PV integration in buildings and in infrastructure
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Photovoltaic products are considered to be building-integrated, if they have been designed following the basic requirements for construction works in order to form and/or replace a construction product. If the integrated PV product is dismounted, it would have to be replaced by an appropriate conventional construction product. Building and infrastructure integrated PV can be a cost-effective, technologically proven solution to decarbonise buildings and infrastructure.
Consequently, project results are expected to contribute to all of the following expected outcomes:
- Demonstrate economic and sustainable integration of PV products in the built environment and in infrastructure.
- Establish enhanced structural collaborative innovation between PV companies and the (building) construction sector.
- Contribute to the Renovation Wave, the Mission on climate-neutral and smart Cities and the New European Bauhaus initiative.
Scope:
PV integration in buildings and in infrastructure unlocks a huge potential for renewable electricity generation. Integrated PV require individual solutions in order to meet multi-functional and aesthetic requirements such as yield-friendly colouring or modular transparency, antifouling property, structural flexibility, module lightness and flexibility, suited voltage levels, the use of and combination with (building) materials other than glass, and an overall high aesthetical value that addresses the requirements of architects and designers.
Proposals are expected to:
- Demonstrate resilience against partial shading, flexibility in the interconnection of PV modules having different sizes and electrical characteristics specific optical and thermal control solutions, long service life/easy replacement, safety and simplicity of maintenance, software control for quick detection of faults, module substructures and fixing systems to enhance aesthetics and functionality of the integration and electricity yield.
- Decrease costs and enhance lifetime, quality, reliability and sustainability with new approaches for both PV module and BOS with the development of industrialized production of customized products and of prefabricated modular solutions, which incorporate an integrated life cycle approach.
- Develop energy integration and social behaviour concepts to maximize the energy matching between PV production and local buildings consumption, supported by new tools and business models to ensure their economic effectiveness.
- Demonstrate integration of PV design and manufacturing within the construction value chain with appropriate consideration to standards for buildings and infrastructure, as well as contribution to new and improved standards.
- Form alliances between all stakeholders (PV and building/construction sectors, distribution system operators, investors, owners, architects, installers) to tackle a number of educational and regulatory barriers that still hinder the development of integrated PV in buildings and in infrastructure. The goal is to promote new concepts/schemes and business models for an active role of integrated PV in renovation and construction.
Demonstrations are expected to be carried out in more than one different construction typologies (residential buildings, tertiary building [hospitals, schools, public administration buildings, etc.]), or civil infrastructures (roadways, noise barriers, parking lots, bridges, etc.) and in more than one location in Europe.
A plan for the exploitation and dissemination of results should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plan should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).
Projects are expected to contribute to the New European Bauhaus (NEB) initiative[1] by interacting with the NEB Community, NEBLab and other relevant actions of the NEB initiative through sharing information, best practice, and, where relevant, results.
null
Activities are expected to achieve TRL 7 by the end of the project – see General Annex B.
[1] https://europa.eu/new-european-bauhaus/index_en
News flashes
The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2023-D3-01-01 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-02 (IA): 13 proposals
HORIZON-CL5-2023-D3-01-03 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-04 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-05 (RIA): 26 proposals
HORIZON-CL5-2023-D3-01-06 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-07 (IA): 1 proposal
HORIZON-CL5-2023-D3-01-08 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-09 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-10 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-11 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-12 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-13 (RIA): 15 proposals
HORIZON-CL5-2023-D3-01-14 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-15 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-16 (CSA): 1 proposal
HORIZON-CL5-2023-D3-01-17 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals
The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2023-D3-01-01 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-02 (IA): 13 proposals
HORIZON-CL5-2023-D3-01-03 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-04 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-05 (RIA): 26 proposals
HORIZON-CL5-2023-D3-01-06 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-07 (IA): 1 proposal
HORIZON-CL5-2023-D3-01-08 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-09 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-10 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-11 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-12 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-13 (RIA): 15 proposals
HORIZON-CL5-2023-D3-01-14 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-15 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-16 (CSA): 1 proposal
HORIZON-CL5-2023-D3-01-17 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals
Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).
[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]
Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).
[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]
Opening date: 2022-12-13 (3 years ago)
Closing date: 2023-03-30 (3 years ago)
Procedure: single-stage
Budget: 16,000,000
Expected grants: 2
Contribution: 8,000,000 - 8,000,000
This call topic has been appended 6 times by the EC with news.
-
2023-04-04
the call for proposals horizon-cl5-2023-... -
2023-04-04
the call for proposals horizon-cl5-2023-... -
2023-03-02
following the council implementing... -
2023-03-02
following the council implementing... -
2022-12-13
the submission session is now available... -
2022-12-13
the submission session is now available...
HORIZON-CL5-2023-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 17 other topics in this call:
- HORIZON-CL5-2023-D3-01-01
- HORIZON-CL5-2023-D3-01-03
- HORIZON-CL5-2023-D3-01-04
- HORIZON-CL5-2023-D3-01-05
- HORIZON-CL5-2023-D3-01-06
- HORIZON-CL5-2023-D3-01-07
- HORIZON-CL5-2023-D3-01-08
- HORIZON-CL5-2023-D3-01-09
- HORIZON-CL5-2023-D3-01-10
- HORIZON-CL5-2023-D3-01-11
- HORIZON-CL5-2023-D3-01-12
- HORIZON-CL5-2023-D3-01-13
- HORIZON-CL5-2023-D3-01-14
- HORIZON-CL5-2023-D3-01-15
- HORIZON-CL5-2023-D3-01-16
- HORIZON-CL5-2023-D3-01-17
- HORIZON-CL5-2023-D3-01-18
Showing the latest information. Found 149 versions of this call topic in the F&T portal.
Information from
- 2026-10-21_05-44-32
- 2026-10-19_05-22-53
- 2026-10-18_05-39-31
- 2026-10-18_05-16-11
- 2026-10-16_05-35-07
- 2026-10-16_05-12-33
- 2026-10-15_05-39-30
- 2026-10-15_05-15-05
- 2026-10-14_05-35-04
- 2026-10-14_05-10-59
- 2026-10-13_05-38-31
- 2026-10-13_05-13-53
- 2026-10-12_08-33-50
- 2026-10-12_08-09-28
- 2026-10-11_08-32-32
- 2026-10-11_08-08-39
- 2026-10-10_08-35-26
- 2026-10-10_08-11-06
- 2026-10-09_08-31-59
- 2026-10-09_08-08-08
- 2026-10-08_08-35-34
- 2026-10-08_08-10-44
- 2026-10-07_08-30-45
- 2026-10-07_08-06-12
- 2026-10-06_08-32-46
- 2026-10-06_08-08-53
- 2026-10-05_08-28-34
- 2026-10-05_08-05-23
- 2026-10-04_08-29-41
- 2026-10-04_08-06-43
- 2026-10-03_08-28-30
- 2026-10-03_08-05-15
- 2026-09-02_08-47-06
- 2026-09-02_08-21-24
- 2026-09-01_08-47-24
- 2026-09-01_08-46-18
- 2026-08-31_08-50-31
- 2026-08-31_08-50-01
- 2026-08-25_08-41-33
- 2026-08-25_08-17-06
- 2026-08-24_08-37-36
- 2026-08-24_08-36-37
- 2026-08-23_08-34-33
- 2026-08-23_08-34-04
- 2026-08-22_08-36-18
- 2026-08-22_08-11-20
- 2026-08-21_08-29-56
- 2026-08-21_08-29-23
- 2026-08-20_08-35-13
- 2026-08-20_08-10-22
- 2026-08-19_08-33-19
- 2026-08-19_08-32-51
- 2026-08-18_08-28-32
- 2026-08-18_08-04-39
- 2026-08-17_08-29-42
- 2026-08-17_08-05-22
- 2026-08-16_08-24-21
- 2026-08-16_08-01-15
- 2026-08-15_08-39-29
- 2026-08-15_08-02-53
- 2026-08-14_08-27-45
- 2026-08-14_08-03-18
- 2026-08-13_08-24-19
- 2026-08-13_08-02-19
- 2026-08-11_08-25-50
- 2026-08-11_08-02-10
- 2026-08-10_08-22-58
- 2026-08-10_07-58-00
- 2026-08-09_08-21-21
- 2026-08-09_07-58-19
- 2026-08-08_08-19-42
- 2026-08-08_07-57-29
- 2026-08-07_08-18-52
- 2026-08-07_07-55-34
- 2026-08-05_08-21-22
- 2026-08-05_07-58-23
- 2026-08-04_08-21-26
- 2026-08-04_08-20-31
- 2026-08-03_08-19-03
- 2026-08-03_07-56-08
- 2026-07-31_08-17-14
- 2026-07-31_08-16-49
- 2026-07-29_08-18-01
- 2026-07-29_07-55-07
- 2026-07-28_08-17-14
- 2026-07-28_07-54-51
- 2026-07-27_08-11-17
- 2026-07-27_07-50-22
- 2026-07-26_08-09-25
- 2026-07-26_07-48-27
- 2026-07-25_08-09-52
- 2026-07-25_07-48-54
- 2026-07-24_08-10-17
- 2026-07-24_08-09-52
- 2026-07-23_08-10-07
- 2026-07-23_08-09-31
- 2026-07-22_08-11-35
- 2026-07-22_08-11-09
- 2026-07-21_08-08-39
- 2026-07-21_07-47-25
- 2026-07-20_08-08-32
- 2026-07-20_07-47-28
- 2026-07-19_08-09-25
- 2026-07-19_07-47-50
- 2026-07-17_08-08-37
- 2026-07-17_07-46-41
- 2026-07-15_07-48-26
- 2026-07-15_07-47-45
- 2026-07-14_07-47-07
- 2026-07-14_07-30-59
- 2026-07-13_07-47-43
- 2026-07-13_07-31-44
- 2026-07-12_07-47-13
- 2026-07-12_07-46-55
- 2026-07-11_07-45-48
- 2026-07-11_07-30-42
- 2026-07-10_07-45-58
- 2026-07-10_07-45-42
- 2026-07-09_07-46-00
- 2026-07-09_07-30-24
- 2026-07-08_07-45-50
- 2026-07-08_07-45-29
- 2026-07-06_07-46-05
- 2026-07-06_07-30-13
- 2026-07-05_07-42-33
- 2026-07-05_07-41-58
- 2026-07-04_07-43-46
- 2026-07-04_07-28-47
- 2026-07-03_07-44-05
- 2026-07-03_07-43-23
- 2026-07-02_07-42-49
- 2026-07-02_07-27-36
- 2026-07-01_08-08-51
- 2026-07-01_07-44-06
- 2026-06-30_09-49-08
- 2026-06-30_08-04-59
- 2026-06-29_11-34-57
- 2026-06-29_08-08-29
- 2026-06-28_09-31-53
- 2026-06-28_08-01-33
- 2026-06-27_09-32-26
- 2026-06-27_08-02-03
- 2026-06-27_07-40-06
- 2026-02-18_06-59-58
- 2025-06-07_03-33-40
- 2024-11-23_03-30-56
- 2024-09-30_21-22-12
- 2024-07-04_15-01-33
- 2024-03-30_14-17-55
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
13 Dec 2022
Call closes
30 Mar 2023
Outcome expected
30 Aug 2023 · est.
Grant agreement signed
30 Nov 2023 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
13 Dec 2022 · 3 years ago
Submissions can be made from this date.
-
Call closes
30 Mar 2023 · 3 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
30 Aug 2023 · 3 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
30 Nov 2023 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.