Critical technologies for the offshore wind farm of the Future
Call text (as on F&T portal)
View on F&T portalExpected Outcome:
Project results are expected to contribute to all of the following expected outcomes:
- Improved performance of offshore wind turbines and efficient use of the marine space.
- Reinforced European offshore wind turbine value chain, supporting local companies and creating local jobs and skills.
- Reduce the possible impacts of offshore wind turbines on protected species and habitats.
- Reduced use of primary raw materials and reduced dependency on scarce raw materials.
- Reduction of LCOE and increased sustainability.
Scope:
The objective is to bring major innovations in the design and manufacturing of large offshore wind farms, aiming at >15 MW for fixed bottom offshore applications and >12 MW for floating offshore installations.
Attention can be paid to substantially reducing the wind turbine mass (rotor/nacelle/tower) as well as on advanced lean marine-compatible substructures, advanced (dynamic) cabling and connectors, including floating platforms and its moorings. Innovations such as compact generators, smart blades, reliable drive trains, can be investigated alongside new turbine designs. Innovative low-cost substructures with suitable geotechnical and hydro-dynamic properties should be developed using long-lasting, anti-fouling, corrosion resistant materials with high damping properties.
The projects should exploit improved understanding of the issues related to materials in the upscaling of wind energy turbines/systems (stresses and strains, delamination, etc.)
The innovations should contribute to sustainability considering circularity in the design phase, less (or no) use of (critical) raw materials and decreasing negative environmental and social impacts. They should also contribute to the mitigation of the possible impacts to protected species and habitats.
Such development will allow further deployment of offshore wind energy conversion systems and dramatically increase the offshore wind potential while reducing public acceptability barriers (noise, visual impact).
The active participation of relevant industrial partners and technology suppliers is essential to form a multisectoral, multidisciplinary consortium able to achieve the full impact of the project.
This R&I need is identified in the offshore renewable energy strategy (COM(2020) 741 final) that describes that further R&I action is needed in critical raw material substitution, reducing the environmental impacts of offshore technologies, and job creation.
null
Activities are expected to achieve TRL 5 by the end of the project – see General Annex B.
News flashes
The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2023-D3-01-01 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-02 (IA): 13 proposals
HORIZON-CL5-2023-D3-01-03 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-04 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-05 (RIA): 26 proposals
HORIZON-CL5-2023-D3-01-06 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-07 (IA): 1 proposal
HORIZON-CL5-2023-D3-01-08 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-09 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-10 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-11 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-12 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-13 (RIA): 15 proposals
HORIZON-CL5-2023-D3-01-14 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-15 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-16 (CSA): 1 proposal
HORIZON-CL5-2023-D3-01-17 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals
The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:
HORIZON-CL5-2023-D3-01-01 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-02 (IA): 13 proposals
HORIZON-CL5-2023-D3-01-03 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-04 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-05 (RIA): 26 proposals
HORIZON-CL5-2023-D3-01-06 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-07 (IA): 1 proposal
HORIZON-CL5-2023-D3-01-08 (IA): 9 proposals
HORIZON-CL5-2023-D3-01-09 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-10 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-11 (IA): 7 proposals
HORIZON-CL5-2023-D3-01-12 (IA): 3 proposals
HORIZON-CL5-2023-D3-01-13 (RIA): 15 proposals
HORIZON-CL5-2023-D3-01-14 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-15 (IA): 4 proposals
HORIZON-CL5-2023-D3-01-16 (CSA): 1 proposal
HORIZON-CL5-2023-D3-01-17 (IA): 5 proposals
HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals
Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).
[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]
Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.
Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).
[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]
Opening date: 2022-12-13 (3 years ago)
Closing date: 2023-03-30 (3 years ago)
Procedure: single-stage
Budget: 18,000,000
Expected grants: 3
Contribution: 6,000,000 - 6,000,000
This call topic has been appended 6 times by the EC with news.
-
2023-04-04
the call for proposals horizon-cl5-2023-... -
2023-04-04
the call for proposals horizon-cl5-2023-... -
2023-03-02
following the council implementing... -
2023-03-02
following the council implementing... -
2022-12-13
the submission session is now available... -
2022-12-13
the submission session is now available...
HORIZON-CL5-2023-D3-01
Call topics are often grouped together in a call. Sometimes this is for a thematic reason, but often it is also for practical reasons.
There are 17 other topics in this call:
- HORIZON-CL5-2023-D3-01-01
- HORIZON-CL5-2023-D3-01-02
- HORIZON-CL5-2023-D3-01-03
- HORIZON-CL5-2023-D3-01-04
- HORIZON-CL5-2023-D3-01-06
- HORIZON-CL5-2023-D3-01-07
- HORIZON-CL5-2023-D3-01-08
- HORIZON-CL5-2023-D3-01-09
- HORIZON-CL5-2023-D3-01-10
- HORIZON-CL5-2023-D3-01-11
- HORIZON-CL5-2023-D3-01-12
- HORIZON-CL5-2023-D3-01-13
- HORIZON-CL5-2023-D3-01-14
- HORIZON-CL5-2023-D3-01-15
- HORIZON-CL5-2023-D3-01-16
- HORIZON-CL5-2023-D3-01-17
- HORIZON-CL5-2023-D3-01-18
Showing the latest information. Found 241 versions of this call topic in the F&T portal.
Information from
- 2026-10-24_05-41-08
- 2026-10-24_05-40-52
- 2026-10-23_05-42-35
- 2026-10-23_05-42-15
- 2026-10-22_05-47-52
- 2026-10-22_05-47-28
- 2026-10-21_05-43-15
- 2026-10-21_05-42-48
- 2026-10-20_05-42-38
- 2026-10-20_05-42-05
- 2026-10-19_05-46-26
- 2026-10-19_05-46-01
- 2026-10-18_05-39-13
- 2026-10-18_05-38-55
- 2026-10-17_05-39-53
- 2026-10-17_05-39-24
- 2026-10-16_05-34-50
- 2026-10-16_05-34-29
- 2026-10-15_05-40-14
- 2026-10-15_05-37-59
- 2026-10-14_05-35-07
- 2026-10-14_05-33-05
- 2026-10-13_05-38-34
- 2026-10-13_05-36-25
- 2026-10-12_08-33-53
- 2026-10-12_08-31-45
- 2026-10-11_08-33-22
- 2026-10-11_08-30-47
- 2026-10-10_08-36-11
- 2026-10-10_08-33-52
- 2026-10-09_08-32-43
- 2026-10-09_08-30-08
- 2026-10-08_08-35-36
- 2026-10-08_08-33-27
- 2026-10-07_08-31-37
- 2026-10-07_08-29-09
- 2026-10-06_08-32-48
- 2026-10-06_08-30-46
- 2026-10-05_08-29-28
- 2026-10-05_08-26-53
- 2026-10-04_08-30-22
- 2026-10-04_08-28-07
- 2026-10-03_08-28-41
- 2026-10-03_08-26-38
- 2026-10-02_08-30-30
- 2026-10-02_08-27-58
- 2026-10-01_08-32-41
- 2026-10-01_08-30-16
- 2026-09-29_09-07-34
- 2026-09-29_09-04-28
- 2026-09-28_09-07-04
- 2026-09-28_09-03-53
- 2026-09-27_09-06-40
- 2026-09-27_09-03-30
- 2026-09-26_09-02-47
- 2026-09-26_08-59-44
- 2026-09-25_09-03-47
- 2026-09-25_09-00-37
- 2026-09-24_09-07-17
- 2026-09-24_09-04-18
- 2026-09-23_09-01-10
- 2026-09-23_08-58-11
- 2026-09-22_09-01-45
- 2026-09-22_08-58-38
- 2026-09-21_08-57-40
- 2026-09-21_08-54-39
- 2026-09-20_08-59-01
- 2026-09-20_08-55-46
- 2026-09-19_08-55-09
- 2026-09-19_08-52-17
- 2026-09-18_09-01-21
- 2026-09-18_08-58-08
- 2026-09-17_08-56-04
- 2026-09-17_08-53-02
- 2026-09-16_08-53-36
- 2026-09-16_08-50-46
- 2026-09-15_08-55-58
- 2026-09-15_08-52-54
- 2026-09-14_08-54-56
- 2026-09-14_08-51-55
- 2026-09-13_08-53-11
- 2026-09-13_08-50-13
- 2026-09-12_08-56-37
- 2026-09-12_08-53-36
- 2026-09-11_08-55-19
- 2026-09-11_08-52-26
- 2026-09-10_08-54-29
- 2026-09-10_08-51-34
- 2026-09-09_08-55-24
- 2026-09-09_08-52-19
- 2026-09-08_08-52-36
- 2026-09-08_08-49-29
- 2026-09-07_08-52-47
- 2026-09-07_08-49-50
- 2026-09-06_08-51-19
- 2026-09-06_08-48-28
- 2026-09-05_08-49-31
- 2026-09-05_08-46-36
- 2026-09-04_08-48-10
- 2026-09-04_08-45-03
- 2026-09-03_08-47-53
- 2026-09-03_08-45-07
- 2026-09-02_08-49-18
- 2026-09-02_08-46-26
- 2026-09-01_08-49-08
- 2026-09-01_08-46-14
- 2026-08-31_08-52-32
- 2026-08-31_08-49-49
- 2026-08-30_08-41-59
- 2026-08-30_08-39-04
- 2026-08-29_08-44-50
- 2026-08-29_08-42-00
- 2026-08-28_08-49-09
- 2026-08-28_08-46-12
- 2026-08-27_08-37-38
- 2026-08-27_08-34-43
- 2026-08-25_08-43-53
- 2026-08-25_08-40-58
- 2026-08-24_08-39-27
- 2026-08-24_08-36-31
- 2026-08-23_08-36-37
- 2026-08-23_08-33-58
- 2026-08-22_08-38-07
- 2026-08-22_08-35-06
- 2026-08-21_08-31-58
- 2026-08-21_08-29-19
- 2026-08-20_08-37-06
- 2026-08-20_08-34-06
- 2026-08-19_08-35-31
- 2026-08-19_08-32-45
- 2026-08-18_08-30-23
- 2026-08-18_08-27-19
- 2026-08-17_08-31-49
- 2026-08-17_08-29-03
- 2026-08-16_08-26-16
- 2026-08-16_08-23-40
- 2026-08-14_08-29-44
- 2026-08-14_08-27-01
- 2026-08-13_08-26-14
- 2026-08-13_08-23-41
- 2026-08-12_08-25-35
- 2026-08-12_08-23-00
- 2026-08-11_08-28-03
- 2026-08-11_08-25-10
- 2026-08-10_08-25-06
- 2026-08-10_08-22-24
- 2026-08-09_08-23-23
- 2026-08-09_08-20-46
- 2026-08-08_08-21-17
- 2026-08-08_08-18-38
- 2026-08-07_08-20-34
- 2026-08-07_08-18-01
- 2026-08-06_08-21-18
- 2026-08-06_08-18-31
- 2026-08-05_08-23-03
- 2026-08-05_08-20-13
- 2026-08-04_08-23-13
- 2026-08-04_08-20-23
- 2026-08-03_08-21-07
- 2026-08-03_08-18-28
- 2026-08-02_08-19-18
- 2026-08-02_08-16-39
- 2026-08-01_08-21-02
- 2026-08-01_08-18-12
- 2026-07-31_08-19-18
- 2026-07-31_08-16-40
- 2026-07-30_08-17-54
- 2026-07-30_08-15-09
- 2026-07-29_08-19-40
- 2026-07-29_08-17-02
- 2026-07-28_08-19-04
- 2026-07-28_08-16-09
- 2026-07-27_08-13-29
- 2026-07-27_08-10-50
- 2026-07-26_08-11-04
- 2026-07-26_08-08-22
- 2026-07-25_08-11-30
- 2026-07-25_08-08-57
- 2026-07-24_08-12-08
- 2026-07-24_08-09-37
- 2026-07-23_08-11-59
- 2026-07-23_08-09-26
- 2026-07-22_08-13-47
- 2026-07-22_08-11-05
- 2026-07-21_08-10-17
- 2026-07-21_08-07-37
- 2026-07-20_08-10-27
- 2026-07-20_08-07-57
- 2026-07-19_08-11-00
- 2026-07-19_08-08-29
- 2026-07-18_08-10-56
- 2026-07-18_08-08-12
- 2026-07-17_08-10-11
- 2026-07-17_08-07-31
- 2026-07-16_07-49-59
- 2026-07-16_07-47-55
- 2026-07-15_07-49-34
- 2026-07-15_07-47-40
- 2026-07-14_07-48-16
- 2026-07-14_07-46-22
- 2026-07-13_07-49-20
- 2026-07-13_07-47-18
- 2026-07-12_07-48-40
- 2026-07-12_07-46-48
- 2026-07-11_07-47-20
- 2026-07-11_07-45-24
- 2026-07-10_07-47-24
- 2026-07-10_07-45-33
- 2026-07-09_07-47-28
- 2026-07-09_07-45-35
- 2026-07-08_07-47-06
- 2026-07-08_07-45-26
- 2026-07-07_07-46-52
- 2026-07-07_07-44-56
- 2026-07-06_07-47-39
- 2026-07-06_07-45-45
- 2026-07-05_07-43-32
- 2026-07-05_07-41-56
- 2026-07-04_07-45-10
- 2026-07-04_07-43-26
- 2026-07-03_07-45-09
- 2026-07-03_07-43-13
- 2026-07-02_07-43-57
- 2026-07-02_07-42-12
- 2026-07-01_08-08-43
- 2026-07-01_08-08-33
- 2026-06-30_09-49-28
- 2026-06-30_08-04-58
- 2026-06-29_11-35-21
- 2026-06-29_08-08-29
- 2026-06-28_09-32-34
- 2026-06-28_08-01-34
- 2026-06-27_09-33-15
- 2026-06-27_08-01-51
- 2026-06-27_08-01-39
- 2026-02-18_07-05-22
- 2025-06-07_03-33-42
- 2024-11-23_03-30-56
- 2024-09-30_21-22-12
- 2024-07-04_15-01-33
- 2024-03-30_14-17-35
Check the differences between the versions.
Annotations
Events
Hand-picked events relevant to this call topic.
No events yet
There are currently no events linked to this call topic.
Timeline
Call published · 30 Sep 2024 (2 years ago)
All expected milestones for this call have passed.
Work programme published
07 Oct 2022 · est.
Call opens
13 Dec 2022
Call closes
30 Mar 2023
Outcome expected
30 Aug 2023 · est.
Grant agreement signed
30 Nov 2023 · est.
Call published
30 Sep 2024
-
Work programme published Estimated
07 Oct 2022 · 4 years ago
Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.
-
Call opens
13 Dec 2022 · 3 years ago
Submissions can be made from this date.
-
Call closes
30 Mar 2023 · 3 years ago
Deadline to submit a proposal.
-
Outcome expected Estimated
30 Aug 2023 · 3 years ago
The maximum time to inform applicants of the evaluation outcome is five months after the call closes.
-
Grant agreement signed Estimated
30 Nov 2023 · 2 years ago
The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.
-
Call published
30 Sep 2024 · 2 years ago
This topic was first published in TopicTree.
Funded Projects
Loading...
Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)
Ecosystem bubbles
This call topic is part of the following thematic bubbles.
Not part of a bubble yet
This call topic has not been grouped into an ecosystem bubble.