Closed HORIZON-CL4-2022-TWIN-TRANSITION-01-03 HORIZON

Excellence in distributed control and modular manufacturing (Made in Europe Partnership) (RIA)

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Projects are expected to contribute to the following outcomes:

  • Significant advance in modular technologies for flexible manufacturing operations, which respond to disrupted supply chains, or rapid changes in customer and societal demands;
  • Transition of modular technology to sustainable production for varying batch sizes, including single lots, with a clear integration of control and decision-making strategies at different levels and throughout the supply chain;
  • Improved understanding among industrial users, including SMEs, of how to organise and control reconfigurable manufacturing systems built from modules with defined interfaces, including quality assessments, environmental impact, energy use, end-user involvement and business models.

Scope:

Modularity of a production system is crucial for flexibility and to allow for varying the production according to needs and circumstances by introducing, changing, and removing different process steps. While the concept of modularity is not new, there is still a vast range of production steps that cannot be considered modular, and the ones that can be considered as such are not necessarily suitable for current demands nor to be considered as a part of sustainable production regimes.

The projects under this topic need to address the following aspects:

  • Propose and develop new production modules that cover processes that are not currently readily available on the market and go beyond the current state of the art with a clear alignment of customer and workers’ needs including taking into consideration biases and gender dimension;
  • Create interfaces based on open-source protocols that allow for easily integration of modules in existing lines and with other modules or production elements;
  • Create industrial strategies on how to use modularity, including its related service models, to reduce energy consumption and environmental footprint, and demonstrate these in a relevant environment;
  • Develop business models that demonstrate the potential of the modular technologies to be transferred from one specific manufacturing sector to several others;
  • Support training and knowledge transfer to relevant parts of the workforce.

Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.

Research must build on existing standards or contribute to standardisation. Interoperability for data sharing should be addressed. Additionally, a strategy for skills development should be presented, associating social partners when relevant.

All projects should build on or seek collaboration with existing projects and develop synergies with other relevant European, national or regional initiatives, funding programmes and platforms.

This topic implements the co-programmed European Partnership Made in Europe.

null

Activities are expected to start at TRL 4 and achieve TRL 6 by the end of the project – see General Annex B.

News flashes

2022-08-03

Call for proposals: HORIZON-CL4-2022-TWIN-TRANSITION-01

                                 Single-stage topics

 Deadline: 30 March 2022

 Available budget: EUR 334,500,000.00

 

Topic code

Type(s) of action

Budget

HORIZON-CL4-2022-TWIN-TRANSITION-01-01

IA

27.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-02

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-03

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-04

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-06

IA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-07

RIA

22.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-09

IA

9.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-10

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-11

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-13

IA

14.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-15

RIA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-16

IA

10.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-17

IA

42.50

 

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

 

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 249

Number of inadmissible proposals: 0

Number of ineligible proposals: 8

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,084,354,325.00

 

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by November 2022.

 

Information on the selected projects will be published on CORDIS[1] after that date.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

      For questions, please contact the Research Enquiry Service[2].

 

[1]      Available at http://cordis.europa.eu/projects/home_en.html

[2]      Available at http://ec.europa.eu/research/enquiries

 

 

 
2022-08-03

Call for proposals: HORIZON-CL4-2022-TWIN-TRANSITION-01

                                 Single-stage topics

 Deadline: 30 March 2022

 Available budget: EUR 334,500,000.00

 

Topic code

Type(s) of action

Budget

HORIZON-CL4-2022-TWIN-TRANSITION-01-01

IA

27.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-02

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-03

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-04

RIA

21.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-06

IA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-07

RIA

22.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-09

IA

9.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-10

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-11

IA

42.50

HORIZON-CL4-2022-TWIN-TRANSITION-01-13

IA

14.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-15

RIA

30.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-16

IA

10.00

HORIZON-CL4-2022-TWIN-TRANSITION-01-17

IA

42.50

 

The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.

 

The results of the evaluation are as follows:

Number of proposals submitted (including proposals transferred from or to other calls): 249

Number of inadmissible proposals: 0

Number of ineligible proposals: 8

Number of above-threshold proposals: 155

Total budget requested for above-threshold proposals: EUR 1,084,354,325.00

 

We recently informed the applicants about the evaluation results for their proposals.

It is expected that the first grant agreements will be signed by November 2022.

 

Information on the selected projects will be published on CORDIS[1] after that date.

Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.

      For questions, please contact the Research Enquiry Service[2].

 

[1]      Available at http://cordis.europa.eu/projects/home_en.html

[2]      Available at http://ec.europa.eu/research/enquiries

 

 

 
2022-04-05

Deadline HORIZON-CL4-2022-TWIN-TRANSITION-01: 30.03.2022

A total of 252 proposals were submitted in response to this call.The number of proposals for each topic is shown below:

HORIZON-CL4-2022-TWIN-TRANSITION-01-01 : 17

HORIZON-CL4-2022-TWIN-TRANSITION-01-02 : 42

HORIZON-CL4-2022-TWIN-TRANSITION-01-03 : 19

HORIZON-CL4-2022-TWIN-TRANSITION-01-04 : 23

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 : 18

HORIZON-CL4-2022-TWIN-TRANSITION-01-07 : 48

HORIZON-CL4-2022-TWIN-TRANSITION-01-09 : 22

HORIZON-CL4-2022-TWIN-TRANSITION-01-10 : 16

HORIZON-CL4-2022-TWIN-TRANSITION-01-11 : 10

HORIZON-CL4-2022-TWIN-TRANSITION-01-13 : 3

HORIZON-CL4-2022-TWIN-TRANSITION-01-15 : 15

HORIZON-CL4-2022-TWIN-TRANSITION-01-16 : 4

HORIZON-CL4-2022-TWIN-TRANSITION-01-17 : 15

2022-04-05

Deadline HORIZON-CL4-2022-TWIN-TRANSITION-01: 30.03.2022

A total of 252 proposals were submitted in response to this call.The number of proposals for each topic is shown below:

HORIZON-CL4-2022-TWIN-TRANSITION-01-01 : 17

HORIZON-CL4-2022-TWIN-TRANSITION-01-02 : 42

HORIZON-CL4-2022-TWIN-TRANSITION-01-03 : 19

HORIZON-CL4-2022-TWIN-TRANSITION-01-04 : 23

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 : 18

HORIZON-CL4-2022-TWIN-TRANSITION-01-07 : 48

HORIZON-CL4-2022-TWIN-TRANSITION-01-09 : 22

HORIZON-CL4-2022-TWIN-TRANSITION-01-10 : 16

HORIZON-CL4-2022-TWIN-TRANSITION-01-11 : 10

HORIZON-CL4-2022-TWIN-TRANSITION-01-13 : 3

HORIZON-CL4-2022-TWIN-TRANSITION-01-15 : 15

HORIZON-CL4-2022-TWIN-TRANSITION-01-16 : 4

HORIZON-CL4-2022-TWIN-TRANSITION-01-17 : 15

2022-03-03

Please note that the 'Other annexes' box has been added in the submission system to allow the upload of an Annex with the description of the use of financial support to third parties. The description of the content of this annex is described in the Part B of the Application Form.

This annex should only be uploaded for topic:

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 - ICT Innovation for Manufacturing Sustainability in SMEs (I4MS2) (Made in Europe Partnership) (IA)

Please do not use it for any other topic, the information will be disregarded.

2022-03-03

Please note that the 'Other annexes' box has been added in the submission system to allow the upload of an Annex with the description of the use of financial support to third parties. The description of the content of this annex is described in the Part B of the Application Form.

This annex should only be uploaded for topic:

HORIZON-CL4-2022-TWIN-TRANSITION-01-06 - ICT Innovation for Manufacturing Sustainability in SMEs (I4MS2) (Made in Europe Partnership) (IA)

Please do not use it for any other topic, the information will be disregarded.

2021-10-12
The submission session is now available for: HORIZON-CL4-2022-TWIN-TRANSITION-01-04(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-15(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-10(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-01(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-11(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-17(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-06(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-09(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-16(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-13(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-03(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-02(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-07(HORIZON-RIA)
2021-10-12
The submission session is now available for: HORIZON-CL4-2022-TWIN-TRANSITION-01-04(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-15(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-10(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-01(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-11(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-17(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-06(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-09(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-16(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-13(HORIZON-IA), HORIZON-CL4-2022-TWIN-TRANSITION-01-03(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-02(HORIZON-RIA), HORIZON-CL4-2022-TWIN-TRANSITION-01-07(HORIZON-RIA)
call topic details
Call status: Closed
Opening date: 2021-10-12 (5 years ago)
Closing date: 2022-03-30 (4 years ago)
Procedure: single-stage

Budget: 21,500,000
Expected grants: 4
Contribution: 4,000,000 - 6,000,000
News flashes

This call topic has been appended 8 times by the EC with news.

  • 2022-08-03
    call for proposals: horizon-cl4-2022-twi...
  • 2022-08-03
    call for proposals: horizon-cl4-2022-twi...
  • 2022-04-05
    deadline horizon-cl4-2022-twin-transitio...
  • 2022-04-05
    deadline horizon-cl4-2022-twin-transitio...
  • 2022-03-03
    please note that the 'other annexes' box...
  • 2022-03-03
    please note that the 'other annexes' box...
  • 2021-10-12
    the submission session is now available...
  • 2021-10-12
    the submission session is now available...
Source information

Showing the latest information. Found 191 versions of this call topic in the F&T portal.

Information from

  • 2026-10-15_06-31-23
  • 2026-10-15_06-30-50
  • 2026-10-14_06-25-48
  • 2026-10-14_06-24-05
  • 2026-10-13_06-29-24
  • 2026-10-13_06-27-45
  • 2026-10-12_09-24-47
  • 2026-10-12_09-24-14
  • 2026-10-11_09-23-37
  • 2026-10-11_09-22-56
  • 2026-10-10_09-26-02
  • 2026-10-10_09-25-24
  • 2026-10-09_09-22-13
  • 2026-10-09_09-21-39
  • 2026-10-08_09-26-09
  • 2026-10-08_09-25-30
  • 2026-10-07_09-22-07
  • 2026-10-07_09-20-24
  • 2026-10-06_09-24-36
  • 2026-10-06_09-22-42
  • 2026-10-05_09-20-38
  • 2026-10-05_09-18-43
  • 2026-10-04_09-20-14
  • 2026-10-04_09-18-17
  • 2026-10-03_09-21-02
  • 2026-10-03_09-18-59
  • 2026-10-02_09-21-15
  • 2026-10-02_09-19-11
  • 2026-10-01_09-24-52
  • 2026-10-01_09-22-41
  • 2026-09-29_10-09-09
  • 2026-09-29_10-06-34
  • 2026-09-28_10-09-30
  • 2026-09-28_10-06-43
  • 2026-09-27_10-07-23
  • 2026-09-27_10-04-53
  • 2026-09-26_10-03-52
  • 2026-09-26_10-01-21
  • 2026-09-25_10-03-36
  • 2026-09-25_10-00-58
  • 2026-09-24_10-09-14
  • 2026-09-24_10-06-48
  • 2026-09-23_10-02-34
  • 2026-09-23_10-00-06
  • 2026-09-22_10-03-18
  • 2026-09-22_10-00-48
  • 2026-09-21_09-56-55
  • 2026-09-21_09-54-21
  • 2026-09-20_09-57-45
  • 2026-09-20_09-55-17
  • 2026-09-19_09-53-34
  • 2026-09-19_09-51-03
  • 2026-09-18_10-00-11
  • 2026-09-18_09-57-46
  • 2026-09-17_09-55-12
  • 2026-09-17_09-52-48
  • 2026-09-16_09-51-57
  • 2026-09-16_09-49-27
  • 2026-09-15_09-54-49
  • 2026-09-15_09-52-10
  • 2026-09-14_09-53-15
  • 2026-09-14_09-50-47
  • 2026-09-13_09-51-20
  • 2026-09-13_09-48-52
  • 2026-09-12_09-54-21
  • 2026-09-12_09-51-52
  • 2026-09-11_09-57-21
  • 2026-09-11_09-54-55
  • 2026-09-10_09-53-32
  • 2026-09-10_09-51-18
  • 2026-09-09_09-57-51
  • 2026-09-09_09-55-20
  • 2026-09-08_09-53-27
  • 2026-09-08_09-51-00
  • 2026-09-07_09-52-25
  • 2026-09-07_09-49-58
  • 2026-09-06_09-48-06
  • 2026-09-06_09-45-43
  • 2026-09-05_09-46-31
  • 2026-09-05_09-43-55
  • 2026-09-04_09-45-45
  • 2026-09-04_09-43-07
  • 2026-09-03_09-44-32
  • 2026-09-03_09-42-25
  • 2026-09-02_09-46-04
  • 2026-09-02_09-43-46
  • 2026-09-01_09-44-12
  • 2026-09-01_09-41-45
  • 2026-08-30_09-40-04
  • 2026-08-30_09-38-07
  • 2026-08-29_09-42-11
  • 2026-08-29_09-39-44
  • 2026-08-28_09-44-18
  • 2026-08-28_09-42-07
  • 2026-08-25_09-38-21
  • 2026-08-25_09-36-10
  • 2026-08-24_09-33-20
  • 2026-08-24_09-31-16
  • 2026-08-23_09-31-17
  • 2026-08-23_09-29-07
  • 2026-08-21_09-25-14
  • 2026-08-21_09-23-02
  • 2026-08-20_09-30-52
  • 2026-08-20_09-28-58
  • 2026-08-19_09-31-47
  • 2026-08-19_09-29-39
  • 2026-08-18_09-25-23
  • 2026-08-18_09-23-18
  • 2026-08-16_09-18-47
  • 2026-08-16_09-16-49
  • 2026-08-15_09-34-18
  • 2026-08-15_09-32-16
  • 2026-08-14_09-25-37
  • 2026-08-14_09-23-14
  • 2026-08-13_09-19-30
  • 2026-08-13_09-17-16
  • 2026-08-12_09-19-08
  • 2026-08-12_09-16-49
  • 2026-08-11_09-19-16
  • 2026-08-11_09-17-27
  • 2026-08-09_09-15-36
  • 2026-08-09_09-13-41
  • 2026-08-08_09-14-47
  • 2026-08-08_09-12-54
  • 2026-08-07_09-12-47
  • 2026-08-07_09-10-50
  • 2026-08-06_09-15-23
  • 2026-08-06_09-13-34
  • 2026-08-05_09-15-30
  • 2026-08-05_09-13-42
  • 2026-08-04_09-15-15
  • 2026-08-04_09-13-09
  • 2026-08-02_09-09-52
  • 2026-08-02_09-07-52
  • 2026-08-01_09-10-40
  • 2026-08-01_09-08-46
  • 2026-07-31_09-11-29
  • 2026-07-31_09-09-38
  • 2026-07-30_09-08-57
  • 2026-07-30_09-07-06
  • 2026-07-29_09-11-07
  • 2026-07-29_09-09-01
  • 2026-07-27_09-03-10
  • 2026-07-27_09-01-24
  • 2026-07-26_08-59-00
  • 2026-07-26_08-57-19
  • 2026-07-25_09-00-29
  • 2026-07-25_08-58-25
  • 2026-07-23_09-00-34
  • 2026-07-23_08-58-27
  • 2026-07-22_09-03-04
  • 2026-07-22_09-01-16
  • 2026-07-20_09-01-44
  • 2026-07-20_08-59-42
  • 2026-07-18_08-59-19
  • 2026-07-18_08-57-36
  • 2026-07-17_08-58-09
  • 2026-07-17_08-56-17
  • 2026-07-16_08-31-39
  • 2026-07-16_08-29-51
  • 2026-07-15_08-33-05
  • 2026-07-15_08-31-43
  • 2026-07-13_08-31-39
  • 2026-07-13_08-29-56
  • 2026-07-10_08-27-39
  • 2026-07-10_08-26-04
  • 2026-07-08_08-28-37
  • 2026-07-08_08-26-58
  • 2026-07-06_08-27-32
  • 2026-07-06_08-26-10
  • 2026-07-05_08-22-57
  • 2026-07-05_08-21-08
  • 2026-07-04_08-22-18
  • 2026-07-04_08-20-28
  • 2026-07-03_08-24-25
  • 2026-07-03_08-22-24
  • 2026-07-02_08-22-49
  • 2026-07-02_08-21-13
  • 2026-07-01_09-14-47
  • 2026-07-01_09-13-58
  • 2026-06-30_09-50-56
  • 2026-06-30_09-11-42
  • 2026-06-29_11-35-48
  • 2026-06-29_09-13-57
  • 2026-06-28_09-32-59
  • 2026-06-28_09-01-54
  • 2026-06-27_09-33-42
  • 2026-06-27_09-02-09
  • 2026-06-27_09-01-38
  • 2026-02-18_07-21-32
  • 2024-03-30_14-18-04

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

16 Apr 2021 · est.

Call opens

12 Oct 2021

Call closes

30 Mar 2022

Outcome expected

30 Aug 2022 · est.

Grant agreement signed

30 Nov 2022 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    16 Apr 2021 · 5 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    12 Oct 2021 · 5 years ago

    Submissions can be made from this date.

  3. Call closes

    30 Mar 2022 · 4 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    30 Aug 2022 · 4 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    30 Nov 2022 · 3 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal