HORIZON-CL5-2024-D3-01-08

Demonstration of sustainable wave energy farms -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • De-risking wave energy technology development and increased bankability/insurability of wave energy.
  • Increased availability and improved market confidence in the technology.
  • Increased knowledge on positive and negative impacts of ocean energy on its environment and in the case of negative impacts to protected habitats and species proposals for necessary mitigation measures.
  • Publicly available data collected from the demonstration/pilot structure including support structure.

Scope:

Demonstration of sustainable wave energy pilot farms (minimum 2.0 MW installed capacity and at least 4 devices) in full operational conditions for long periods of time is essential to advance this sector. It is the way to bridge the gap from technology development to market development while reducing costs, reducing risks and attracting investors for future commercial projects. The farms should be composed of several devices of the same type.

The wave energy farms have to be connected to the electricity grid. To focus on the technologies with the greatest chances of success, the single wave energy device to be used in the array deployment is expected to be satisfactorily demonstrated at full scale before, with limited changes to incorporate the learnings. Any change on the wave energy device may be incremental but should not involve fundamental changes to the device design or composition. The innovation component should mainly lie on the pilot farm systems and supporting industrial manufacturing activities that enable a cost-effective and high-performance pilot farm. Where established, stage-gate processes can help ensure that this approach is followed.

The project is expected to deploy a wave energy farm with a minimum capacity of 2 MW and operate the farm at least 2 years in the lifetime of the project. After the project it is expected that the farm will continue to be operated for at least 8 years. The project should develop and execute an effective operation and maintenance programme.

Proposals are expected to address also all the following for both the supporting infrastructure for the farm and for the individual devices themselves:

  • Industrial design and manufacturing processes including set up of an industrial supply chain, circularity of (critical) raw materials, sustainability, scalability, installation methods, transport, operation & maintenance, supply chains and the related digital infrastructures.
  • Projects are requested to demonstrate the technologies at sea while respecting existing environmental regulatory framework. Necessary mitigation measures should be integrated to protect habitats and species. Present an environmental monitoring plan to be implemented during the demonstration action. Environmental monitoring data should be open source and be shared with EMODNET and the IEA OES environmental task.

The project has to include a clear go/no go moment ahead of entering the deployment phase. Before this go/no-go moment, the project has to deliver the detailed engineering plans, a techno-economic assessment, including key performance indicators based on international recognized metrics, a complete implementation plan and all needed permits for the deployment of the project., The project proposal is expected to present a clear and convincing pathway to obtaining necessary permits for the demonstration actions and allow for appropriate timelines to achieve these. The project is expected also to demonstrate how it will get a financial close for the whole action. For this the use of other EU/national/regional support mechanisms can be considered. Independent experts will assess all deliverables and will advise for the go/no-go decision.

The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan, financial model) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Data from the pilot structures should be collected to understand the performance and behaviour of the structure and the surrounding environmental condition to optimise the concept and understand the environmental impact of wave energy harvesting.

The selected projects are expected to contribute to the BRIDGE initiative[1], actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant.

null

Activities are expected to achieve TRL 8 by the end of the project – see General Annex B.

[1] https://www.h2020-bridge.eu/

News flashes

2024-05-15

Call update: EVALUATION results

Published: 12/09/2023

Deadline: 16/01/2024

 

Available budget: EUR 246.000.000

The results of the evaluation for each topic are as follows:

 

 

D3-01-01

D3-01-02

D3-01-03

D3-01-04

D3-01-05

D3-01-06

D3-01-07

D3-01-08

D3-01-09

D3-01-10

D3-01-11

D3-01-12

D3-01-13

D3-01-14

D3-01-15

D3-01-16

D3-01-17

Number of proposals submitted (including proposals transferred from or to other calls)

12

14

13

13

13

12

14

13

2

101

8

19

5

7

10

6

2

Number of inadmissible proposals

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

Number of ineligible proposals

1

 

2

 

 

 

 

1

1

6

 

 

 

 

 

 

 

Number of above-threshold proposals

7

10

4

6

2

6

8

4

1

26

5

15

3

5

6

3

2

Total budget requested for above-threshold proposals (EUR/millions)

81.9

29.4

35.5

23.6

7.6

18.0

31.5

74.7

10.0

77.7

26.6

75.3

17.9

20.2

32.4

24.5

11.9

Number of proposals retained for funding

2

2

2

2

2

3

2

2

1

9

3

2

2

3

3

1

2

Number of proposals in the reserve list

2

2

2

2

0

2

2

2

0

10

2

2

1

2

2

2

0

Funding threshold

13.5

14.0

13.5

14.0

11.0

13.5

13.0

13.0

10.5

13.5

11.5

13.5

14.0

11.0

13.5

13.5

11.0

Ranking distribution for proposals above the evaluation thresholds

 

 

 

 

 

 

 

 

 

 

 

 

Number of proposals with scores lower or equal to 15 and higher or equal to 14

1

2

1

3

 

0

2

1

0

0

 

5

 

1

1

2

0

1

0

0

Number of proposals with scores lower than 14 and higher or equal to 13

2

1

3

3

1

2

1

3

0

10

1

4

0

1

3

1

0

Number of proposals with scores lower than 13 and higher or equal to 10

4

7

0

0

1

2

6

1

1

11

3

10

1

4

2

2

2

 

Summary of observer report:

"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.

I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.

All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

 

2024-01-17
The call for proposals HORIZON-CL5-2024-D3-01 closed on 16/01/2024. 264 proposals were submitted to the call. The breakdown per topic is: HORIZON-CL5-2024-D3-01-01          (IA) : 12 proposalsHORIZON-CL5-2024-D3-01-02          (IA-LS) : 14 proposalsHORIZON-CL5-2024-D3-01-03          (IA-LS) : 13 proposalsHORIZON-CL5-2024-D3-01-04          (RIA) : 13 proposalsHORIZON-CL5-2024-D3-01-05          (RIA) : 13 proposalsHORIZON-CL5-2024-D3-01-06          (RIA) : 12 proposalsHORIZON-CL5-2024-D3-01-07          (RIA) : 14 proposalsHORIZON-CL5-2024-D3-01-08          (IA) : 13 proposalsHORIZON-CL5-2024-D3-01-09          (Co-fund) : 2 proposalsHORIZON-CL5-2024-D3-01-10          (RIA) : 101 proposalsHORIZON-CL5-2024-D3-01-11          (IA) : 8 proposalsHORIZON-CL5-2024-D3-01-12          (IA) : 19 proposalsHORIZON-CL5-2024-D3-01-13          (RIA) : 5 proposalsHORIZON-CL5-2024-D3-01-14          (RIA) : 7 proposalsHORIZON-CL5-2024-D3-01-15          (RIA-LS) : 10 proposalsHORIZON-CL5-2024-D3-01-16          (IA) : 6 proposalsHORIZON-CL5-2024-D3-01-17          (IA) : 2 proposals 
2023-09-12
The submission session is now available for: HORIZON-CL5-2024-D3-01-07(HORIZON-RIA), HORIZON-CL5-2024-D3-01-10(HORIZON-RIA), HORIZON-CL5-2024-D3-01-03(HORIZON-IA), HORIZON-CL5-2024-D3-01-13(HORIZON-RIA), HORIZON-CL5-2024-D3-01-16(HORIZON-IA), HORIZON-CL5-2024-D3-01-04(HORIZON-RIA), HORIZON-CL5-2024-D3-01-01(HORIZON-IA), HORIZON-CL5-2024-D3-01-09(HORIZON-COFUND), HORIZON-CL5-2024-D3-01-14(HORIZON-RIA), HORIZON-CL5-2024-D3-01-08(HORIZON-IA), HORIZON-CL5-2024-D3-01-17(HORIZON-IA), HORIZON-CL5-2024-D3-01-15(HORIZON-RIA), HORIZON-CL5-2024-D3-01-06(HORIZON-RIA), HORIZON-CL5-2024-D3-01-11(HORIZON-IA), HORIZON-CL5-2024-D3-01-12(HORIZON-IA), HORIZON-CL5-2024-D3-01-02(HORIZON-IA), HORIZON-CL5-2024-D3-01-05(HORIZON-RIA)
call topic details
Call status: Closed
Opening date: 2023-09-12 (2 years ago)
Closing date: 2024-01-16 (2 years ago)
Procedure: single-stage

Budget: 38,000,000
Expected grants: 2
Contribution: 18,000,000 - 20,000,000
News flashes

This call topic has been appended 3 times by the EC with news.

  • 2024-05-15
    call update: evaluation resultspublished...
  • 2024-01-17
    the call for proposals horizon-cl5-2024-...
  • 2023-09-12
    the submission session is now available...
Source information

Showing the latest information. Found 5 versions of this call topic in the F&T portal.

Information from

  • 2026-02-18_06-57-30
  • 2024-11-23_03-30-32
  • 2024-09-30_21-22-35
  • 2024-07-04_15-01-42
  • 2024-03-30_14-17-43

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 2 years ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Opening date

    - 2 years ago

    The call opened for submissions.

  3. Closing date

    - 2 years ago

    Deadline for submitting a project.

  4. Time to inform applicants Estimate

    - 1 year ago

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  5. Sign grant agreement Estimate

    - 1 year ago

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

  6. Publication date

    - 1 year ago

    The call was first imported in TopicTree.

  7. Today

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Bubbles

This call topic is part of:

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal