Closed HORIZON-JU-SNS-2023-STREAM-B-01-02 HORIZON

Wireless Communication Technologies and Signal Processing

Call text (as on F&T portal)

View on F&T portal
Expected Outcome:

The target outcomes include:

  • Wireless technologies and systems capable to meet expected 6G radio capabilities such as Tbps data throughput, sub-ms latency, extremely high reliability, massive mMTC, extreme energy and spectrum efficiency, very high security, and cm-level accuracy localisation, across a range of frequency bands mostly focusing on up to millimetre wave solutions.
  • Innovative RAN (Radio Access Network) solutions supporting multi-band operation, wireless caching, and integrated communication sensing techniques.
  • Technologies enabling support of new higher efficiency mobile communication approaches, such as cell free networking, massive MIMO or Large Intelligent Surfaces with capability to drastically reduce energy consumption and to control EMF exposure levels.
  • Applicability and validation of innovative AI/ML based architectures to control adaptive L1/L2 functions with optimised feedback control and operations.
  • Solutions enabling entire new wireless application domains and based on integration of wireless communications and sensing.
  • Solutions to optimise sustainability issues, including energy efficiency visual acceptability and minimisation of urban visual pollution.
Objective:

Please refer to the "Specific Challenges and Objectives" section for Stream B in the Work Programme, available under ‘Topic Conditions and Documents - Additional Documents’.

Scope:

Note: The focus of this Strand is on techniques to improve the performance of radio links and systems for 6G communications. Physical layer of THz communications has been extensively covered by projects selected in the first SNS call and is subsequently not expected to be a strong focus for this topic. Moreover, the scope covers the design of 6G RAN systems. The focus of this Strand is on several complementary issues mentioned below and applicants may select one or more of those:

  • New physical layer technologies up to millimeter wave. This includes both new channel modulation and coding schemes, new adaptive waveform designs, and advanced link-layer random and multiple access strategies, this includes non-orthogonal approaches (e.g., NOMA, RSMA). Support to innovative channel coding approaches towards “error free” channel transmission up to millimeter wave for technologies, including signal shaping loss removal. It should solve current bottlenecks in implementation issues such as computational complexity, algorithm parallelisation, energy efficiency, etc. whilst supporting (potentially cumulatively, depending on the scenario) extremely high throughput (hundreds of Gigabits per second); low latency; high reliability; and extreme low latency. It should also support scalability of future Machine Type Communication with minimum protocol overhead and energy consumption. Solutions should be compatible with increasingly massive MIMO-implementations and contribute to the future modulation and coding schemes, possibly mixing data-driven and model-driven approaches, as required for 6G, retaining reliable, energy-efficient characteristics.
  • Extreme exploitation of MIMO technologies up to millimeter wave range. This includes ultra-massive MIMO and distributed and cell-free massive MIMO (including intelligent reflecting surfaces). The work should encompass distributed implementations of (potentially cell-free) massive MIMO encompassing a very large number of antennas, with centralized and distributed algorithms for coordinated transmission/reception, involving large numbers of users and considering implementable MIMO predistortion for wideband massive arrays.
  • Human-friendly Radio systems: Support innovative antenna and physical layer technology for higher acceptability of radio infrastructures by citizens. It covers new antennas and new antenna systems, including antennas arrays (e.g. massive MIMO systems), that need to visually blend seamlessly in the urban landscape through use of new designs, in the context of an increased density of base stations and more complex antennas to support higher frequency ranges. It also covers antenna systems for EMF control and awareness to minimise human exposure.
  • Spectrum Re-farming and Reutilisation: Support future high bandwidth demand and versatile spectrum usage requirements by multiplicity of applications through optimised spectrum management, sharing and dynamic application aware allocation. It covers spectrum reutilisation between RAT’s, including NTN access, and addresses new THz spectrum. Novel approaches with use of AI/ML technology for real-time spectrum efficiency is in scope. It also covers specific sharing scenarios for unlicensed spectrum use, and fundamental work on these challenges for new Terahertz bands will also be needed.
  • Seamless integration of multiple frequency bands across a unified energy, EMF, and spectrum efficient framework including unlicensed bands and potential optical access. Open and disaggregated solutions may be considered also in scope.
  • Machine learning empowered physical layer evolutions: The ambition is to develop an overall enhanced RAN adaptive and intelligent, with complexity increasing at the Radio Unit (RU) end, moving towards semantic-oriented communications. The scope aims to cover the overall physical layer, and the associated radio building blocks and communication protocols, with reduced complexity in the neural network modelling of multidimensional nonlinear effects.
  • Optimal usage of wireless edge caching: The ambition is in developing advanced methods and protocols, including concepts able to improve radio link KPIs, such as energy efficiency, spectral efficiency, capacity, throughput, reliability, quality of experience (QoE), or investigate promising over-the-air computing paradigms.
  • Novel techniques for integrated sensing and communication: the goal is for radical communication work to be complemented by work in the field of location and sensing capabilities for devices. The work requires radical new distributed and cooperative sensing, sensing aided communications, and multi-band sensing technology, as well as integrated waveform design.

News flashes

2023-07-31

EVALUATION results (corrigendum):

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 132 million

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: EUR 422,251,119.57

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-07-31

EVALUATION results

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 49 000 000

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: 422,251,119.57 €

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-07-31

EVALUATION results (corrigendum):

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 132 million

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: EUR 422,251,119.57

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-07-31

EVALUATION results

Published: 15/12/2022

Deadline: 25/04/2023

Available budget: EUR 49 000 000

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 112

Number of inadmissible proposals: 0

Number of ineligible proposals: 0

Number of above-threshold proposals: 91

Total budget requested for above-threshold proposals: 422,251,119.57 €

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-JU-SNS-2023 has closed on the 25 April 2023 at 17.00.00.

112 proposals have been submitted.

The breakdown per topic is:

  • HORIZON-JU-SNS-2023-STREAM-B-01-01: 34 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-02: 26 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-03: 17 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-04: 13 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-05: 6 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-06: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-C-01-01: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-CSA-01: 1 proposal
  • HORIZON-JU-SNS-2023-STREAM-D-01-01: 7 proposals.

Evaluation results are expected to be communicated in July 2023.

2023-04-26

PROPOSAL NUMBERS

Call HORIZON-JU-SNS-2023 has closed on the 25 April 2023 at 17.00.00.

112 proposals have been submitted.

The breakdown per topic is:

  • HORIZON-JU-SNS-2023-STREAM-B-01-01: 34 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-02: 26 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-03: 17 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-04: 13 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-05: 6 proposals
  • HORIZON-JU-SNS-2023-STREAM-B-01-06: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-C-01-01: 4 proposals
  • HORIZON-JU-SNS-2023-STREAM-CSA-01: 1 proposal
  • HORIZON-JU-SNS-2023-STREAM-D-01-01: 7 proposals.

Evaluation results are expected to be communicated in July 2023.

2023-03-21

Following theCouncil Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.

2023-03-21

Following theCouncil Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties). In this case, co-applicants will be invited to remove or replace that entity /or to change its status into associated partner. Tasks and budget may be redistributed accordingly.

2023-01-17

Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.

2023-01-17
The submission session is now available for: HORIZON-JU-SNS-2023-STREAM-B-01-03(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-05(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-01(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-D-01-01(HORIZON-JU-IA), HORIZON-JU-SNS-2023-STREAM-B-01-02(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-04(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-06(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-CSA-01(HORIZON-JU-CSA), HORIZON-JU-SNS-2023-STREAM-C-01-01(HORIZON-JU-RIA)
2023-01-17

Please note that the funding rates in this topic are:100% for non-for-profit organizationsand90% with respect to for-profit organizations. Unfortunately, the maximum funding rate in the budget table is set to 100%. We kindly ask allfor-profit organizationsto make a manual calculation andrequest only 90% of the budget.

2023-01-17
The submission session is now available for: HORIZON-JU-SNS-2023-STREAM-B-01-03(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-05(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-01(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-D-01-01(HORIZON-JU-IA), HORIZON-JU-SNS-2023-STREAM-B-01-02(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-04(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-B-01-06(HORIZON-JU-RIA), HORIZON-JU-SNS-2023-STREAM-CSA-01(HORIZON-JU-CSA), HORIZON-JU-SNS-2023-STREAM-C-01-01(HORIZON-JU-RIA)
call topic details
Call status: Closed
Opening date: 2023-01-17 (3 years ago)
Closing date: 2023-04-25 (3 years ago)
Procedure: single-stage

Budget: 24,000,000
Expected grants: 6
Contribution: 4,000,000 - 4,000,000
News flashes

This call topic has been appended 12 times by the EC with news.

  • 2023-07-31
    evaluation results (corrigendum):publish...
  • 2023-07-31
    evaluation results published: 15/12/2022...
  • 2023-07-31
    evaluation results (corrigendum):publish...
  • 2023-07-31
    evaluation results published: 15/12/2022...
  • 2023-04-26
    proposal numberscall horizon-ju-sns-2023...
  • 2023-04-26
    proposal numberscall horizon-ju-sns-2023...
  • 2023-03-21
    following thecouncil implementing decisi...
  • 2023-03-21
    following thecouncil implementing decisi...
  • 2023-01-17
    please note that the funding rates in th...
  • 2023-01-17
    the submission session is now available...
  • 2023-01-17
    please note that the funding rates in th...
  • 2023-01-17
    the submission session is now available...
Call

HORIZON-JU-SNS-2023

Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.

There are 8 other topics in this call:

Source information

Showing the latest information. Found 3 versions of this call topic in the F&T portal.

Information from

  • 2024-11-04_17-25-37
  • 2024-09-30_21-22-24
  • 2024-03-30_14-17-56

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

14 Oct 2022 · est.

Call opens

17 Jan 2023

Call closes

25 Apr 2023

Outcome expected

25 Sep 2023 · est.

Grant agreement signed

25 Dec 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    14 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    17 Jan 2023 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    25 Apr 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    25 Sep 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    25 Dec 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal