HORIZON-CL5-2024-D3-01-14
Condition & Health Monitoring in Power Electronics (PE) - Wide Band Gap PE for the energy sector -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Project results are expected to contribute to all the following outcomes:
a. Condition and Health Monitoring:
- Capability to anticipate failures of Power Electronics (PE) in wind farms and converters of the DC grid to prevent downtime.
- Techniques to set the equipment in limp mode to enable to withstand the stress until next maintenance.
- Demonstration of Condition and Health Monitoring (C&HM) for converters of wind turbines generators and HVDC converter stations or MVDC converters (solar energy).
b. Wide Band Gap and Ultra-Wide Bandgap PE:
- Development of new semiconductor power device technologies, in particular Wide Bandgap (WBG) and ultra-wide Bandgap (UWBG) semiconductors
- Availability of more efficient Power Electronics components for the development of new generation of inverters, converters and other power equipment in the energy sector.
- Reduced space occupancy aiming mainly at offshore applications.
- Improved cost efficiency of power devices and semiconductor fabrication processes.
Scope:
Projects are expected to implement both the activities in (1) and the practical demonstration (2) as described below:
1. R&I, methodologies and tools involving the activities listed below. These can be developed/complemented with others pertinent to each sub-topic.
A. Condition and Health Monitoring (C&HM):
- Estimation of junction temperature Tj based on TSEPs (thermo-sensitive electrical parameters). Here especially big challenge present SiC MOSFETS and Schottky diodes because the TSEPs sensitivity is lower, non-linear and depends on the built technology. Further issues are calibration, circuit drift, influence of PWM and other.
- Development of new and evaluation/further development of already existing unconventional techniques to measure temperature and estimate degradation (such as for example, but not limited to, Kelvin connection or acoustic based methods).
- Development and evaluation of new or already existing techniques for generating the lifetime models based on big-data analysis and by utilisation of soft computing techniques.
- Combination of (big) data-driven and physics-of-failure driven approaches in C&HM.
B. Stress Steering:
- Successful business case realisation requires co-operation and communication between different partners:
- Manufacturers of power electronics components (for example to integrate sometimes-necessary sensors).
- System designer (to provide access to the data such as measured load cycles and general mission profiles).
- Companies responsible for operation and maintenance of the systems. Currently those companies are especially for offshore wind parks developing their own C&HM systems, which are operating, based on sometimes-scarce available data.
- Optimisation is possible when already initial products would be designed to obtain data/measurements needed in C&HM. For power electronics modules, the most valuable data seems to be Tj (junction temperature):
- Careful estimation of the costs of maintenance for specified applications (it seems they are currently underestimated).
- Investigation of different costs models (e.g., the final costs for C&HM can be absorbed by the producers especially when it is also responsible for maintenance, or it can be transferred to the final user whenever the final user can provide safer and more reliable service).
C. Wide Band Gap and Ultra-Wide Bandgap PE:
Improvement of WBG and UWBG semiconductors for integration in HVDC and MVDC components. Work should focus on improving wide bandgap semiconductor devices, packaging and their integration in converter submodules:
- Improved WBG and UWBG power devices with better performance metrics, e.g., lower conduction losses, higher blocking voltage, better surge current capability, higher switching frequencies and better short-circuit capability.
- Advanced control circuits for WBG and UWBG based bridges.
- Improved packages featuring high-voltage insulation, high temperature operation, robustness, and low eddy currents.
- New submodule topologies for HVDC converters and/or new converter topologies for MVDC converters with WBG and UWBG semiconductors and better performance metrics, e.g., reduced losses, higher reliability, lower volume / weight, less costs.
- Implementing WBG and UWBG semiconductor devices for DC protection devices, e.g., DC breakers.
- Improved cost efficiency of components based on WBG semiconductors.
2. Demonstration, test and validation of the activities developed in (1) (A, B and C) in at least two pilots (all activities A, B and C developed for each pilot) in different EU Member States/Associated Countries.
null
Activities are expected to achieve TRL 5-6 by the end of the project – see General Annex B.
News flashes
Call update: EVALUATION results
Published: 12/09/2023
Deadline: 16/01/2024
Available budget: EUR 246.000.000
The results of the evaluation for each topic are as follows:
D3-01-01
D3-01-02
D3-01-03
D3-01-04
D3-01-05
D3-01-06
D3-01-07
D3-01-08
D3-01-09
D3-01-10
D3-01-11
D3-01-12
D3-01-13
D3-01-14
D3-01-15
D3-01-16
D3-01-17
Number of proposals submitted (including proposals transferred from or to other calls)
12
14
13
13
13
12
14
13
2
101
8
19
5
7
10
6
2
Number of inadmissible proposals
1
Number of ineligible proposals
1
2
1
1
6
Number of above-threshold proposals
7
10
4
6
2
6
8
4
1
26
5
15
3
5
6
3
2
Total budget requested for above-threshold proposals (EUR/millions)
81.9
29.4
35.5
23.6
7.6
18.0
31.5
74.7
10.0
77.7
26.6
75.3
17.9
20.2
32.4
24.5
11.9
Number of proposals retained for funding
2
2
2
2
2
3
2
2
1
9
3
2
2
3
3
1
2
Number of proposals in the reserve list
2
2
2
2
0
2
2
2
0
10
2
2
1
2
2
2
0
Funding threshold
13.5
14.0
13.5
14.0
11.0
13.5
13.0
13.0
10.5
13.5
11.5
13.5
14.0
11.0
13.5
13.5
11.0
Ranking distribution for proposals above the evaluation thresholds
Number of proposals with scores lower or equal to 15 and higher or equal to 14
1
2
1
3
0
2
1
0
0
5
1
1
2
0
1
0
0
Number of proposals with scores lower than 14 and higher or equal to 13
2
1
3
3
1
2
1
3
0
10
1
4
0
1
3
1
0
Number of proposals with scores lower than 13 and higher or equal to 10
4
7
0
0
1
2
6
1
1
11
3
10
1
4
2
2
2
Summary of observer report:
"As independent Observer I was able to acquire deep insight into the call and evaluation documentation and accompanying instructions. I took part in a significant fraction of all briefings and panel meetings, had full access to the online evaluation SEP system and could both monitor the evaluation progress as well as having insight in individual evaluation and consensus reports.
I observed a professionally orchestrated, fair, impartial, expertise-driven, and transparent evaluation exercise. The consensus reports, the ultimate outcome, meet high standards and adhere to the guidelines outlined in the guiding documents and applicable rules.
All consensus panels were managed as equitably as possible, with effective quality control measures, inter-panel collaboration, and comprehensive final cross-checks ensuring a consistent evaluation outcome. The core principles of impartiality, fairness, and confidentiality were followed throughout the full evaluation process."
We recently informed the applicants about the evaluation results for their proposals.
For questions, please contact the Research Enquiry Service.
Please note that the Type of MGA displayed on the portal for this topic has now been corrected to a standard HORIZON Action Grant Budget-Based (ie no longer Lump Sum).
WARNING: Please note that this topic incorrectly appears as "Lump Sum" on the Participant Portal. It is not a Lump Sum (see PDF of the Work Programme) and will be corrected in due course, before the topic opens for submission.
Opening date: 2023-09-12 (2 years ago)
Closing date: 2024-01-16 (2 years ago)
Procedure: single-stage
Budget: 13,000,000
Expected grants: 3
Contribution: 4,000,000 - 4,000,000
This call topic has been appended 5 times by the EC with news.
-
2024-05-15
call update: evaluation resultspublished... -
2024-01-17
the call for proposals horizon-cl5-2024-... -
2023-09-12
the submission session is now available... -
2023-08-28
please note that the type of mga display... -
2023-07-20
warning: please note that this topic inc...
HORIZON-CL5-2024-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 16 other topics in this call:
- HORIZON-CL5-2024-D3-01-01
- HORIZON-CL5-2024-D3-01-02
- HORIZON-CL5-2024-D3-01-03
- HORIZON-CL5-2024-D3-01-04
- HORIZON-CL5-2024-D3-01-05
- HORIZON-CL5-2024-D3-01-06
- HORIZON-CL5-2024-D3-01-07
- HORIZON-CL5-2024-D3-01-08
- HORIZON-CL5-2024-D3-01-09
- HORIZON-CL5-2024-D3-01-10
- HORIZON-CL5-2024-D3-01-11
- HORIZON-CL5-2024-D3-01-12
- HORIZON-CL5-2024-D3-01-13
- HORIZON-CL5-2024-D3-01-15
- HORIZON-CL5-2024-D3-01-16
- HORIZON-CL5-2024-D3-01-17
Showing the latest information. Found 5 versions of this call topic in the F&T portal.
Information from
- 2026-02-18_06-57-20
- 2024-11-23_03-30-31
- 2024-09-30_21-22-35
- 2024-07-04_15-01-35
- 2024-03-30_14-18-21
Check the differences between the versions.
Annotations
Events
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 2 years agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Opening date
- 2 years agoThe call opened for submissions.
-
Closing date
- 2 years agoDeadline for submitting a project.
-
Time to inform applicants Estimate
- 1 year agoThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 1 year agoThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
-
Publication date
- 1 year agoThe call was first imported in TopicTree.
-
Today
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)