View on F&T portalProjects are expected to contribute to all of the following outcomes:
- Beyond state of the art asset-level models for critical infrastructures will allow for a better assessment of adaptation options
- Public authorities will be enabled to compare different adaptation approaches on the basis of a model information system on critical infrastructure
- An analysis of gaps in European data regarding the assessment of direct[1] and indirect[2] economic consequences of damages to critical infrastructures.
This topic relates to the Mission’s first objective: preparing and planning for climate resilience and the need for a better understanding of climate change related risks.
To fully comprehend climate change related risks, information on assets is necessary. Asset-level modelling requires combining meteorological/hydrological hazard models with information on assets (their location and ideally their construction costs and quality, as well as historical loss data). Assets can be publicly or privately owned infrastructure, including critical infrastructure, as well as natural and land areas or housing areas. This topic addresses the provision of asset-level information to public authorities, on critical infrastructures.
The proposal should consider the effect of multiple hazards (including complex, cascading and compound disasters) and should develop improved assessment models, including improved model coupling. For instance, coupling hazard, exposure and vulnerability, stemming from sources such as Copernicus and its Copernicus Climate Change Service (C3S)[3], with assessments of impacts and of potential adaptation measures, thereby completely integrating the causal chain from climate stressors to adaptive responses into one unifying modelling framework.
The proposal should consider several critical infrastructures (for example electricity supply, ICT, transport systems) across several regions and how its functioning might be impeded by climate change induced risks. The models developed should include reconstruction costs, the costs of not providing the intended service as well as knock-on effects on other systems. The model should be designed as a decision support tool for public authorities allowing them to assess costs of various adaptation solutions across several regions.
The proposal must demonstrate that it goes beyond state of the art and should identify data gaps and discuss approaches to overcome the data gaps in the future. In particular, the proposal should look at
a) resolution and completeness of data for exposure assessments
b) data on construction costs, construction quality and characteristics (notably protection against extreme weather events) as well as on planned redundancies.
c) data on the use of the infrastructures (for example how many trains, cars or households are served)
The proposals should give due regard to the Commission technical guidance[4] on the climate proofing of infrastructure in the period 2021-2027, notably as regards climate resilience, the climate vulnerability and risk assessment, as well as the identification, economic and technical appraisal, and implementation of relevant adaptation measures.
[1] Costs for re-construction of the damaged asset
[2] Consequences on other systems if a critical infrastructure is not functioning
[3] see https://climate.copernicus.eu/climate-data-sustainable-infrastructure
[4] Commission Notice C(2021) 5430 final of 29.7.2021: https://ec.europa.eu/clima/sites/default/files/adaptation/what/docs/climate_proofing_guidance_en.pdf and https://ec.europa.eu/commission/presscorner/detail/en/IP_21_3943
News flashes
Correction to update of Apr 14, 2022:
Call HORIZON-MISS-2021-CLIMA-02 has closed on 12/04/2022.
29 proposals have been submitted.
The breakdown per topic is:
- HORIZON-MISS-2021-CLIMA-02-01: 2 proposals
- HORIZON-MISS-2021-CLIMA-02-02: 4 proposals
- HORIZON-MISS-2021-CLIMA-02-03: 8 proposals
- HORIZON-MISS-2021-CLIMA-02-04: 3 proposals
- HORIZON-MISS-2021-CLIMA-02-05: 12 proposals
Evaluation results are expected to be communicated in July 2022.
Correction to update of Apr 14, 2022:
Call HORIZON-MISS-2021-CLIMA-02 has closed on 12/04/2022.
29 proposals have been submitted.
The breakdown per topic is:
- HORIZON-MISS-2021-CLIMA-02-01: 2 proposals
- HORIZON-MISS-2021-CLIMA-02-02: 4 proposals
- HORIZON-MISS-2021-CLIMA-02-03: 8 proposals
- HORIZON-MISS-2021-CLIMA-02-04: 3 proposals
- HORIZON-MISS-2021-CLIMA-02-05: 12 proposals
Evaluation results are expected to be communicated in July 2022.
Call HORIZON-MISS-2021-CLIMA-02 has closed on 12/04/2022.
29 proposals have been submitted.
The breakdown per topic is:
- HORIZON-MISS-2021-CLIMA-02-01: 2 proposals
- HORIZON-MISS-2021-CLIMA-02-02: 4 proposals
- HORIZON-MISS-2021-CLIMA-02-03: 8 proposals
- HORIZON-MISS-2021-CLIMA-02-01: 3 proposals
- HORIZON-MISS-2021-CLIMA-02-01: 12 proposals
Evaluation results are expected to be communicated in July 2022.
Call HORIZON-MISS-2021-CLIMA-02 has closed on 12/04/2022.
29 proposals have been submitted.
The breakdown per topic is:
- HORIZON-MISS-2021-CLIMA-02-01: 2 proposals
- HORIZON-MISS-2021-CLIMA-02-02: 4 proposals
- HORIZON-MISS-2021-CLIMA-02-03: 8 proposals
- HORIZON-MISS-2021-CLIMA-02-01: 3 proposals
- HORIZON-MISS-2021-CLIMA-02-01: 12 proposals
Evaluation results are expected to be communicated in July 2022.
Opening date: 2022-01-11 (4 years ago)
Closing date: 2022-04-12 (4 years ago)
Procedure: single-stage
Budget: 0
Expected grants: not specified
This call topic has been appended 6 times by the EC with news.
-
2022-04-15
correction to update of apr 14, 2022:cal... -
2022-04-15
correction to update of apr 14, 2022:cal... -
2022-04-14
call horizon-miss-2021-clima-02 has clos... -
2022-04-14
call horizon-miss-2021-clima-02 has clos... -
2022-01-11
the submission session is now available... -
2022-01-11
the submission session is now available...
HORIZON-MISS-2021-CLIMA-02
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 4 other topics in this call:
Showing the latest information. Found 2 versions of this call topic in the F&T portal.
Information from
- 2024-09-30_21-21-46
- 2024-03-30_14-18-04
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Call opens
11 Jan 2022
Work programme published
10 Mar 2022 · est.
Call closes
12 Apr 2022
Outcome expected
12 Sep 2022 · est.
Grant agreement signed
12 Dec 2022 · est.
Call published
30 Sep 2024
-
Call opens
11 Jan 2022 · 4 years ago
Submissions can be made from this date.
-
Work programme published Estimated
10 Mar 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call closes
12 Apr 2022 · 4 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
12 Sep 2022 · 4 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
12 Dec 2022 · 3 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.