HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-39
Towards human-centric, sustainable and resilient energy-intensive industries (Processes4Planet and Clean Steel partnerships) (CSA) -
About the connections
The graph above was generated based on the following links
Call text (as on F&T portal)
View on F&T portalProposals should contribute to the following outcomes:
- Facilitate radical workplace innovation, optimising human-machine interactions and capitalising on the added value of human workers via digital technologies;
- Contribute to the development of innovative technologies in a human-centric way while reducing the risk and negative health impacts at work;
- Incorporate new breakthrough technologies and realise new production processes with respect to human-centric design, environmental- and societal impacts and resilience;
- Improve the capacities of actors to integrate Industry 5.0 (human-centricity, sustainability, and resilience) in the technological development processes by at the same time increasing the competitiveness of the industry.
Industry 5.0 recognises the power of industry to achieve societal goals beyond jobs and growth to become a resilient provider of prosperity. It focuses on making production respect the boundaries of our planet improving competitiveness of European process industries and placing the wellbeing of the industrial worker at the centre of the production process, while increasingly embracing digital and green technologies to remain the solution provider for all Europeans.
Coordination and support activities should address all of the following:
- Prepare an overview of the state of the preconditions for adding the Industry 5.0 perspective to energy intensive industries - this includes human-centric, gender-specific, resilience and sustainability aspects;
- Map technologies (e.g., industrial wearable, human digital twin, extended reality) integrating individual competences and increasing usability, specifically applicable to energy intensive industries sectors and processes. For example, technologies i) supporting the co-design of processes and workplaces, enhancing the remote monitoring experience and creating new capabilities for operating; ii) supporting new forms of human-machine interaction by providing real-time feedback on personal performance and holistic intuitive workplace interfaces; or iii) co-designed in accordance with user expectations and the integration of workplace experience;
- Explore through a practical assessment how the process automation technologies currently in use in Process Industries are making use of innovative the industry 5.0 technologies (the practical assessment is expected to cover several companies and at least five industry sectors);
- Develop an Industry 5.0 framework and engage with a wide range of stakeholders including labour authorities and ongoing relevant sectoral social dialogues at European level. This should include empower employees in a participatory approach for adding the industry 5.0 dimension to the industrial processes including the reduction of risk and health issues;
- Dissemination and communication of information and knowledge to stakeholders including industry, policy makers, research and education actors, civil society and general public;
- Proposals should specifically address gender, age, and disability considerations, recognising potential variations in technological adoption and impact across diverse demographic groups.
This topic implements the co-programmed European partnerships Processes4Planet and Clean Steel partnerships.
News flashes
CALL UPDATE: PROPOSAL NUMBERS
Call HORIZON-CL4-2025-01 has closed on the 23/09/2025.
639 proposals have been submitted.
The breakdown per topic is:
Topic ID
Topic title
Action type
Proposals submitted
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-01
Integrated approaches for remanufacturing (Made in Europe Partnership) (IA)
IA
80
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-02
Physical and cognitive augmentation in advanced manufacturing (Made in Europe Partnership) (RIA)
RIA
94
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-05
Advanced manufacturing technologies for leadership of EU manufacturers in products for the net-zero industry (Made in Europe Partnership) (IA)
IA
64
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-31
From heat-driven processes to the use of mechanical and electric forces (Processes4Planet Partnership) (IA)
IA
13
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-32
Green and resilient flexible production processes (Processes4Planet Partnership) (IA)
IA
19
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-33
Integrated use of renewable energy carriers in industrial sites (Processes4Planet Partnership) (RIA)
RIA
35
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-34
Smart integration of net zero technologies into Energy Intensive industries (Processes4Planet and Made in Europe Partnerships) (IA)
IA
12
TWIN-TRANSITION-36
Safe and clean processing technologies and products (Processes4Planet Partnership) (RIA)
RIA
25
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-37
Solving issues in carbon-neutral iron and steel making processes with diverse input materials of varying quality (Clean Steel Partnership) (RIA)
RIA
22
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-38
Synergies and mutual learning with national and regional initiatives in Europe on Industrial decarbonisation (Processes4Planet and Clean Steel Partnerships) (CSA)
CSA
1
HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-39
Towards human-centric, sustainable and resilient energy-intensive industries (Processes4Planet and Clean Steel Partnerships) (CSA)
CSA
3
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-31
Digitally enabled local-for-local textile and apparel production (Textiles for the Future Partnership) (IA)
IA
33
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-44
Innovative Advanced Materials Innovation Procurement (CSA)
CSA
4
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-45
Materials Commons for Europe (IA)
IA
3
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-52
Accelerate the uptake of life-cycle assessment (LCA) for Safe and Sustainable by Design (SSbD) chemicals and materials and resulting products (RIA)
RIA
35
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-61
Technologies for critical raw materials and strategic raw materials from end-of-life products (IA)
IA
38
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-62
Strategic Partnerships for Raw Materials: Innovative approaches for sustainable production of Critical Raw Materials (IA)
IA
31
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-63
Innovative solutions for the sustainable production for semiconductor raw materials (IA)
IA
7
HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-64
EU Co-funded Partnership on raw materials for the green and digital transition (Programme Co-fund action)
COFUND
1
HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-61
AI Foundation models in science (GenAI4EU) (RIA)
RIA
47
HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-62
Facilitated cooperation for AI in Science (CSA)
CSA
7
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-60
Horizon Standardisation Booster (CSA)
CSA
3
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-61
Standardisation landscape analyses tool (CSA)
CSA
3
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-62
Artificial Intelligence for knowledge valorisation (CSA)
CSA
15
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-63
Value creation pilots for scaling up innovative solutions (CSA)
CSA
10
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-64
Pilot initiatives on Technology Infrastructures (CSA)
CSA
20
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-65
Network of Industry 5.0 system innovation hubs in connected Regional Innovation Valleys (IA)
IA
8
HORIZON-CL4-INDUSTRY-2025-01-HUMAN-66
Assessment of Technology Infrastructure needs in Ukraine (CSA)
CSA
6
Total:
639
Evaluation results are expected to be communicated around mid-January 2026.
A.R.
Reminder on proposal part B page limit and formatting conditions
1. Proposal part B page limit
The title, list of participants and sections 1, 2 and 3, together, should not be longer than page limit, indicated in a proposal part B template inside the Submission System. All tables, figures, references and any other element pertaining to these sections must be included as an integral part of these sections and are thus counted against this page limit.
The page limit will be applied automatically. At the end of a proposal part B template inside the Submission System you can see the structure of the actual proposal that you need to submit, please remove all instruction pages that are watermarked.
If you attempt to upload a proposal longer than the specified limit before the deadline, you will receive an automatic warning and will be advised to shorten and re-upload the proposal. After the deadline, excess pages (in over-long proposals/applications) will be automatically made invisible, and will not be taken into consideration by the experts. The proposal is a self-contained document. Experts will be instructed to ignore hyperlinks to information that is specifically designed to expand the proposal, thus circumventing the page limit.
Please, do not consider the page limit as a target! It is in your interest to keep your text as concise as possible, since experts rarely view unnecessarily long proposals in a positive light.
2.Proposal part B formatting conditions
The following formatting conditions apply (as listed in a proposal part B template inside the Submission System) and will be checked by the Agency during an admissibility check of submitted proposals.
The reference font for the body text of proposals is Times New Roman (Windows platforms), Times/Times New Roman (Apple platforms) or Nimbus Roman No. 9 L (Linux distributions).
The use of a different font for the body text is not advised and is subject to the cumulative conditions that the font is legible and that its use does not significantly shorten the representation of the proposal in number of pages compared to using the reference font (for example with a view to bypass the page limit).
The minimum font size allowed is 11 points. Standard character spacing and a minimum of single line spacing is to be used. This applies to the body text, including text in tables.
Text elements other than the body text, such as headers, foot/end notes, captions, formula's, may deviate, but must be legible.
The page size is A4, and all margins (top, bottom, left, right) should be at least 15 mm (not including any footers or headers).
Proposal part B template inside the Submission System document is tagged. Do not delete the tags; they are needed for our internal processing of information, mostly for statistical gathering. In that light, please do not move, delete, re-order, alter tags in any way, as they might create problems in our internal processing tools. Tags do not affect or influence the outcome of your application.
Please note that due to a technical issue, during the first days of publication of this call, the topic page did not display the description of the corresponding destination. This problem is now solved. In addition to the information published in the topic page, you can always find a full description of destinations:
* destination 1: Achieving global leadership in climate-neutral, circular and digitised industrial and digital value chains;
* destination 2: Achieving technological leadership for Europe's open strategic autonomy in raw materials, chemicals and innovative materials;
* destination 4: Achieving open strategic autonomy in digital and emerging enabling technologies;
* destination 6: Digital and industrial technologies driving human-centric innovation,
that are relevant for the call in the Work Programme 2025 part for “Industry”. Please select from the work programme the destination relevant to your topic and take into account the description and expected impacts of that destination for the preparation of your proposal.
Publication date: 2025-05-22 (6 months ago)
Opening date: 2025-05-22 (6 months ago)
Closing date: 2025-09-23 (2 months ago)
Procedure: single-stage
Budget: 2,000,000
Expected grants: 1
Contribution: 2,000,000 - 2,000,000
This call topic has been appended 4 times by the EC with news.
-
2025-12-06
call update: proposal numberscall horizo... -
2025-12-06
reminder on proposal part b page limit a... -
2025-12-06
please note that due to a technical issu... -
2025-12-06
the submission session is now available...
HORIZON-CL4-2025-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 27 other topics in this call:
- HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-61
- HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-62
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-60
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-61
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-62
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-63
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-64
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-65
- HORIZON-CL4-INDUSTRY-2025-01-HUMAN-66
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-31
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-44
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-45
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-52
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-61
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-62
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-63
- HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-64
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-01
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-02
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-05
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-31
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-32
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-33
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-34
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-36
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-37
- HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-38
Showing the latest information. Found 6 versions of this call topic in the F&T portal.
Information from
- 2025-10-28_15-46-29
- 2025-07-01_03-30-40
- 2025-06-27_03-30-46
- 2025-06-11_03-30-18
- 2025-05-22_03-30-16
- 2025-05-15_03-30-18
Check the differences between the versions.
Annotations (will be publicly visible when approved)
Events
Horizon Europe info days - Cluster 4
2025-05-13 -> 2025-05-14
online
This event aims to inform potential applicants about the funding opportunities within the Work Programme 2025 of the Horizon Europe Cluster 4 'Digital, Industry and Space'.
Horizon Europe - Industry 2025 Brokerage event
2025-05-14 -> 2025-09-23
online
NCP4Industry, the network of Cluster 4 - Industry National Contact Points and the Enterprise Europe Network are organising a brokerage event with pre-arranged online Face2Face meetings complementing the European Commission's Horizon Europe Information Day on Cluster 4 - Digital, Industry & Space with a 2025 deadline.
Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.
Call topic timeline
-
Work programme available
- 8 months agoThe call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.
-
Publication date
- 6 months agoThe call was published on the Funding & Tenders Portal.
-
Opening date
- 6 months agoThe call opened for submissions.
-
Closing date
- 2 months agoDeadline for submitting a project.
-
Today
-
Time to inform applicants Estimate
- 2 months from nowThe maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.
-
Sign grant agreement Estimate
- 5 months from nowThe maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)