HORIZON-CL5-2024-D3-01-17
Development and integration of advanced software tools in SCADA systems for High, Medium and Low voltage AC/DC hybrid systems -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Project results are expected to contribute to at least three of the following outcomes:
- Optimised connection between power system design, preoperational planning and real-time monitoring and control.
- Measures and strategies for stability management of the future HVDC/MTDC power system connecting renewable energies (more specifically onshore wind farm).
- Measures and strategies for stability management of the future AC/DC hybrid power system with a high share of Power Electronic Interfaced Devices (PEID).
- Real-time capable algorithms and tools that enables optimal operation of the hybrid AC/DC system (e.g., avoidance of circular flows) and to support security analyses.
- Innovative ancillary services (e.g., frequency control, mitigation of periodic frequency fluctuations, voltage regulation and reactive power control).
- The possibilities offered by fast DC control in terms of islanding, black-start capability, firewalling for fault impact minimisation/avoidance, support for fault identification and return to safe, normal operation.
- Increased security of supply through firewalling cascading effects due to faults or cyberattacks by segmentation of the grid with a DC link.
Scope:
Projects are expected to implement the activities in (1), the practical demonstration (2) and the recommendations for grid codes (3) for a realistic use case, at one or two voltage levels or at system level including all three voltage levels as described below:
- Development of innovative technologies, algorithms and analysis modules for multi terminal HVDC system – Software tools for analysing stability compatibility between DC and AC power system (e.g., Grid forming Vs. DC voltage stability)
- Development of innovative algorithms and software tools for analysing and controlling the system of mixed, hybrid AC/DC grids. Integration of these tools into the control room software.
- Scalable and flexible software framework for operation of hybrid AC/DC power systems supporting various vendor-dependent systems and component models, e.g., more accurate and wider representation of connected systems, power flow calculations.
- Vendor independent hybrid DC/AC network SCADA/Energy Management System and upper-level control of voltage source converters (multi-vendor, multi-terminal), including changing active power set points, voltage/reactive power control set points and changing controller parameters.
- Development and management of small signal and dynamic stability in a hybrid AC/DC power system with high penetration of inverter-based resources.
- Development of a robust online real-time estimation and calculation of the system state of the AC, DC and hybrid system.
- Development of safety and reliability analysis of the system state, analysis of possible failure situations as well as curative measures for the failure event, e.g., transient and dynamic stability, coordinated risk management.
- Development and integration of cyber secure resilient ICT platforms and communication for data exchange.
- Development of a DC link for firewalling the grid from cascading effects due to faults or cyberattacks.
null
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B.
News flashes
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Opening date: 2023-09-12 (2 years ago)
Closing date: 2024-01-16 (2 years ago)
Procedure: single-stage
Budget: 12,000,000
Expected grants: 2
Contribution: 6,000,000 - 6,000,000
This call topic has been appended 3 times by the EC with news.
-
2024-05-15
call update: evaluation resultspublished... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2023-09-12
the submission session is now available...
HORIZON-CL5-2024-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 16 other topics in this call:
- HORIZON-CL5-2024-D3-01-01
- HORIZON-CL5-2024-D3-01-02
- HORIZON-CL5-2024-D3-01-03
- HORIZON-CL5-2024-D3-01-04
- HORIZON-CL5-2024-D3-01-05
- HORIZON-CL5-2024-D3-01-06
- HORIZON-CL5-2024-D3-01-07
- HORIZON-CL5-2024-D3-01-08
- HORIZON-CL5-2024-D3-01-09
- HORIZON-CL5-2024-D3-01-10
- HORIZON-CL5-2024-D3-01-11
- HORIZON-CL5-2024-D3-01-12
- HORIZON-CL5-2024-D3-01-13
- HORIZON-CL5-2024-D3-01-14
- HORIZON-CL5-2024-D3-01-15
- HORIZON-CL5-2024-D3-01-16
Showing the latest information. Found 5 versions of this call topic in the F&T portal.
Information from
- 2026-02-18_06-56-57
- 2024-11-23_03-30-31
- 2024-09-30_21-22-35
- 2024-07-04_15-01-40
- 2024-03-30_20-31-31
Check the differences between the versions.
Annotations
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 2 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Opening date
- 2 years agoThe call opened for submissions.
-
Closing date
- 2 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 1 year agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 1 year agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Publication date
- 1 year agoThe call was first imported in TopicTree.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)