Closed HORIZON-CL5-2023-D3-01-10 HORIZON

Supporting the development of a digital twin to improve management, operations and resilience of the EU Electricity System in support to REPowerEU

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Increase the reliability of the energy system by enhancing flexibility and efficiency of the European electricity grid to make it ready for the needed drastic increase of the renewable energy share and more resilient to future shocks (such as cyber-attacks) through scenario analysis and modelling.
  • Improve management, maintenance and operations of the EU Electricity System.
  • Enhance dynamic monitoring of the energy system, to facilitate energy system integration, information flows, detect anomalies, forecasting demand and to address infrastructure bottlenecks.
  • Improve the data exchange between TSOs and DSOs and between network operators and the market players, leveraging data exchange from prosumers.
  • Creation of new services for companies and public authorities based on the digital twin.

Scope:

To deal with the rising complexity of the Energy System(s), and the impact of the fast-changing energy market reality on the energy system, a digital twin of the electricity grid is a key digital solution to support network operators and market players in performing a well-informed decision-making. It is key tool to accelerate the innovation cycle and to reduce the inertia of the energy sector when it comes to the integration of digital solutions in the energy system in order to make it more efficient, resilient and able to integrate higher shares of renewable energies. Digital transformation of the energy system is thus essential to meet the objectives of REPowerEU.

The project is expected to address all of the following:

  • Create, develop and test a Digital Twin of the Electricity Grid that covers dynamic monitoring, (smart) grid planning, secure operation, forecasting and scenario analysis.
  • It has to be modular, interoperable and implementable at different scales, integrating both (decentralised) supply and demand-side, taking into account all relevant energy data.
  • Promote new ways for energy companies, to share data and break the data-silos - simplifying the data maintenance and exchange process - through a dynamic monitoring of the whole system.
  • Synchronize data from various systems, including at least 5 TSO, 5 DSO and 5 market parties that are not related in terms of ownership and with varying levels of infrastructure maturity.
  • Standardize it into one multi-user platform via standards-based adapters/interfaces, compliant and integrated with the Common European Energy Data Space.
  • Use the Digital twin for multi-facetted resilience scenario analysis to investigate how the electricity grid responds to stimuli or shocks (e.g. RES integration, cyber-attacks) and what answers can be provided.
  • Test and pilot the applications of science and innovation in the energy sector (e.g. testing the combination of key digital technologies such as High Performance Computing, Big Data, AI, IoT and Cloud Computing) in order to foster the rapid development new services based on them [e.g. Load Balancing, Power Management, Consumer Services, Demand forecasting real time and interactive computing]. These new services should help to enhance the flexibility and resilience of the EU energy system.
  • Involve key organisations to ensure a European approach is required. In particular, ENTSO-E and DSO associations, as well as main stakeholders such as T&D Europe, Eurelectric, SmartEn, etc.

To ensure interoperability and integration into the grid and the federated European digital infrastructure, specific demonstrators will make use of operational end-to-end architectures, digital platforms and other data exchange infrastructure for the energy and cross-sector systems being developed under ongoing Horizon 2020, Horizon Europe as well as under other EU programs such as the Digital Europe Program and Connecting Europe Facility.

The selected projects are expected to contribute to the BRIDGE initiative[1], actively participate to its activities and allocate up to 2% of their budgets to that end. Additional contributions to the ‘Alliance for Internet of Things Innovation’ (AIOTI) and other relevant activities (e.g. clusters of digital projects and coordinating actions) might be considered, when relevant.

null

Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B.

[1] https://www.h2020-bridge.eu/

News flashes

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
call topic details
Call status: Closed
Opening date: 2022-12-13 (3 years ago)
Closing date: 2023-03-30 (3 years ago)
Procedure: single-stage

Budget: 20,000,000
Expected grants: 1
Contribution: 20,000,000 - 20,000,000
News flashes

This call topic has been appended 6 times by the EC with news.

  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-03-02
    following the council implementing...
  • 2023-03-02
    following the council implementing...
  • 2022-12-13
    the submission session is now available...
  • 2022-12-13
    the submission session is now available...
Source information

Showing the latest information. Found 237 versions of this call topic in the F&T portal.

Information from

  • 2026-10-24_05-42-39
  • 2026-10-24_05-41-03
  • 2026-10-23_05-44-06
  • 2026-10-23_05-42-26
  • 2026-10-22_05-49-30
  • 2026-10-22_05-47-47
  • 2026-10-21_05-44-42
  • 2026-10-19_05-46-20
  • 2026-10-18_05-39-25
  • 2026-10-18_05-39-07
  • 2026-10-17_05-39-59
  • 2026-10-17_05-39-35
  • 2026-10-16_05-35-02
  • 2026-10-16_05-34-41
  • 2026-10-15_05-39-52
  • 2026-10-15_05-38-01
  • 2026-10-14_05-35-42
  • 2026-10-14_05-33-04
  • 2026-10-13_05-39-10
  • 2026-10-13_05-36-24
  • 2026-10-12_08-34-28
  • 2026-10-12_08-31-44
  • 2026-10-11_08-32-57
  • 2026-10-11_08-30-46
  • 2026-10-10_08-35-49
  • 2026-10-10_08-33-53
  • 2026-10-09_08-32-23
  • 2026-10-09_08-30-07
  • 2026-10-08_08-36-14
  • 2026-10-08_08-33-26
  • 2026-10-07_08-31-11
  • 2026-10-07_08-29-10
  • 2026-10-06_08-33-22
  • 2026-10-06_08-30-44
  • 2026-10-05_08-29-02
  • 2026-10-05_08-26-52
  • 2026-10-04_08-30-03
  • 2026-10-04_08-28-08
  • 2026-10-03_08-29-11
  • 2026-10-03_08-26-36
  • 2026-10-02_08-29-16
  • 2026-10-02_08-28-04
  • 2026-10-01_08-31-31
  • 2026-10-01_08-30-20
  • 2026-09-29_09-06-02
  • 2026-09-29_09-04-34
  • 2026-09-28_09-05-24
  • 2026-09-28_09-03-56
  • 2026-09-27_09-05-11
  • 2026-09-27_09-03-33
  • 2026-09-26_09-01-26
  • 2026-09-26_08-59-54
  • 2026-09-25_09-02-11
  • 2026-09-25_09-00-43
  • 2026-09-24_09-05-54
  • 2026-09-24_09-04-24
  • 2026-09-23_08-59-44
  • 2026-09-23_08-58-16
  • 2026-09-22_09-00-17
  • 2026-09-22_08-58-44
  • 2026-09-21_08-56-14
  • 2026-09-21_08-54-47
  • 2026-09-20_08-57-19
  • 2026-09-20_08-55-51
  • 2026-09-19_08-53-41
  • 2026-09-19_08-52-21
  • 2026-09-18_08-59-44
  • 2026-09-18_08-58-14
  • 2026-09-17_08-54-33
  • 2026-09-17_08-53-07
  • 2026-09-16_08-52-17
  • 2026-09-16_08-50-51
  • 2026-09-15_08-54-32
  • 2026-09-15_08-53-03
  • 2026-09-14_08-53-27
  • 2026-09-14_08-51-59
  • 2026-09-13_08-51-46
  • 2026-09-13_08-50-19
  • 2026-09-12_08-55-11
  • 2026-09-12_08-53-40
  • 2026-09-11_08-53-51
  • 2026-09-11_08-52-31
  • 2026-09-10_08-52-53
  • 2026-09-10_08-51-37
  • 2026-09-09_08-53-54
  • 2026-09-09_08-52-25
  • 2026-09-08_08-51-01
  • 2026-09-08_08-49-35
  • 2026-09-07_08-51-17
  • 2026-09-07_08-49-56
  • 2026-09-06_08-49-57
  • 2026-09-06_08-48-32
  • 2026-09-05_08-48-02
  • 2026-09-05_08-46-41
  • 2026-09-04_08-46-35
  • 2026-09-04_08-45-09
  • 2026-09-03_08-46-29
  • 2026-09-03_08-45-14
  • 2026-09-02_08-47-31
  • 2026-09-02_08-46-31
  • 2026-09-01_08-47-46
  • 2026-09-01_08-46-18
  • 2026-08-31_08-50-52
  • 2026-08-31_08-50-05
  • 2026-08-30_08-40-08
  • 2026-08-30_08-39-09
  • 2026-08-29_08-42-59
  • 2026-08-29_08-42-11
  • 2026-08-28_08-47-40
  • 2026-08-28_08-46-21
  • 2026-08-27_08-36-11
  • 2026-08-27_08-34-57
  • 2026-08-25_08-41-57
  • 2026-08-25_08-41-03
  • 2026-08-24_08-37-48
  • 2026-08-24_08-36-37
  • 2026-08-23_08-34-58
  • 2026-08-23_08-34-04
  • 2026-08-22_08-36-36
  • 2026-08-22_08-35-13
  • 2026-08-21_08-30-20
  • 2026-08-21_08-29-23
  • 2026-08-20_08-35-31
  • 2026-08-20_08-34-22
  • 2026-08-19_08-33-48
  • 2026-08-19_08-32-51
  • 2026-08-18_08-28-51
  • 2026-08-18_08-27-35
  • 2026-08-17_08-30-03
  • 2026-08-17_08-29-06
  • 2026-08-16_08-24-41
  • 2026-08-16_08-23-43
  • 2026-08-14_08-28-06
  • 2026-08-14_08-27-20
  • 2026-08-13_08-24-37
  • 2026-08-13_08-23-48
  • 2026-08-12_08-23-55
  • 2026-08-12_08-23-05
  • 2026-08-11_08-26-15
  • 2026-08-11_08-25-15
  • 2026-08-10_08-23-18
  • 2026-08-10_08-22-31
  • 2026-08-09_08-21-47
  • 2026-08-09_08-20-50
  • 2026-08-08_08-20-02
  • 2026-08-08_08-18-43
  • 2026-08-07_08-19-13
  • 2026-08-07_08-17-59
  • 2026-08-06_08-19-31
  • 2026-08-06_08-18-34
  • 2026-08-05_08-21-35
  • 2026-08-05_08-20-28
  • 2026-08-04_08-21-43
  • 2026-08-04_08-20-30
  • 2026-08-03_08-19-25
  • 2026-08-03_08-18-38
  • 2026-08-02_08-17-55
  • 2026-08-02_08-16-43
  • 2026-08-01_08-19-36
  • 2026-08-01_08-18-31
  • 2026-07-31_08-17-38
  • 2026-07-31_08-16-51
  • 2026-07-30_08-16-24
  • 2026-07-30_08-15-14
  • 2026-07-29_08-18-21
  • 2026-07-29_08-17-05
  • 2026-07-28_08-17-35
  • 2026-07-28_08-16-26
  • 2026-07-27_08-11-43
  • 2026-07-27_08-10-55
  • 2026-07-26_08-09-43
  • 2026-07-26_08-08-27
  • 2026-07-25_08-10-09
  • 2026-07-25_08-08-59
  • 2026-07-24_08-10-37
  • 2026-07-24_08-09-54
  • 2026-07-23_08-10-26
  • 2026-07-23_08-09-31
  • 2026-07-22_08-11-57
  • 2026-07-22_08-11-13
  • 2026-07-21_08-09-00
  • 2026-07-21_08-07-41
  • 2026-07-20_08-08-51
  • 2026-07-20_08-08-10
  • 2026-07-19_08-09-44
  • 2026-07-19_08-08-44
  • 2026-07-18_08-09-31
  • 2026-07-18_08-08-23
  • 2026-07-17_08-08-55
  • 2026-07-17_08-07-37
  • 2026-07-16_07-48-40
  • 2026-07-16_07-47-59
  • 2026-07-15_07-48-38
  • 2026-07-15_07-47-45
  • 2026-07-14_07-47-21
  • 2026-07-14_07-46-24
  • 2026-07-13_07-48-00
  • 2026-07-13_07-47-28
  • 2026-07-12_07-47-30
  • 2026-07-12_07-46-57
  • 2026-07-11_07-46-04
  • 2026-07-11_07-45-28
  • 2026-07-10_07-46-15
  • 2026-07-10_07-45-43
  • 2026-07-09_07-46-16
  • 2026-07-09_07-45-38
  • 2026-07-08_07-46-04
  • 2026-07-08_07-45-30
  • 2026-07-07_07-45-55
  • 2026-07-07_07-45-06
  • 2026-07-06_07-46-19
  • 2026-07-06_07-45-49
  • 2026-07-05_07-42-39
  • 2026-07-05_07-42-00
  • 2026-07-04_07-44-01
  • 2026-07-04_07-43-29
  • 2026-07-03_07-44-15
  • 2026-07-03_07-43-23
  • 2026-07-02_07-43-00
  • 2026-07-02_07-42-16
  • 2026-07-01_08-09-22
  • 2026-07-01_08-08-42
  • 2026-06-30_09-49-32
  • 2026-06-30_08-05-51
  • 2026-06-29_11-35-23
  • 2026-06-29_08-09-19
  • 2026-06-28_09-32-36
  • 2026-06-28_08-02-13
  • 2026-06-27_09-33-16
  • 2026-06-27_08-02-43
  • 2026-06-27_08-01-50
  • 2026-02-18_07-05-21
  • 2025-06-07_03-33-40
  • 2024-11-23_03-30-55
  • 2024-09-30_21-22-12
  • 2024-07-04_15-01-34
  • 2024-03-30_14-18-49

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

13 Dec 2022

Call closes

30 Mar 2023

Outcome expected

30 Aug 2023 · est.

Grant agreement signed

30 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    13 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    30 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    30 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    30 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal