HORIZON-CL4-2022-TWIN-TRANSITION-01-16
Modular and hybrid heating technologies in steel production (Clean Steel Partnership) (IA) -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalExpected Outcome
Projects are expected to contribute to the following outcomes:
- Use a wide control range of heating capacity by modular heating technologies such local regenerators, and of hybrid heating, based on both fuel gases from the steel-making process and the incorporation of electricity from renewable sources;
- Integration of fuel cells, electrolysers or alternative carbon-based products for non-fossil coke, as well as increased use of non-fossil energy and reactants (e.g. green electricity for heat generation, biomass, green hydrogen) in downstream processes. .
- Integrate fuel cells of alternative coal-based products for non-fossil coke, as well as increased use of non-fossil energy and reactants (e.g. green electricity for heat generation, biomass, green hydrogen) in downstream processes.
Scope
Steel plant gases are partly used internally as heating gases and partly used externally, in nearby power plants, to produce electricity at high cost and high CO2 load.
These gases could be used in reduction processes (blast furnace or even direct reduction) to reduce fossil carbon use, provided they are well prepared for injection in these processes. This notably includes cleaning, compression, heating and removal of oxidised compounds such as CO2 and H2O, e.g. through scrubbing or reforming operations. To make a real difference on CO2 emissions, all these preparation steps need to be performed using internal resources (by-products, heat) or external but low-C energy sources (e.g. electricity, using plasma torches).
The concepts to be developed under this topic are expected to address one or more of the following areas:
- Development of a flexible, modular technology that can easily be scaled up for the stepwise integration of heating technologies in Blast furnaces, Electric Arc Furnaces and Direct Reduction Processes;
- Technologies that target the integration of new materials and gases workflows in existing steelworks, combining exhaust gases from the reduction processes and heat generated in downstream processes to reduce the external requirements of energy.
Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.
This topic implements the co-programmed European Partnership on Clean Steel.
In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement
Specific Topic Conditions:Activities are expected to start at TRL 5 and achieve TRL 7 by the end of the project – see General Annex B.
Cross-cutting Priorities:Artificial IntelligenceCo-programmed European PartnershipsDigital Agenda
News flashes
Call for proposals: HORIZON-CL4-2022-TWIN-TRANSITION-01
Single-stage topics
Deadline: 30 March 2022
Available budget: EUR 334,500,000.00
Topic code
Type(s) of action
Budget
HORIZON-CL4-2022-TWIN-TRANSITION-01-01
IA
27.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-02
RIA
21.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-03
RIA
21.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-04
RIA
21.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-06
IA
30.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-07
RIA
22.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-09
IA
9.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-10
IA
42.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-11
IA
42.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-13
IA
14.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-15
RIA
30.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-16
IA
10.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-17
IA
42.50
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 249
Number of inadmissible proposals: 0
Number of ineligible proposals: 8
Number of above-threshold proposals: 155
Total budget requested for above-threshold proposals: EUR 1,084,354,325.00
We recently informed the applicants about the evaluation results for their proposals.
It is expected that the first grant agreements will be signed by November 2022.
Information on the selected projects will be published on CORDIS[1] after that date.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
For questions, please contact the Research Enquiry Service[2].
[1] Available at http://cordis.europa.eu/projects/home_en.html
[2] Available at http://ec.europa.eu/research/enquiries
Deadline HORIZON-CL4-2022-TWIN-TRANSITION-01: 30.03.2022
A total of 252 proposals were submitted in response to this call.The number of proposals for each topic is shown below:
HORIZON-CL4-2022-TWIN-TRANSITION-01-01 : 17
HORIZON-CL4-2022-TWIN-TRANSITION-01-02 : 42
HORIZON-CL4-2022-TWIN-TRANSITION-01-03 : 19
HORIZON-CL4-2022-TWIN-TRANSITION-01-04 : 23
HORIZON-CL4-2022-TWIN-TRANSITION-01-06 : 18
HORIZON-CL4-2022-TWIN-TRANSITION-01-07 : 48
HORIZON-CL4-2022-TWIN-TRANSITION-01-09 : 22
HORIZON-CL4-2022-TWIN-TRANSITION-01-10 : 16
HORIZON-CL4-2022-TWIN-TRANSITION-01-11 : 10
HORIZON-CL4-2022-TWIN-TRANSITION-01-13 : 3
HORIZON-CL4-2022-TWIN-TRANSITION-01-15 : 15
HORIZON-CL4-2022-TWIN-TRANSITION-01-16 : 4
HORIZON-CL4-2022-TWIN-TRANSITION-01-17 : 15
Please note that the 'Other annexes' box has been added in the submission system to allow the upload of an Annex with the description of the use of financial support to third parties. The description of the content of this annex is described in the Part B of the Application Form.
This annex should only be uploaded for topic:
HORIZON-CL4-2022-TWIN-TRANSITION-01-06 - ICT Innovation for Manufacturing Sustainability in SMEs (I4MS2) (Made in Europe Partnership) (IA)
Please do not use it for any other topic, the information will be disregarded.
Publication date: 2021-06-16 (4 years ago)
Opening date: 2021-10-12 (3 years ago)
Closing date: 2022-03-30 (3 years ago)
Procedure: single-stage
Budget: 10000000
Expected grants: not specified
This call topic has been appended 4 times by the EC with news.
-
2022-08-03
call for proposals: horizon-cl4-2022-twi... -
2022-04-05
deadline horizon-cl4-2022-twin-transitio... -
2022-03-03
please note that the 'other annexes' box... -
2021-10-12
the submission session is now available...
HORIZON-CL4-2022-TWIN-TRANSITION-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 12 other topics in this call:
- HORIZON-CL4-2022-TWIN-TRANSITION-01-01
- HORIZON-CL4-2022-TWIN-TRANSITION-01-02
- HORIZON-CL4-2022-TWIN-TRANSITION-01-03
- HORIZON-CL4-2022-TWIN-TRANSITION-01-04
- HORIZON-CL4-2022-TWIN-TRANSITION-01-06
- HORIZON-CL4-2022-TWIN-TRANSITION-01-07
- HORIZON-CL4-2022-TWIN-TRANSITION-01-09
- HORIZON-CL4-2022-TWIN-TRANSITION-01-10
- HORIZON-CL4-2022-TWIN-TRANSITION-01-11
- HORIZON-CL4-2022-TWIN-TRANSITION-01-13
- HORIZON-CL4-2022-TWIN-TRANSITION-01-15
- HORIZON-CL4-2022-TWIN-TRANSITION-01-17
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-30_14-17-41
Annotations (will be publicly visible when approved)
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 4 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Publication date
- 4 years agoThe call was published on the Funding & Tenders Portal.
-
Opening date
- 3 years agoThe call opened for submissions.
-
Closing date
- 3 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 2 years agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 2 years agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)