should develop intelligent and innovative production systems which better utilise natural resources by minimising losses during waste-rock separation in an optimised and energy-efficient process and by minimising use of water

Recycling of end-of-life products is excluded from this topic, though joint processing of waste streams originating from end-of-life products recycling could be included and has to be duly justified.

Actions should envisage clustering activities with other relevant selected projects for cross-projects co-operation, consultations and joint activities on cross-cutting issues and share of results as well as participating in joint meetings and communication events. To this end proposals should foresee a dedicated work package and/or task, and earmark the appropriate resources accordingly.

Actions should facilitate the market uptake of solutions developed through industrially- and user-driven multidisciplinary consortia covering the relevant value chain and should consider standardisation aspects when relevant. The action should also include the analysis of financial opportunities ensuring the market exploitation and replication of the circular business model behind the developed solutions as new processes, products and/or services.

Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination. For TRLs 6-7, a credible strategy to achieve future full-scale deployment in the EU is expected, indicating the commitments of the industrial partners after the end of the project.

In this topic the integration of the gender dimension (sex and/or gender analysis) in research and innovation content is not a mandatory requirement, however, should you consider it to be of relevance for your specific proposal, you are strongly encouraged to do it.

null

Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.

[1] https://ec.europa.eu/growth/sectors/raw-materials/areas-specific-interest/critical-raw-materials_en

[2] https://op.europa.eu/en/publication-detail/-/publication/6d541f66-0f81-11ec-9151-01aa75ed71a1

[3] COM (2020) 474

News flashes

2024-05-24
 CALL UPDATE: FLASH EVALUATION RESULTSHORIZON-CL4-2024-RESILIENCE-01

 

EVALUATION results

 

Published: 07.12.2022

Deadline: 07.02.2024

Available budget: EUR 160,200,000

 

The results of the evaluation for each topic are as follows:

 

 

HORIZON-CL4-2024-RESILIENCE-01-01

HORIZON-CL4-2024- RESILIENCE-01-04

Number of proposals submitted (including proposals transferred from or to other calls)

20

17

Number of inadmissible proposals

1

0

Number of ineligible proposals

0

0

Number of above-threshold proposals

17

11

Total budget requested for above-threshold proposals, EUR

86,261,262.88 €

78,124,112.44 €

Number of proposals retained for funding

4

3

Number of proposals in the reserve list

1

1

Funding threshold *

13

14

Ranking distribution:

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

3

3

Number of proposals with scores lower than 14 and higher or equal to 13

1

3

Number of proposals with scores lower than 13 and higher or equal to 10                 

13

5

 

 

HORIZON-CL4-2024- RESILIENCE-01-08

HORIZON-CL4-2024- RESILIENCE-01-10

Number of proposals submitted (including proposals transferred from or to other calls)

5

4

Number of inadmissible proposals

0

0

Number of ineligible proposals

0

0

Number of above-threshold proposals

5

4

Total budget requested for above-threshold proposals, EUR

89,671,217.86 €

9,400,822.70 €

Number of proposals retained for funding

2

1

Number of proposals in the reserve list

1

1

Funding threshold *

12

12

Ranking distribution:

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

0

0

Number of proposals with scores lower than 14 and higher or equal to 13

0

0

Number of proposals with scores lower than 13 and higher or equal to 10                 

5

4

 

 

HORIZON-CL4-2024- RESILIENCE-01-11

HORIZON-CL4-2024- RESILIENCE-01-24

Number of proposals submitted (including proposals transferred from or to other calls)

13

12

Number of inadmissible proposals

1

0

Number of ineligible proposals

1

2

Number of above-threshold proposals

9

8

Total budget requested for above-threshold proposals, EUR

64,732,627.92 €

96,409,126.08 €

Number of proposals retained for funding

2

4

Number of proposals in the reserve list

1

1

Funding threshold *

12

11.5

Ranking distribution:

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

0

0

Number of proposals with scores lower than 14 and higher or equal to 13

1

2

Number of proposals with scores lower than 13 and higher or equal to 10                 

8

6

 

 

HORIZON-CL4-2024- RESILIENCE-01-41

Number of proposals submitted (including proposals transferred from or to other calls)

41

Number of inadmissible proposals

0

Number of ineligible proposals

2

Number of above-threshold proposals

19

Total budget requested for above-threshold proposals, EUR

94,841,031.66 €

Number of proposals retained for funding

2

Number of proposals in the reserve list

2

Funding threshold *

14

Ranking distribution:

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

3

Number of proposals with scores lower than 14 and higher or equal to 13

2

Number of proposals with scores lower than 13 and higher or equal to 10                      

14

 

* Proposals with the same score were ranked according to the priority order procedure set out in the call conditions (for HE, in the General Annexes to the Work Programme or specific arrangements in the specific call/topic conditions).

 

Summary of observer report:

 

According the observed consensus meetings and panel ranking meeting, the evaluation procedures were carried with transparency, efficiency, fairness, consistency, impartiality with homogenous criteria, even among the different topics coordinated by different topic coordinators, in compliance with the applicable evaluation rules for each stage of the selection exercise (individual evaluation reports, consensus reports, panel ranking): the evaluation process was carried out in full accordance with the Horizon Europe documents on proposal evaluation.

 

The IT utilised systems (SEP and CIRCABC) worked very well and they are clear and useful for the evaluation procedures with many supporting documents to help the expert’s work. Webex tool was mainly used for the meetings, and it worked very well permitting a good interaction level for the experts during their discussion about each evaluated proposal.

 

In this way all the procedures to select the best proposal were very adequate to define the final ranking in order to select the best projects to be financed according to the call’s indications.

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

 

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

 

2024-05-24
 CALL UPDATE: FLASH EVALUATION RESULTSHORIZON-CL4-2024-RESILIENCE-01

 

EVALUATION results

 

Published: 07.12.2022

Deadline: 07.02.2024

Available budget: EUR 160,200,000

 

The results of the evaluation for each topic are as follows:

 

 

HORIZON-CL4-2024-RESILIENCE-01-01

HORIZON-CL4-2024- RESILIENCE-01-04

Number of proposals submitted (including proposals transferred from or to other calls)

20

17

Number of inadmissible proposals

1

0

Number of ineligible proposals

0

0

Number of above-threshold proposals

17

11

Total budget requested for above-threshold proposals, EUR

86,261,262.88 €

78,124,112.44 €

Number of proposals retained for funding

4

3

Number of proposals in the reserve list

1

1

Funding threshold *

13

14

Ranking distribution:

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

3

3

Number of proposals with scores lower than 14 and higher or equal to 13

1

3

Number of proposals with scores lower than 13 and higher or equal to 10                 

13

5

 

 

HORIZON-CL4-2024- RESILIENCE-01-08

HORIZON-CL4-2024- RESILIENCE-01-10

Number of proposals submitted (including proposals transferred from or to other calls)

5

4

Number of inadmissible proposals

0

0

Number of ineligible proposals

0

0

Number of above-threshold proposals

5

4

Total budget requested for above-threshold proposals, EUR

89,671,217.86 €

9,400,822.70 €

Number of proposals retained for funding

2

1

Number of proposals in the reserve list

1

1

Funding threshold *

12

12

Ranking distribution:

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

0

0

Number of proposals with scores lower than 14 and higher or equal to 13

0

0

Number of proposals with scores lower than 13 and higher or equal to 10                 

5

4

 

 

HORIZON-CL4-2024- RESILIENCE-01-11

HORIZON-CL4-2024- RESILIENCE-01-24

Number of proposals submitted (including proposals transferred from or to other calls)

13

12

Number of inadmissible proposals

1

0

Number of ineligible proposals

1

2

Number of above-threshold proposals

9

8

Total budget requested for above-threshold proposals, EUR

64,732,627.92 €

96,409,126.08 €

Number of proposals retained for funding

2

4

Number of proposals in the reserve list

1

1

Funding threshold *

12

11.5

Ranking distribution:

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

0

0

Number of proposals with scores lower than 14 and higher or equal to 13

1

2

Number of proposals with scores lower than 13 and higher or equal to 10                 

8

6

 

 

HORIZON-CL4-2024- RESILIENCE-01-41

Number of proposals submitted (including proposals transferred from or to other calls)

41

Number of inadmissible proposals

0

Number of ineligible proposals

2

Number of above-threshold proposals

19

Total budget requested for above-threshold proposals, EUR

94,841,031.66 €

Number of proposals retained for funding

2

Number of proposals in the reserve list

2

Funding threshold *

14

Ranking distribution:

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

3

Number of proposals with scores lower than 14 and higher or equal to 13

2

Number of proposals with scores lower than 13 and higher or equal to 10                      

14

 

* Proposals with the same score were ranked according to the priority order procedure set out in the call conditions (for HE, in the General Annexes to the Work Programme or specific arrangements in the specific call/topic conditions).

