Closed HORIZON-CL5-2023-D3-01-11 HORIZON

Demonstration of DC powered data centres, buildings, industries and ports

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all the following outcomes:

  • Demonstrated benefits and efficiency of DC power distribution systems compared to AC (no need of AC/DC conversion, less copper, less space occupancy, etc.).
  • Increased reliability and resilience of the grid provided by DC power distribution networks.

Scope:

Projects are expected to implement the activities in (1), the practical demonstration in (2) and the recommendations in (3) as described below:

1. Development of R&I activities, methodologies and tools for at least two of the sub-topics (A, B, C or D). These can be developed/complemented among them and/or with others pertinent to each sub-topic:

A. DC powered data centre:

  • Design and demonstration of a DC powered data centre. Feasibility of Medium Voltage Direct Current (MVDC) distribution network to supply the DC powered data centre as well as to supply other DC loads and to collect the energy of DC sources.
  • Integration with the UPS systems, innovative generation, sustainable (hybrid) energy storage, etc.
  • Renewable energy systems integration.
  • Cost Benefit Analysis of the savings compared with the standard AC powered data centre.
  • As a supporting reference for data centres, The EU Code of Conduct Data Centres Energy Efficiency can be used.

B. Application of DC distribution in commercial and residential buildings

  • Feasibility of Medium Voltage Direct Current (MVDC) distribution network to supply the DC powered commercial and residential buildings as well as to supply other DC loads and to collect the energy of DC sources.
  • Installation of intelligent DC system complete of all the related components (e.g., RES, DC bus, sockets, LED lighting, heat pumps, EV charging stations, sustainable storage systems, etc. The components can be either DC-based or AC-based and appropriately adapted to work within the DC grid.
  • Identification of the efficiency of a DC system compared to an AC system in the building sector and the corresponding cost savings.
  • Analysis and identification of the main barriers (technical and non-technical) for the development and deployment of MVDC and LVDC systems.

C. Application of DC distribution in industry

  • Development and demonstration of DC manufacturing process installation, protection and device technologies. Feasibility of Medium Voltage Direct Current (MVDC) distribution network to supply the DC powered industry as well as to supply other DC loads and to collect the energy of DC sources.
  • Development of project management tools and methods.
  • Demonstration of increased energy efficiency measures such as, for example the use of variable-speed motors, led lighting, storage systems, etc.
  • Investigations to enable selectivity between circuit protection devices using different technologies, such as semiconductor breakers, hybrid semiconductor breakers, mechanical breakers and fuses.
  • Systems grounding to avoid stray currents and corrosion phenomenon from DC systems such as e.g., rail applications.
  • Insulation materials and their applicability for DC loads (investigation on suitability of AC cables for DC, on polarisation effects leading to early degradation and subsequent insulation failure, etc.).

D. Application of DC distribution in ports

  • Simulation, analysis, design, develop, test and demonstration of a DC port infrastructure. Feasibility of Medium Voltage Direct Current (MVDC) distribution network to supply the DC powered ports as well as to supply other DC loads and to collect the energy of DC sources.
  • Study and development of a tool to estimate the quantity of DC charging infrastructure necessary to support regional adoption of ports’ electrification by MS.
  • CBA at system level of a DC compared to an AC supplied port considering all the elements contributing to a real effective analysis on the costs and benefits of the system.
  • Simulation, analysis, design, test and demonstration of all the IT needed for the grid automation.
  • Analysis and definition of possible operating framework and business models for ports acting as energy hubs.
  • Analysis, report and recommendations on the potential of the ports as energy hubs with related planning for its development within the energy transition.

2. Demonstration, test and validation of at least two of the sub-topics developed in (1) (A, B, C or D) in at least two pilots in different EU Member States/Associated Countries.

3. Identification of standardisation, regulatory barriers and related recommendations.

null

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B.

News flashes

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
call topic details
Call status: Closed
Opening date: 2022-12-13 (3 years ago)
Closing date: 2023-03-30 (3 years ago)
Procedure: single-stage

Budget: 18,000,000
Expected grants: 2
Contribution: 9,000,000 - 9,000,000
News flashes

This call topic has been appended 6 times by the EC with news.

  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-03-02
    following the council implementing...
  • 2023-03-02
    following the council implementing...
  • 2022-12-13
    the submission session is now available...
  • 2022-12-13
    the submission session is now available...
Source information

Showing the latest information. Found 241 versions of this call topic in the F&T portal.

Information from

  • 2026-10-24_05-43-46
  • 2026-10-24_05-41-04
  • 2026-10-23_05-45-20
  • 2026-10-23_05-42-28
  • 2026-10-22_05-50-39
  • 2026-10-22_05-47-52
  • 2026-10-21_05-45-35
  • 2026-10-21_05-43-15
  • 2026-10-20_05-45-02
  • 2026-10-20_05-42-25
  • 2026-10-19_05-48-54
  • 2026-10-19_05-46-18
  • 2026-10-18_05-41-41
  • 2026-10-18_05-39-06
  • 2026-10-17_05-42-14
  • 2026-10-17_05-39-40
  • 2026-10-16_05-36-19
  • 2026-10-16_05-34-40
  • 2026-10-15_05-39-57
  • 2026-10-15_05-38-00
  • 2026-10-14_05-34-33
  • 2026-10-14_05-33-07
  • 2026-10-13_05-38-04
  • 2026-10-13_05-36-26
  • 2026-10-12_08-33-22
  • 2026-10-12_08-31-47
  • 2026-10-11_08-33-03
  • 2026-10-11_08-30-49
  • 2026-10-10_08-35-58
  • 2026-10-10_08-33-53
  • 2026-10-09_08-32-33
  • 2026-10-09_08-30-11
  • 2026-10-08_08-35-03
  • 2026-10-08_08-33-29
  • 2026-10-07_08-31-16
  • 2026-10-07_08-29-09
  • 2026-10-06_08-32-14
  • 2026-10-06_08-30-49
  • 2026-10-05_08-29-09
  • 2026-10-05_08-26-56
  • 2026-10-04_08-30-05
  • 2026-10-04_08-28-08
  • 2026-10-03_08-28-05
  • 2026-10-03_08-26-41
  • 2026-10-02_08-29-59
  • 2026-10-02_08-28-04
  • 2026-10-01_08-32-21
  • 2026-10-01_08-30-21
  • 2026-09-29_09-07-05
  • 2026-09-29_09-04-38
  • 2026-09-28_09-06-29
  • 2026-09-28_09-03-57
  • 2026-09-27_09-06-05
  • 2026-09-27_09-03-40
  • 2026-09-26_09-02-16
  • 2026-09-26_08-59-56
  • 2026-09-25_09-03-11
  • 2026-09-25_09-00-49
  • 2026-09-24_09-06-44
  • 2026-09-24_09-04-29
  • 2026-09-23_09-00-35
  • 2026-09-23_08-58-19
  • 2026-09-22_09-01-11
  • 2026-09-22_08-58-50
  • 2026-09-21_08-57-04
  • 2026-09-21_08-54-54
  • 2026-09-20_08-58-29
  • 2026-09-20_08-55-56
  • 2026-09-19_08-54-38
  • 2026-09-19_08-52-23
  • 2026-09-18_09-00-51
  • 2026-09-18_08-58-16
  • 2026-09-17_08-55-36
  • 2026-09-17_08-53-11
  • 2026-09-16_08-53-06
  • 2026-09-16_08-50-56
  • 2026-09-15_08-55-22
  • 2026-09-15_08-53-07
  • 2026-09-14_08-54-23
  • 2026-09-14_08-52-02
  • 2026-09-13_08-52-41
  • 2026-09-13_08-50-23
  • 2026-09-12_08-56-04
  • 2026-09-12_08-53-45
  • 2026-09-11_08-54-48
  • 2026-09-11_08-52-32
  • 2026-09-10_08-53-45
  • 2026-09-10_08-51-40
  • 2026-09-09_08-54-51
  • 2026-09-09_08-52-27
  • 2026-09-08_08-52-01
  • 2026-09-08_08-49-37
  • 2026-09-07_08-52-11
  • 2026-09-07_08-50-00
  • 2026-09-06_08-50-42
  • 2026-09-06_08-48-33
  • 2026-09-05_08-48-55
  • 2026-09-05_08-46-43
  • 2026-09-04_08-47-33
  • 2026-09-04_08-45-13
  • 2026-09-03_08-47-21
  • 2026-09-03_08-45-18
  • 2026-09-02_08-47-43
  • 2026-09-02_08-46-37
  • 2026-09-01_08-48-30
  • 2026-09-01_08-46-19
  • 2026-08-31_08-51-02
  • 2026-08-31_08-50-00
  • 2026-08-30_08-40-15
  • 2026-08-30_08-39-16
  • 2026-08-29_08-43-08
  • 2026-08-29_08-42-07
  • 2026-08-28_08-48-36
  • 2026-08-28_08-46-23
  • 2026-08-27_08-37-09
  • 2026-08-27_08-34-51
  • 2026-08-25_08-42-07
  • 2026-08-25_08-41-09
  • 2026-08-24_08-38-47
  • 2026-08-24_08-36-38
  • 2026-08-23_08-35-05
  • 2026-08-23_08-34-06
  • 2026-08-22_08-37-30
  • 2026-08-22_08-35-22
  • 2026-08-21_08-30-23
  • 2026-08-21_08-29-24
  • 2026-08-20_08-36-20
  • 2026-08-20_08-34-17
  • 2026-08-19_08-33-50
  • 2026-08-19_08-32-56
  • 2026-08-18_08-29-45
  • 2026-08-18_08-27-30
  • 2026-08-17_08-30-10
  • 2026-08-17_08-29-11
  • 2026-08-16_08-24-42
  • 2026-08-16_08-23-46
  • 2026-08-14_08-28-12
  • 2026-08-14_08-27-17
  • 2026-08-13_08-24-46
  • 2026-08-13_08-23-51
  • 2026-08-12_08-24-03
  • 2026-08-12_08-23-07
  • 2026-08-11_08-26-20
  • 2026-08-11_08-25-18
  • 2026-08-10_08-23-20
  • 2026-08-10_08-22-36
  • 2026-08-09_08-21-56
  • 2026-08-09_08-20-55
  • 2026-08-08_08-20-42
  • 2026-08-08_08-18-45
  • 2026-08-07_08-19-57
  • 2026-08-07_08-18-02
  • 2026-08-06_08-19-36
  • 2026-08-06_08-18-41
  • 2026-08-05_08-22-36
  • 2026-08-05_08-20-24
  • 2026-08-04_08-22-35
  • 2026-08-04_08-20-32
  • 2026-08-03_08-19-35
  • 2026-08-03_08-18-35
  • 2026-08-02_08-18-50
  • 2026-08-02_08-16-47
  • 2026-08-01_08-20-31
  • 2026-08-01_08-18-26
  • 2026-07-31_08-17-44
  • 2026-07-31_08-16-48
  • 2026-07-30_08-17-19
  • 2026-07-30_08-15-15
  • 2026-07-29_08-19-10
  • 2026-07-29_08-17-07
  • 2026-07-28_08-18-27
  • 2026-07-28_08-16-21
  • 2026-07-27_08-11-54
  • 2026-07-27_08-10-59
  • 2026-07-26_08-10-30
  • 2026-07-26_08-08-34
  • 2026-07-25_08-11-03
  • 2026-07-25_08-09-01
  • 2026-07-24_08-10-41
  • 2026-07-24_08-09-50
  • 2026-07-23_08-10-30
  • 2026-07-23_08-09-34
  • 2026-07-22_08-12-01
  • 2026-07-22_08-11-08
  • 2026-07-21_08-09-50
  • 2026-07-21_08-07-42
  • 2026-07-20_08-09-01
  • 2026-07-20_08-08-06
  • 2026-07-19_08-10-28
  • 2026-07-19_08-08-40
  • 2026-07-18_08-10-22
  • 2026-07-18_08-08-21
  • 2026-07-17_08-09-41
  • 2026-07-17_08-07-40
  • 2026-07-16_07-48-45
  • 2026-07-16_07-48-02
  • 2026-07-15_07-49-16
  • 2026-07-15_07-47-46
  • 2026-07-14_07-47-54
  • 2026-07-14_07-46-26
  • 2026-07-13_07-48-06
  • 2026-07-13_07-47-25
  • 2026-07-12_07-47-35
  • 2026-07-12_07-46-54
  • 2026-07-11_07-46-11
  • 2026-07-11_07-45-30
  • 2026-07-10_07-46-16
  • 2026-07-10_07-45-40
  • 2026-07-09_07-46-24
  • 2026-07-09_07-45-41
  • 2026-07-08_07-46-11
  • 2026-07-08_07-45-32
  • 2026-07-07_07-46-29
  • 2026-07-07_07-45-07
  • 2026-07-06_07-46-24
  • 2026-07-06_07-45-50
  • 2026-07-05_07-43-14
  • 2026-07-05_07-42-00
  • 2026-07-04_07-44-04
  • 2026-07-04_07-43-30
  • 2026-07-03_07-44-48
  • 2026-07-03_07-43-31
  • 2026-07-02_07-43-39
  • 2026-07-02_07-42-17
  • 2026-07-01_08-10-01
  • 2026-07-01_08-08-43
  • 2026-06-30_09-49-33
  • 2026-06-30_08-06-03
  • 2026-06-29_11-35-23
  • 2026-06-29_08-09-33
  • 2026-06-28_09-32-36
  • 2026-06-28_08-02-23
  • 2026-06-27_09-33-17
  • 2026-06-27_08-02-50
  • 2026-06-27_08-01-52
  • 2026-02-18_07-05-22
  • 2025-06-07_03-33-40
  • 2024-11-23_03-30-55
  • 2024-09-30_21-22-11
  • 2024-07-04_15-01-33
  • 2024-03-30_14-17-57

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

13 Dec 2022

Call closes

30 Mar 2023

Outcome expected

30 Aug 2023 · est.

Grant agreement signed

30 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    13 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    30 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    30 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    30 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal