HORIZON-CL4-2022-TWIN-TRANSITION-01-11
Valorisation of CO/CO2 streams into added-value products of market interest (Processes4Planet Partnership) (IA) -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalExpected Outcome
Projects are expected to contribute to the following outcomes:
- Utilise CO/CO2 streams to produce added value products and/or intermediates of wide industrial interest (e.g. polymers, resins, chemicals, food/feed ingredients, minerals, etc.). Excluding fuels and/or energy carriers;
- Enhance the market for CO/CO2 based products providing economically viable and sustainable alternatives to existing products with strong market interest in one or more applications (e.g. consumer products, feed/food ingredients, automotive, construction, etc.);
- Develop concepts enabling 100% utilisation of RES (e.g. electrified processes, concentrated solar, etc.), coping with potential fluctuations in the energy supply;
- Achieve at least 60% GHG emissions mitigation in the overall lifecycle compared to existing processes for the same products (or relevant benchmark);
- Develop mature technologies for separation/purification of CO/CO2 containing waste streams to allow the integration in the targeted industry sector/sectors.
Relevant indicators and metrics, with baseline values, should be clearly stated in the proposal.
Scope
The proposals submitted under this topic are expected to provide concepts for utilisation of CO/CO2 streams from point sources (e.g. large industrial installations such as steel, cement and chemical plants) converting them into added value products and/or intermediates and chemicals of wide interest (plastics, resins, composites, chemicals). The topic excludes explicitly fuels and renewable energy storage concepts. The technologies proposed should support cross-sectorial concepts and sector integration paradigms. They should also be able to work efficiently in a renewable based energy system, coping with potential fluctuations in the energy supply or be fully self-sustained from an energy standpoint. The concepts proposed are expected to:
- Process significant amounts CO/CO2 containing waste streams from energy intensive industries, including efficient approaches for the pre-treatment of the gaseous stream (e.g. cleaning, compression, drying, concentration, etc.) if needed;
- Target a range of products and/or intermediates with a wide variety of applications in different sectors (e.g. construction, automotive, food/feed, etc.) to replace existing ones (e.g. fossil based or from virgin raw materials);
- Consider clearly industrial specifications and relevant market requirements;
- Demonstrate that targeted products and/or intermediates can fully replace existing counterparts. The prevention of upcycling of hazardous substances, including their separation and disposal should be considered;
- Demonstrate the improved environmental footprint of the proposed products and processes, as well as other positive impacts using relevant methodologies (e.g. LCA, LCSA, etc.);
- Provide elements related to the replicability and scalability of the technology, along with the potential for applicability in other Energy intensive industry sectors;
- Demonstrate the proposed concepts in an industrially relevant environment and at an appropriate scale. The integration of the proposed technology in existing value chains and the relevance to several European contexts would be an added value;
- Proposals should consider the co-design of learning resources together with local and regional educational organisations for current and future generations of employees, with the possibility of integrating them in existing curricula and modules for undergraduate level and lifelong learning programmes. Learning resources should integrate the identification of new skills and should propose innovative learning-teaching methods that meet regional social needs and have a high potential for replication.
Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination.
This topic implements the co-programmed European partnership Processes4Planet.
Specific Topic Conditions:Activities are expected to start at TRL 5 and achieve TRL 7 by the end of the project – see General Annex B.
Cross-cutting Priorities:Co-programmed European PartnershipsArtificial IntelligenceDigital Agenda
News flashes
Call for proposals: HORIZON-CL4-2022-TWIN-TRANSITION-01
Single-stage topics
Deadline: 30 March 2022
Available budget: EUR 334,500,000.00
Topic code
Type(s) of action
Budget
HORIZON-CL4-2022-TWIN-TRANSITION-01-01
IA
27.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-02
RIA
21.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-03
RIA
21.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-04
RIA
21.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-06
IA
30.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-07
RIA
22.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-09
IA
9.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-10
IA
42.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-11
IA
42.50
HORIZON-CL4-2022-TWIN-TRANSITION-01-13
IA
14.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-15
RIA
30.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-16
IA
10.00
HORIZON-CL4-2022-TWIN-TRANSITION-01-17
IA
42.50
The Commission has now completed the evaluation of the proposals submitted to the above-mentioned call.
The results of the evaluation are as follows:
Number of proposals submitted (including proposals transferred from or to other calls): 249
Number of inadmissible proposals: 0
Number of ineligible proposals: 8
Number of above-threshold proposals: 155
Total budget requested for above-threshold proposals: EUR 1,084,354,325.00
We recently informed the applicants about the evaluation results for their proposals.
It is expected that the first grant agreements will be signed by November 2022.
Information on the selected projects will be published on CORDIS[1] after that date.
Please note that the number of proposals that can finally be funded will depend on the finally available budget and the formal selection by the Commission.
For questions, please contact the Research Enquiry Service[2].
[1] Available at http://cordis.europa.eu/projects/home_en.html
[2] Available at http://ec.europa.eu/research/enquiries
Deadline HORIZON-CL4-2022-TWIN-TRANSITION-01: 30.03.2022
A total of 252 proposals were submitted in response to this call.The number of proposals for each topic is shown below:
HORIZON-CL4-2022-TWIN-TRANSITION-01-01 : 17
HORIZON-CL4-2022-TWIN-TRANSITION-01-02 : 42
HORIZON-CL4-2022-TWIN-TRANSITION-01-03 : 19
HORIZON-CL4-2022-TWIN-TRANSITION-01-04 : 23
HORIZON-CL4-2022-TWIN-TRANSITION-01-06 : 18
HORIZON-CL4-2022-TWIN-TRANSITION-01-07 : 48
HORIZON-CL4-2022-TWIN-TRANSITION-01-09 : 22
HORIZON-CL4-2022-TWIN-TRANSITION-01-10 : 16
HORIZON-CL4-2022-TWIN-TRANSITION-01-11 : 10
HORIZON-CL4-2022-TWIN-TRANSITION-01-13 : 3
HORIZON-CL4-2022-TWIN-TRANSITION-01-15 : 15
HORIZON-CL4-2022-TWIN-TRANSITION-01-16 : 4
HORIZON-CL4-2022-TWIN-TRANSITION-01-17 : 15
Please note that the 'Other annexes' box has been added in the submission system to allow the upload of an Annex with the description of the use of financial support to third parties. The description of the content of this annex is described in the Part B of the Application Form.
This annex should only be uploaded for topic:
HORIZON-CL4-2022-TWIN-TRANSITION-01-06 - ICT Innovation for Manufacturing Sustainability in SMEs (I4MS2) (Made in Europe Partnership) (IA)
Please do not use it for any other topic, the information will be disregarded.
Publication date: 2021-06-16 (4 years ago)
Opening date: 2021-10-12 (3 years ago)
Closing date: 2022-03-30 (3 years ago)
Procedure: single-stage
Budget: 42500000
Expected grants: not specified
This call topic has been appended 4 times by the EC with news.
-
2022-08-03
call for proposals: horizon-cl4-2022-twi... -
2022-04-05
deadline horizon-cl4-2022-twin-transitio... -
2022-03-03
please note that the 'other annexes' box... -
2021-10-12
the submission session is now available...
HORIZON-CL4-2022-TWIN-TRANSITION-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 12 other topics in this call:
- HORIZON-CL4-2022-TWIN-TRANSITION-01-01
- HORIZON-CL4-2022-TWIN-TRANSITION-01-02
- HORIZON-CL4-2022-TWIN-TRANSITION-01-03
- HORIZON-CL4-2022-TWIN-TRANSITION-01-04
- HORIZON-CL4-2022-TWIN-TRANSITION-01-06
- HORIZON-CL4-2022-TWIN-TRANSITION-01-07
- HORIZON-CL4-2022-TWIN-TRANSITION-01-09
- HORIZON-CL4-2022-TWIN-TRANSITION-01-10
- HORIZON-CL4-2022-TWIN-TRANSITION-01-13
- HORIZON-CL4-2022-TWIN-TRANSITION-01-15
- HORIZON-CL4-2022-TWIN-TRANSITION-01-16
- HORIZON-CL4-2022-TWIN-TRANSITION-01-17
Showing the latest information. Found 1 version of this call topic in the F&T portal.
Information from
- 2024-03-30_14-18-41
Annotations (will be publicly visible when approved)
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 4 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Publication date
- 4 years agoThe call was published on the Funding & Tenders Portal.
-
Opening date
- 3 years agoThe call opened for submissions.
-
Closing date
- 3 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 2 years agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 2 years agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)