 

Summary of observer report:

 

According the observed consensus meetings and panel ranking meeting, the evaluation procedures were carried with transparency, efficiency, fairness, consistency, impartiality with homogenous criteria, even among the different topics coordinated by different topic coordinators, in compliance with the applicable evaluation rules for each stage of the selection exercise (individual evaluation reports, consensus reports, panel ranking): the evaluation process was carried out in full accordance with the Horizon Europe documents on proposal evaluation.

 

The IT utilised systems (SEP and CIRCABC) worked very well and they are clear and useful for the evaluation procedures with many supporting documents to help the expert’s work. Webex tool was mainly used for the meetings, and it worked very well permitting a good interaction level for the experts during their discussion about each evaluated proposal.

 

In this way all the procedures to select the best proposal were very adequate to define the final ranking in order to select the best projects to be financed according to the call’s indications.

 

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

 

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

 

2024-02-07
 PROPOSAL SUBMISSION  Call HORIZON-CL4-2024-RESILIENCE-01 was closed on 07/02/2024. 112 proposals have been submitted. The breakdown per topic: HORIZON-CL4-2024-RESILIENCE-01-01: 20 proposalsHORIZON-CL4-2024-RESILIENCE-01-04: 17 proposalsHORIZON-CL4-2024-RESILIENCE-01-08: 5 proposalsHORIZON-CL4-2024-RESILIENCE-01-10: 4 proposalsHORIZON-CL4-2024-RESILIENCE-01-11: 13 proposalsHORIZON-CL4-2024-RESILIENCE-01-24: 12 proposalsHORIZON-CL4-2024-RESILIENCE-01-41: 41 proposals Evaluation results are expected to be communicated in the 2nd half of June 2024. 
2024-02-07
 PROPOSAL SUBMISSION  Call HORIZON-CL4-2024-RESILIENCE-01 was closed on 07/02/2024. 112 proposals have been submitted. The breakdown per topic: HORIZON-CL4-2024-RESILIENCE-01-01: 20 proposalsHORIZON-CL4-2024-RESILIENCE-01-04: 17 proposalsHORIZON-CL4-2024-RESILIENCE-01-08: 5 proposalsHORIZON-CL4-2024-RESILIENCE-01-10: 4 proposalsHORIZON-CL4-2024-RESILIENCE-01-11: 13 proposalsHORIZON-CL4-2024-RESILIENCE-01-24: 12 proposalsHORIZON-CL4-2024-RESILIENCE-01-41: 41 proposals Evaluation results are expected to be communicated in the 2nd half of June 2024. 
2023-09-19
The submission session is now available for: HORIZON-CL4-2024-RESILIENCE-01-08(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-24(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-04(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-10(HORIZON-CSA), HORIZON-CL4-2024-RESILIENCE-01-41(HORIZON-CSA), HORIZON-CL4-2024-RESILIENCE-01-11(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-01(HORIZON-RIA)
2023-09-19
The submission session is now available for: HORIZON-CL4-2024-RESILIENCE-01-08(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-24(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-04(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-10(HORIZON-CSA), HORIZON-CL4-2024-RESILIENCE-01-41(HORIZON-CSA), HORIZON-CL4-2024-RESILIENCE-01-11(HORIZON-IA), HORIZON-CL4-2024-RESILIENCE-01-01(HORIZON-RIA)
call topic details
Call status: Closed
Opening date: 2023-09-19 (3 years ago)
Closing date: 2024-02-07 (2 years ago)
Procedure: single-stage

Budget: 22,000,000
Expected grants: 3
Contribution: 7,300,000 - 7,300,000
News flashes

This call topic has been appended 6 times by the EC with news.

  • 2024-05-24
     call update: flash evaluation resu...
  • 2024-05-24
     call update: flash evaluation resu...
  • 2024-02-07
     proposal submission  cal...
  • 2024-02-07
     proposal submission  cal...
  • 2023-09-19
    the submission session is now available...
  • 2023-09-19
    the submission session is now available...
Call

HORIZON-CL4-2024-RESILIENCE-01

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 6 other topics in this call:

Source information

Showing the latest information. Found 223 versions of this call topic in the F&T portal.

Information from

  • 2026-10-15_05-07-42
  • 2026-10-15_05-07-20
  • 2026-10-14_05-03-38
  • 2026-10-14_05-03-15
  • 2026-10-13_05-07-03
  • 2026-10-13_05-06-07
  • 2026-10-12_08-02-56
  • 2026-10-12_08-02-11
  • 2026-10-11_08-01-39
  • 2026-10-11_08-00-52
  • 2026-10-10_08-04-05
  • 2026-10-10_08-03-21
  • 2026-10-09_08-01-03
  • 2026-10-09_08-00-28
  • 2026-10-08_08-03-29
  • 2026-10-08_08-02-47
  • 2026-10-07_07-59-28
  • 2026-10-07_07-58-42
  • 2026-10-06_08-01-48
  • 2026-10-06_08-01-28
  • 2026-10-05_07-58-53
  • 2026-10-05_07-57-46
  • 2026-10-04_07-59-38
  • 2026-10-04_07-58-35
  • 2026-10-03_07-58-05
  • 2026-10-03_07-57-17
  • 2026-10-02_07-59-27
  • 2026-10-02_07-59-04
  • 2026-10-01_08-00-59
  • 2026-10-01_08-00-36
  • 2026-09-29_08-27-18
  • 2026-09-29_08-26-52
  • 2026-09-28_08-26-59
  • 2026-09-28_08-26-35
  • 2026-09-27_08-25-19
  • 2026-09-27_08-24-47
  • 2026-09-26_08-22-43
  • 2026-09-26_08-22-15
  • 2026-09-25_08-24-22
  • 2026-09-25_08-23-57
  • 2026-09-24_08-24-59
  • 2026-09-24_08-24-31
  • 2026-09-23_08-22-24
  • 2026-09-23_08-21-58
  • 2026-09-22_08-22-20
  • 2026-09-22_08-21-54
  • 2026-09-21_08-17-59
  • 2026-09-21_08-17-37
  • 2026-09-20_08-19-16
  • 2026-09-20_08-18-49
  • 2026-09-19_08-18-29
  • 2026-09-19_08-18-01
  • 2026-09-18_08-22-32
  • 2026-09-18_08-22-07
  • 2026-09-17_08-16-33
  • 2026-09-17_08-16-06
  • 2026-09-16_08-14-07
  • 2026-09-16_08-13-42
  • 2026-09-15_08-16-20
  • 2026-09-15_08-15-54
  • 2026-09-14_08-15-21
  • 2026-09-14_08-14-55
  • 2026-09-13_08-15-48
  • 2026-09-13_08-15-18
  • 2026-09-12_08-18-29
  • 2026-09-12_08-18-05
  • 2026-09-11_08-17-59
  • 2026-09-11_08-17-33
  • 2026-09-10_08-16-22
  • 2026-09-10_08-15-49
  • 2026-09-09_08-16-33
  • 2026-09-09_08-16-12
  • 2026-09-08_08-16-19
  • 2026-09-08_08-15-54
  • 2026-09-07_08-13-22
  • 2026-09-07_08-12-58
  • 2026-09-06_08-14-05
  • 2026-09-06_08-13-44
  • 2026-09-05_08-13-27
  • 2026-09-05_08-13-05
  • 2026-09-04_08-11-43
  • 2026-09-04_08-11-16
  • 2026-09-03_08-11-40
  • 2026-09-03_08-11-13
  • 2026-09-02_08-13-21
  • 2026-09-02_08-12-56
  • 2026-09-01_08-11-59
  • 2026-09-01_08-11-31
  • 2026-08-31_08-14-24
  • 2026-08-31_08-14-01
  • 2026-08-30_08-07-40
  • 2026-08-30_08-07-14
  • 2026-08-29_08-09-02
  • 2026-08-29_08-08-33
  • 2026-08-28_08-11-57
  • 2026-08-28_08-11-29
  • 2026-08-27_08-03-23
  • 2026-08-27_08-02-58
  • 2026-08-25_08-09-21
  • 2026-08-25_08-09-00
  • 2026-08-24_08-03-55
  • 2026-08-24_08-03-25
  • 2026-08-23_08-03-30
  • 2026-08-23_08-03-01
  • 2026-08-22_08-03-40
  • 2026-08-22_08-03-16
  • 2026-08-21_07-59-32
  • 2026-08-21_07-59-09
  • 2026-08-20_08-02-45
  • 2026-08-20_08-02-18
  • 2026-08-19_08-02-00
  • 2026-08-19_08-01-36
  • 2026-08-18_07-58-49
  • 2026-08-18_07-58-27
  • 2026-08-17_07-58-14
  • 2026-08-17_07-57-53
  • 2026-08-16_07-54-57
  • 2026-08-16_07-54-30
  • 2026-08-15_07-56-30
  • 2026-08-15_07-56-03
  • 2026-08-14_07-56-07
  • 2026-08-14_07-55-46
  • 2026-08-13_07-56-06
  • 2026-08-13_07-55-45
  • 2026-08-12_07-54-51
  • 2026-08-12_07-54-25
  • 2026-08-11_07-55-09
  • 2026-08-11_07-54-44
  • 2026-08-10_07-52-00
  • 2026-08-10_07-51-39
  • 2026-08-09_07-51-30
  • 2026-08-09_07-51-02
  • 2026-08-08_07-51-06
  • 2026-08-08_07-50-43
  • 2026-08-07_07-49-28
  • 2026-08-07_07-49-06
  • 2026-08-06_07-50-31
  • 2026-08-06_07-50-08
  • 2026-08-05_07-51-56
  • 2026-08-05_07-51-31
  • 2026-08-04_07-51-49
  • 2026-08-04_07-51-23
  • 2026-08-03_07-49-43
  • 2026-08-03_07-48-26
  • 2026-08-02_07-50-11
  • 2026-08-02_07-49-50
  • 2026-08-01_07-50-02
  • 2026-08-01_07-49-40
  • 2026-07-31_07-48-26
  • 2026-07-31_07-48-00
  • 2026-07-30_07-47-45
  • 2026-07-30_07-47-20
  • 2026-07-29_07-48-57
  • 2026-07-29_07-48-31
  • 2026-07-28_07-48-40
  • 2026-07-28_07-48-12
  • 2026-07-27_07-44-49
  • 2026-07-27_07-44-24
  • 2026-07-26_07-43-04
  • 2026-07-26_07-42-36
  • 2026-07-25_07-43-26
  • 2026-07-25_07-43-05
  • 2026-07-24_07-43-52
  • 2026-07-24_07-43-30
  • 2026-07-23_07-42-46
  • 2026-07-23_07-42-23
  • 2026-07-22_07-44-41
  • 2026-07-22_07-44-09
  • 2026-07-21_07-41-50
  • 2026-07-21_07-41-08
  • 2026-07-20_07-42-04
  • 2026-07-20_07-41-43
  • 2026-07-19_07-41-50
  • 2026-07-19_07-40-42
  • 2026-07-18_07-42-16
  • 2026-07-18_07-41-06
  • 2026-07-17_07-41-16
  • 2026-07-17_07-39-59
  • 2026-07-16_07-27-24
  • 2026-07-16_07-27-07
  • 2026-07-15_07-26-32
  • 2026-07-15_07-26-14
  • 2026-07-14_07-25-53
  • 2026-07-14_07-25-35
  • 2026-07-13_07-26-27
  • 2026-07-13_07-26-10
  • 2026-07-12_07-26-44
  • 2026-07-12_07-26-27
  • 2026-07-11_07-25-51
  • 2026-07-11_07-25-33
  • 2026-07-10_07-25-32
  • 2026-07-10_07-25-19
  • 2026-07-09_07-25-23
  • 2026-07-09_07-25-03
  • 2026-07-08_07-25-19
  • 2026-07-08_07-24-54
  • 2026-07-07_07-24-34
  • 2026-07-07_07-24-18
  • 2026-07-06_07-25-12
  • 2026-07-06_07-24-48
  • 2026-07-05_07-22-39
  • 2026-07-05_07-22-07
  • 2026-07-04_07-23-58
  • 2026-07-04_07-23-30
  • 2026-07-03_07-23-33
  • 2026-07-03_07-23-13
  • 2026-07-02_07-22-43
  • 2026-07-02_07-22-09
  • 2026-07-01_07-35-26
  • 2026-07-01_07-34-50
  • 2026-06-30_09-48-57
  • 2026-06-30_07-32-31
  • 2026-06-29_11-34-50
  • 2026-06-29_07-35-09
  • 2026-06-28_09-31-43
  • 2026-06-28_07-31-51
  • 2026-06-27_09-32-16
  • 2026-06-27_07-32-31
  • 2026-06-27_07-31-59
  • 2026-02-18_06-56-30
  • 2025-06-07_03-32-33
  • 2024-07-11_18-29-29
  • 2024-03-30_14-18-25

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Grant agreement signed · 07 Oct 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

19 Sep 2023

Call closes

07 Feb 2024

Outcome expected

07 Jul 2024 · est.

Call published

30 Sep 2024

Grant agreement signed

07 Oct 2024 · est.

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    19 Sep 2023 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    07 Feb 2024 · 2 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    07 Jul 2024 · 2 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

  6. Grant agreement signed Estimated

    07 Oct 2024 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal