HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-34

Smart integration of net zero technologies into Energy Intensive industries (Processes4Planet and Made in Europe partnerships) (IA) -

About the connections

The graph above was generated based on the following links

Call text (as on F&T portal)

View on F&T portal
Expected Outcome:

Manufactures of net zero technology solutions, as well as energy intensive industries will benefit from the following outcomes:

  • Enable the sustainable and efficient use of energy in the energy intensive industries by bridging the gap between users and manufacturers of net-zero solutions for the energy-intensive industries.
  • Foster win-win situations in which equipment manufactures co-create solutions with the energy-intensive industrial sectors opening new markets for the net-zero technologies;
  • Develop new net-zero technologies industrially integrated processes that support the decarbonization of industry and offer new market opportunities;
  • Enhance competitiveness of the European Energy Intensive and manufacturing industries;
  • Accelerate the adoption of net-zero technologies in the energy intensive industries.
Scope:

As the industry decarbonises net-zero technologies[1] can be applied to a wide range of energy intensive sectors and processes. Furthermore, the Net-Zero Industry Act which is part of the Green Deal Industrial Plan, is aiming at increasing the manufacturing capacity of strategic net-zero technologies to meet at least 40% of the EU’s annual deployment needs. In this framework the aim of this topic is to accelerate the deployment of net-zero technologies in at least one industrial sectors through a closer collaboration between, net-zero technology manufacturers and energy intensive industries.

Proposals under this topic should address several of the following:

  • Facilitate collaboration between at least one energy intensive industrial sector, with manufacturers of net-zero technology solutions, as well as where relevant engineering, and construction firms for the smart integration of one or several net-zero technologies in specific processes. Several energy intensive industrial sectors can be considered if they share similar processes and energy related needs;
  • Assess the needs of the proposed industrial sector(s) to define ‘standard’ process(es) and assess operational energy needs through a closer exchange with net-zero technology manufacturers and suppliers in order to effectively design sustainable and cost-efficient energy solutions;
  • Optimise and adapt technologies, products and solutions proposed by manufacturers of net zero technologies to meet the industrial sector needs;
  • Propose and demonstrate the necessary modifications of processes for the efficient and flexible incorporation and the integration of net zero technologies in existing industrial plants;
  • Demonstrate the effectiveness and replicability of the proposed approaches allowing to move from custom-built project by project approach for each specific industrial plant and process, to more streamlined, standardised yet flexible solution for industrial sector(s) and/or processes;
  • Develop solutions offering an optimal balance between standardisation and flexibility as well as providing high-quality tailored solutions at competitive prices;
  • Support the development of skills for the integration of net-zero technologies into energy intensive industries.

Proposals should involve all actors in the value chain from the manufacturers of net zero technology solutions to energy intensive industries and engineering and construction firms. Interoperability and secure and trusted data sharing between the stakeholders of the value chain should be ensured.

Proposals submitted under this topic should include a business case and exploitation strategy, as outlined in the introduction to this Destination. As project output an elaborated exploitation plan should be developed, including preliminary plans for scalability, commercialisation and deployment (feasibility study, business plan and financial model) indicating possible private and public funding sources (e.g. Innovation Fund, InvestEU and cohesion policy funds). Societal- and environmental impact as well as implications for the workplace (including skills and organisational changes) should be outlined. Proposals should ensure dissemination and replication of the proposed approaches for wide deployment, including advising and building capacity among the relevant actors. Proposals should be based on a sound techno-economic analysis that confirms the economic viability in view of evolving regulatory frameworks.

The inclusion of a GHG avoidance methodology[2] is recommended and should provide detailed description of baselines and projected reductions.

The attention of proposers is also drawn to the complementary topic HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-05: Advanced manufacturing technologies for leadership of EU manufacturers in products for the net-zero industry.

This topic implements the co-programmed European partnerships Processes4Planet and Made in Europe.

[1] Net-zero technologies as defined in the Net Zero Industry Act, Annex I: Strategic Net-zero Technologies

[2] That could follow Innovation Fund methodology: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/innovfund/wp-call/2021/call-annex_c_innovfund-lsc-2021_en.pdf

News flashes

2025-12-06

CALL UPDATE: PROPOSAL NUMBERS

Call HORIZON-CL4-2025-01 has closed on the 23/09/2025.

639 proposals have been submitted.

The breakdown per topic is:

Topic ID

Topic title

Action type

Proposals submitted

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-01

Integrated approaches for remanufacturing (Made in Europe Partnership) (IA)

IA

80

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-02

Physical and cognitive augmentation in advanced manufacturing (Made in Europe Partnership) (RIA)

RIA

94

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-05

Advanced manufacturing technologies for leadership of EU manufacturers in products for the net-zero industry (Made in Europe Partnership) (IA)

IA

64

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-31

From heat-driven processes to the use of mechanical and electric forces (Processes4Planet Partnership) (IA)

IA

13

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-32

Green and resilient flexible production processes (Processes4Planet Partnership) (IA)

IA

19

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-33

Integrated use of renewable energy carriers in industrial sites (Processes4Planet Partnership) (RIA)

RIA

35

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-34

Smart integration of net zero technologies into Energy Intensive industries (Processes4Planet and Made in Europe Partnerships) (IA)

IA

12

TWIN-TRANSITION-36

Safe and clean processing technologies and products (Processes4Planet Partnership) (RIA)

RIA

25

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-37

Solving issues in carbon-neutral iron and steel making processes with diverse input materials of varying quality (Clean Steel Partnership) (RIA)

RIA

22

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-38

Synergies and mutual learning with national and regional initiatives in Europe on Industrial decarbonisation (Processes4Planet and Clean Steel Partnerships) (CSA)

CSA

1

HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-39

Towards human-centric, sustainable and resilient energy-intensive industries (Processes4Planet and Clean Steel Partnerships) (CSA)

CSA

3

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-31

Digitally enabled local-for-local textile and apparel production (Textiles for the Future Partnership) (IA)

IA

33

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-44

Innovative Advanced Materials Innovation Procurement (CSA)

CSA

4

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-45

Materials Commons for Europe (IA)

IA

3

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-52

Accelerate the uptake of life-cycle assessment (LCA) for Safe and Sustainable by Design (SSbD) chemicals and materials and resulting products (RIA)

RIA

35

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-61

Technologies for critical raw materials and strategic raw materials from end-of-life products (IA)

IA

38

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-62

Strategic Partnerships for Raw Materials: Innovative approaches for sustainable production of Critical Raw Materials (IA)

IA

31

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-63

Innovative solutions for the sustainable production for semiconductor raw materials (IA)

IA

7

HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-64

EU Co-funded Partnership on raw materials for the green and digital transition (Programme Co-fund action)

COFUND

1

HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-61

AI Foundation models in science (GenAI4EU) (RIA)

RIA

47

HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-62

Facilitated cooperation for AI in Science (CSA)

CSA

7

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-60

Horizon Standardisation Booster (CSA)

CSA

3

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-61

Standardisation landscape analyses tool (CSA)

CSA

3

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-62

Artificial Intelligence for knowledge valorisation (CSA)

CSA

15

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-63

Value creation pilots for scaling up innovative solutions (CSA)

CSA

10

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-64

Pilot initiatives on Technology Infrastructures (CSA)

CSA

20

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-65

Network of Industry 5.0 system innovation hubs in connected Regional Innovation Valleys (IA)

IA

8

HORIZON-CL4-INDUSTRY-2025-01-HUMAN-66

Assessment of Technology Infrastructure needs in Ukraine (CSA)

CSA

6

Total:

639

Evaluation results are expected to be communicated around mid-January 2026.

A.R.

2025-12-06

Reminder on proposal part B page limit and formatting conditions

1.    Proposal part B page limit

The title, list of participants and sections 1, 2 and 3, together, should not be longer than page limit, indicated in a proposal part B template inside the Submission System. All tables, figures, references and any other element pertaining to these sections must be included as an integral part of these sections and are thus counted against this page limit.

The page limit will be applied automatically. At the end of a proposal part B template inside the Submission System you can see the structure of the actual proposal that you need to submit, please remove all instruction pages that are watermarked.

If you attempt to upload a proposal longer than the specified limit before the deadline, you will receive an automatic warning and will be advised to shorten and re-upload the proposal. After the deadline, excess pages (in over-long proposals/applications) will be automatically made invisible, and will not be taken into consideration by the experts. The proposal is a self-contained document. Experts will be instructed to ignore hyperlinks to information that is specifically designed to expand the proposal, thus circumventing the page limit.

Please, do not consider the page limit as a target! It is in your interest to keep your text as concise as possible, since experts rarely view unnecessarily long proposals in a positive light.

2.Proposal part B formatting conditions

The following formatting conditions apply (as listed in a proposal part B template inside the Submission System) and will be checked by the Agency during an admissibility check of submitted proposals.

The reference font for the body text of proposals is Times New Roman (Windows platforms), Times/Times New Roman (Apple platforms) or Nimbus Roman No. 9 L (Linux distributions).

The use of a different font for the body text is not advised and is subject to the cumulative conditions that the font is legible and that its use does not significantly shorten the representation of the proposal in number of pages compared to using the reference font (for example with a view to bypass the page limit).

The minimum font size allowed is 11 points. Standard character spacing and a minimum of single line spacing is to be used. This applies to the body text, including text in tables.

Text elements other than the body text, such as headers, foot/end notes, captions, formula's, may deviate, but must be legible.

The page size is A4, and all margins (top, bottom, left, right) should be at least 15 mm (not including any footers or headers).

Proposal part B template inside the Submission System document is tagged. Do not delete the tags; they are needed for our internal processing of information, mostly for statistical gathering. In that light, please do not move, delete, re-order, alter tags in any way, as they might create problems in our internal processing tools. Tags do not affect or influence the outcome of your application.

2025-12-06

Please note that due to a technical issue, during the first days of publication of this call, the topic page did not display the description of the corresponding destination. This problem is now solved. In addition to the information published in the topic page, you can always find a full description of destinations:

* destination 1: Achieving global leadership in climate-neutral, circular and digitised industrial and digital value chains;

* destination 2: Achieving technological leadership for Europe's open strategic autonomy in raw materials, chemicals and innovative materials;

* destination 4: Achieving open strategic autonomy in digital and emerging enabling technologies;

* destination 6: Digital and industrial technologies driving human-centric innovation,

that are relevant for the call in the Work Programme 2025 part for “Industry”. Please select from the work programme the destination relevant to your topic and take into account the description and expected impacts of that destination for the preparation of your proposal.

2025-12-06
The submission session is now available for: HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-52, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-64, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-37, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-65, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-66, HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-61, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-31, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-02, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-44, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-64, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-63, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-34, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-61, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-32, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-38, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-63, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-36, HORIZON-CL4-INDUSTRY-2025-01-DIGITAL-62, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-31, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-05, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-61, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-39, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-01, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-62, HORIZON-CL4-INDUSTRY-2025-01-MATERIALS-45, HORIZON-CL4-INDUSTRY-2025-01-TWIN-TRANSITION-33, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-60, HORIZON-CL4-INDUSTRY-2025-01-HUMAN-62
call topic details
Call status: Closed
Publication date: 2025-05-22 (6 months ago)
Opening date: 2025-05-22 (6 months ago)
Closing date: 2025-09-23 (2 months ago)
Procedure: single-stage

Budget: 25,000,000
Expected grants: 3
Contribution: 5,000,000 - 9,000,000
News flashes

This call topic has been appended 4 times by the EC with news.

  • 2025-12-06
    call update: proposal numberscall horizo...
  • 2025-12-06
    reminder on proposal part b page limit a...
  • 2025-12-06
    please note that due to a technical issu...
  • 2025-12-06
    the submission session is now available...
Source information

Showing the latest information. Found 9 versions of this call topic in the F&T portal.

Information from

  • 2025-10-28_15-46-30
  • 2025-07-02_03-31-06
  • 2025-07-01_03-30-41
  • 2025-06-27_03-30-42
  • 2025-06-21_03-30-38
  • 2025-06-16_03-30-31
  • 2025-06-11_03-30-20
  • 2025-05-22_03-30-15
  • 2025-05-15_03-30-19

Check the differences between the versions.

Annotations (will be publicly visible when approved)

You must be logged in to add annotations
No annotations yet

Events

This is just a very first implementation, better visualisation coming

Horizon Europe info days - Cluster 4

2025-05-13 -> 2025-05-14

online

This event aims to inform potential applicants about the funding opportunities within the Work Programme 2025 of the Horizon Europe Cluster 4 'Digital, Industry and Space'.

Horizon Europe - Industry 2025 Brokerage event

2025-05-14 -> 2025-09-23

online

NCP4Industry, the network of Cluster 4 - Industry National Contact Points and the Enterprise Europe Network are organising a brokerage event with pre-arranged online Face2Face meetings complementing the European Commission's Horizon Europe Information Day on Cluster 4 - Digital, Industry & Space with a 2025 deadline.

Events are added by the ideal-ist NCP community and are hand-picked. If you would like to suggest an event, please contact idealist@ffg.at.

Call topic timeline

What phase of the topic timeline are we in? This timeline contains some suggestions on what are realistic actions you should or could take at this moment. The timeline is based on the information provided by the call topic.
  1. Work programme available

    - 8 months ago

    The call topics are published first in the Work Programme, which is available a while before the call opens. By following up the Work Programme publications, you can get a headstart.

  2. Publication date

    - 6 months ago

    The call was published on the Funding & Tenders Portal.

  3. Opening date

    - 6 months ago

    The call opened for submissions.

  4. Closing date

    - 2 months ago

    Deadline for submitting a project.

  5. Today

  6. Time to inform applicants Estimate

    - 2 months from now

    The maximum time to inform applicants (TTI) of the outcome of the evaluation is five months from the call closure date.

  7. Sign grant agreement Estimate

    - 5 months from now

    The maximum time to sign grant agreements (TTG) is three months from the date of informing applicants.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Bubbles

This call topic is part of: