Closed HORIZON-CL5-2023-D3-01-05 HORIZON

Critical technologies for the offshore wind farm of the Future

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Improved performance of offshore wind turbines and efficient use of the marine space.
  • Reinforced European offshore wind turbine value chain, supporting local companies and creating local jobs and skills.
  • Reduce the possible impacts of offshore wind turbines on protected species and habitats.
  • Reduced use of primary raw materials and reduced dependency on scarce raw materials.
  • Reduction of LCOE and increased sustainability.

Scope:

The objective is to bring major innovations in the design and manufacturing of large offshore wind farms, aiming at >15 MW for fixed bottom offshore applications and >12 MW for floating offshore installations.

Attention can be paid to substantially reducing the wind turbine mass (rotor/nacelle/tower) as well as on advanced lean marine-compatible substructures, advanced (dynamic) cabling and connectors, including floating platforms and its moorings. Innovations such as compact generators, smart blades, reliable drive trains, can be investigated alongside new turbine designs. Innovative low-cost substructures with suitable geotechnical and hydro-dynamic properties should be developed using long-lasting, anti-fouling, corrosion resistant materials with high damping properties.

The projects should exploit improved understanding of the issues related to materials in the upscaling of wind energy turbines/systems (stresses and strains, delamination, etc.)

The innovations should contribute to sustainability considering circularity in the design phase, less (or no) use of (critical) raw materials and decreasing negative environmental and social impacts. They should also contribute to the mitigation of the possible impacts to protected species and habitats.

Such development will allow further deployment of offshore wind energy conversion systems and dramatically increase the offshore wind potential while reducing public acceptability barriers (noise, visual impact).

The active participation of relevant industrial partners and technology suppliers is essential to form a multisectoral, multidisciplinary consortium able to achieve the full impact of the project.

This R&I need is identified in the offshore renewable energy strategy (COM(2020) 741 final) that describes that further R&I action is needed in critical raw material substitution, reducing the environmental impacts of offshore technologies, and job creation.

null

Activities are expected to achieve TRL 5 by the end of the project – see General Annex B.

News flashes

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
call topic details
Call status: Closed
Opening date: 2022-12-13 (3 years ago)
Closing date: 2023-03-30 (3 years ago)
Procedure: single-stage

Budget: 18,000,000
Expected grants: 3
Contribution: 6,000,000 - 6,000,000
News flashes

This call topic has been appended 6 times by the EC with news.

  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-03-02
    following the council implementing...
  • 2023-03-02
    following the council implementing...
  • 2022-12-13
    the submission session is now available...
  • 2022-12-13
    the submission session is now available...
Source information

Showing the latest information. Found 241 versions of this call topic in the F&T portal.

Information from

  • 2026-10-24_05-41-08
  • 2026-10-24_05-40-52
  • 2026-10-23_05-42-35
  • 2026-10-23_05-42-15
  • 2026-10-22_05-47-52
  • 2026-10-22_05-47-28
  • 2026-10-21_05-43-15
  • 2026-10-21_05-42-48
  • 2026-10-20_05-42-38
  • 2026-10-20_05-42-05
  • 2026-10-19_05-46-26
  • 2026-10-19_05-46-01
  • 2026-10-18_05-39-13
  • 2026-10-18_05-38-55
  • 2026-10-17_05-39-53
  • 2026-10-17_05-39-24
  • 2026-10-16_05-34-50
  • 2026-10-16_05-34-29
  • 2026-10-15_05-40-14
  • 2026-10-15_05-37-59
  • 2026-10-14_05-35-07
  • 2026-10-14_05-33-05
  • 2026-10-13_05-38-34
  • 2026-10-13_05-36-25
  • 2026-10-12_08-33-53
  • 2026-10-12_08-31-45
  • 2026-10-11_08-33-22
  • 2026-10-11_08-30-47
  • 2026-10-10_08-36-11
  • 2026-10-10_08-33-52
  • 2026-10-09_08-32-43
  • 2026-10-09_08-30-08
  • 2026-10-08_08-35-36
  • 2026-10-08_08-33-27
  • 2026-10-07_08-31-37
  • 2026-10-07_08-29-09
  • 2026-10-06_08-32-48
  • 2026-10-06_08-30-46
  • 2026-10-05_08-29-28
  • 2026-10-05_08-26-53
  • 2026-10-04_08-30-22
  • 2026-10-04_08-28-07
  • 2026-10-03_08-28-41
  • 2026-10-03_08-26-38
  • 2026-10-02_08-30-30
  • 2026-10-02_08-27-58
  • 2026-10-01_08-32-41
  • 2026-10-01_08-30-16
  • 2026-09-29_09-07-34
  • 2026-09-29_09-04-28
  • 2026-09-28_09-07-04
  • 2026-09-28_09-03-53
  • 2026-09-27_09-06-40
  • 2026-09-27_09-03-30
  • 2026-09-26_09-02-47
  • 2026-09-26_08-59-44
  • 2026-09-25_09-03-47
  • 2026-09-25_09-00-37
  • 2026-09-24_09-07-17
  • 2026-09-24_09-04-18
  • 2026-09-23_09-01-10
  • 2026-09-23_08-58-11
  • 2026-09-22_09-01-45
  • 2026-09-22_08-58-38
  • 2026-09-21_08-57-40
  • 2026-09-21_08-54-39
  • 2026-09-20_08-59-01
  • 2026-09-20_08-55-46
  • 2026-09-19_08-55-09
  • 2026-09-19_08-52-17
  • 2026-09-18_09-01-21
  • 2026-09-18_08-58-08
  • 2026-09-17_08-56-04
  • 2026-09-17_08-53-02
  • 2026-09-16_08-53-36
  • 2026-09-16_08-50-46
  • 2026-09-15_08-55-58
  • 2026-09-15_08-52-54
  • 2026-09-14_08-54-56
  • 2026-09-14_08-51-55
  • 2026-09-13_08-53-11
  • 2026-09-13_08-50-13
  • 2026-09-12_08-56-37
  • 2026-09-12_08-53-36
  • 2026-09-11_08-55-19
  • 2026-09-11_08-52-26
  • 2026-09-10_08-54-29
  • 2026-09-10_08-51-34
  • 2026-09-09_08-55-24
  • 2026-09-09_08-52-19
  • 2026-09-08_08-52-36
  • 2026-09-08_08-49-29
  • 2026-09-07_08-52-47
  • 2026-09-07_08-49-50
  • 2026-09-06_08-51-19
  • 2026-09-06_08-48-28
  • 2026-09-05_08-49-31
  • 2026-09-05_08-46-36
  • 2026-09-04_08-48-10
  • 2026-09-04_08-45-03
  • 2026-09-03_08-47-53
  • 2026-09-03_08-45-07
  • 2026-09-02_08-49-18
  • 2026-09-02_08-46-26
  • 2026-09-01_08-49-08
  • 2026-09-01_08-46-14
  • 2026-08-31_08-52-32
  • 2026-08-31_08-49-49
  • 2026-08-30_08-41-59
  • 2026-08-30_08-39-04
  • 2026-08-29_08-44-50
  • 2026-08-29_08-42-00
  • 2026-08-28_08-49-09
  • 2026-08-28_08-46-12
  • 2026-08-27_08-37-38
  • 2026-08-27_08-34-43
  • 2026-08-25_08-43-53
  • 2026-08-25_08-40-58
  • 2026-08-24_08-39-27
  • 2026-08-24_08-36-31
  • 2026-08-23_08-36-37
  • 2026-08-23_08-33-58
  • 2026-08-22_08-38-07
  • 2026-08-22_08-35-06
  • 2026-08-21_08-31-58
  • 2026-08-21_08-29-19
  • 2026-08-20_08-37-06
  • 2026-08-20_08-34-06
  • 2026-08-19_08-35-31
  • 2026-08-19_08-32-45
  • 2026-08-18_08-30-23
  • 2026-08-18_08-27-19
  • 2026-08-17_08-31-49
  • 2026-08-17_08-29-03
  • 2026-08-16_08-26-16
  • 2026-08-16_08-23-40
  • 2026-08-14_08-29-44
  • 2026-08-14_08-27-01
  • 2026-08-13_08-26-14
  • 2026-08-13_08-23-41
  • 2026-08-12_08-25-35
  • 2026-08-12_08-23-00
  • 2026-08-11_08-28-03
  • 2026-08-11_08-25-10
  • 2026-08-10_08-25-06
  • 2026-08-10_08-22-24
  • 2026-08-09_08-23-23
  • 2026-08-09_08-20-46
  • 2026-08-08_08-21-17
  • 2026-08-08_08-18-38
  • 2026-08-07_08-20-34
  • 2026-08-07_08-18-01
  • 2026-08-06_08-21-18
  • 2026-08-06_08-18-31
  • 2026-08-05_08-23-03
  • 2026-08-05_08-20-13
  • 2026-08-04_08-23-13
  • 2026-08-04_08-20-23
  • 2026-08-03_08-21-07
  • 2026-08-03_08-18-28
  • 2026-08-02_08-19-18
  • 2026-08-02_08-16-39
  • 2026-08-01_08-21-02
  • 2026-08-01_08-18-12
  • 2026-07-31_08-19-18
  • 2026-07-31_08-16-40
  • 2026-07-30_08-17-54
  • 2026-07-30_08-15-09
  • 2026-07-29_08-19-40
  • 2026-07-29_08-17-02
  • 2026-07-28_08-19-04
  • 2026-07-28_08-16-09
  • 2026-07-27_08-13-29
  • 2026-07-27_08-10-50
  • 2026-07-26_08-11-04
  • 2026-07-26_08-08-22
  • 2026-07-25_08-11-30
  • 2026-07-25_08-08-57
  • 2026-07-24_08-12-08
  • 2026-07-24_08-09-37
  • 2026-07-23_08-11-59
  • 2026-07-23_08-09-26
  • 2026-07-22_08-13-47
  • 2026-07-22_08-11-05
  • 2026-07-21_08-10-17
  • 2026-07-21_08-07-37
  • 2026-07-20_08-10-27
  • 2026-07-20_08-07-57
  • 2026-07-19_08-11-00
  • 2026-07-19_08-08-29
  • 2026-07-18_08-10-56
  • 2026-07-18_08-08-12
  • 2026-07-17_08-10-11
  • 2026-07-17_08-07-31
  • 2026-07-16_07-49-59
  • 2026-07-16_07-47-55
  • 2026-07-15_07-49-34
  • 2026-07-15_07-47-40
  • 2026-07-14_07-48-16
  • 2026-07-14_07-46-22
  • 2026-07-13_07-49-20
  • 2026-07-13_07-47-18
  • 2026-07-12_07-48-40
  • 2026-07-12_07-46-48
  • 2026-07-11_07-47-20
  • 2026-07-11_07-45-24
  • 2026-07-10_07-47-24
  • 2026-07-10_07-45-33
  • 2026-07-09_07-47-28
  • 2026-07-09_07-45-35
  • 2026-07-08_07-47-06
  • 2026-07-08_07-45-26
  • 2026-07-07_07-46-52
  • 2026-07-07_07-44-56
  • 2026-07-06_07-47-39
  • 2026-07-06_07-45-45
  • 2026-07-05_07-43-32
  • 2026-07-05_07-41-56
  • 2026-07-04_07-45-10
  • 2026-07-04_07-43-26
  • 2026-07-03_07-45-09
  • 2026-07-03_07-43-13
  • 2026-07-02_07-43-57
  • 2026-07-02_07-42-12
  • 2026-07-01_08-08-43
  • 2026-07-01_08-08-33
  • 2026-06-30_09-49-28
  • 2026-06-30_08-04-58
  • 2026-06-29_11-35-21
  • 2026-06-29_08-08-29
  • 2026-06-28_09-32-34
  • 2026-06-28_08-01-34
  • 2026-06-27_09-33-15
  • 2026-06-27_08-01-51
  • 2026-06-27_08-01-39
  • 2026-02-18_07-05-22
  • 2025-06-07_03-33-42
  • 2024-11-23_03-30-56
  • 2024-09-30_21-22-12
  • 2024-07-04_15-01-33
  • 2024-03-30_14-17-35

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

13 Dec 2022

Call closes

30 Mar 2023

Outcome expected

30 Aug 2023 · est.

Grant agreement signed

30 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    13 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    30 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    30 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    30 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal