Closed HORIZON-CL5-2023-D3-01-09 HORIZON

Waste heat reutilisation from data centres

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to the following expected outcome:

  • Make sustainable seasonal storage solutions available to data centres to allow year-round optimised operation in urban environments in an integrated way to supply heat to neighbouring district heating system(s), agriculture and/or industry optimising use of excess heating energy and required cooling energy.

Storage solutions with high round-trip efficiency, low dependence on critical raw materials, low land/space footprint will be considered as advantage.

Scope:

Two main obstacles arise in relation to the reuse of waste heat from data centres:

  • First, data centres produce more waste heat in summer/when it is hot outside. The PUE (Power use effectiveness) of data centres vary considerably along the year, because in winter they can resort to free cooling (using fresh air from the outside), while in summer they need to ventilate more and use heat pumps to cool down the outside air. As a result, an important part of data centres’ waste heat is produced when less people need it (at least for domestic heating purposes).
  • Second, the heat produced is of poor quality (low temperatures and often light heat vector), so that even for immediate use it is often not economically viable to use heat pumps to “concentrate” it (increase temperature and, if necessary, communicate it to a heavier vector).

Combining waste heat reuse with heat storage would allow data centres to better valorise their waste heat in winter (under the form of residential heating for instance) while storing this heat during hotter periods. From an economic perspective, the increase of waste heat that can be valorised and sold by the data centre during the appropriate seasons may partially compensate the additional costs of cooling during summer months. Such technologies may subsequently apply to other industries generating important amounts of low temperature – low density heat.

Selected projects will test and further develop seasonal heat storage technologies through an integrated pilot that includes at least the following technologies:

  • Heating and cooling exchange system for the data centre and the district heating system.
  • Seasonal energy storage.

For efficiency purposes, the storage technology should be able to store the heat for a long time (up to 6 months), with as little energy losses as possible, and using as few compressor steps as possible. The storage technology should also be non-hazardous and be deployable close to dwelling areas without posing a threat to them. Additionally, a specific consideration should be given to the cyber-physical security of the combined storage and restitution system.

Optionally, the project could involve heat pump manufacturers to explore the benefits of heat pump technologies to the overall heat storage facility.

Plan for the exploitation and dissemination of results for proposals submitted under this topic should include a strong business case and sound exploitation strategy, as outlined in the introduction to this Destination. The exploitation plans should include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan, financial model) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

null

Activities are expected to achieve TRL 7-8 by the end of the project – see General Annex B.

News flashes

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-04-04

The call for proposals HORIZON-CL5-2023-D3-01 closed on 30/03/2023. 128 proposals were submitted to the call. The breakdown per topic is:

HORIZON-CL5-2023-D3-01-01   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-02   (IA):      13 proposals

HORIZON-CL5-2023-D3-01-03   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-04   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-05   (RIA):    26 proposals

HORIZON-CL5-2023-D3-01-06   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-07   (IA):      1 proposal

HORIZON-CL5-2023-D3-01-08   (IA):      9 proposals

HORIZON-CL5-2023-D3-01-09   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-10   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-11   (IA):      7 proposals

HORIZON-CL5-2023-D3-01-12   (IA):      3 proposals

HORIZON-CL5-2023-D3-01-13   (RIA):   15 proposals

HORIZON-CL5-2023-D3-01-14   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-15   (IA):      4 proposals

HORIZON-CL5-2023-D3-01-16   (CSA):  1 proposal

HORIZON-CL5-2023-D3-01-17   (IA):      5 proposals

HORIZON-CL5-2023-D3-01-18 (COFUND): 2 proposals

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2023-03-02

Following the Council Implementing Decision (EU) 2022/2506, as of 16th December 2022, no legal commitments (including the grant agreement itself as well as subcontracts, purchase contracts, financial support to third parties etc.) can be signed with Hungarian public interest trusts established under Hungarian Act IX of 2021 or any entity they maintain.

Affected entities may continue to apply to calls for proposals. However, in case the Council measures are not lifted, such entities are not eligible to participate in any funded role (beneficiaries, affiliated entities, subcontractors, recipients of financial support to third parties).

[OPTION FOR MULTI-BENEFICIARY GRANT CALLS: In this case, co-applicants will be invited to remove or replace that entity [SUB-OPTION FOR CALLS ALLOWING ASSOCIATED PARTNERS: and/or to change its status into associated partner]. Tasks and budget may be redistributed accordingly]

2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
2022-12-13
The submission session is now available for: HORIZON-CL5-2023-D3-01-18(HORIZON-COFUND), HORIZON-CL5-2023-D3-01-13(HORIZON-RIA), HORIZON-CL5-2023-D3-01-03(HORIZON-IA), HORIZON-CL5-2023-D3-01-06(HORIZON-IA), HORIZON-CL5-2023-D3-01-04(HORIZON-IA), HORIZON-CL5-2023-D3-01-09(HORIZON-IA), HORIZON-CL5-2023-D3-01-16(HORIZON-CSA), HORIZON-CL5-2023-D3-01-01(HORIZON-IA), HORIZON-CL5-2023-D3-01-08(HORIZON-IA), HORIZON-CL5-2023-D3-01-05(HORIZON-RIA), HORIZON-CL5-2023-D3-01-02(HORIZON-IA), HORIZON-CL5-2023-D3-01-11(HORIZON-IA), HORIZON-CL5-2023-D3-01-15(HORIZON-IA), HORIZON-CL5-2023-D3-01-10(HORIZON-IA), HORIZON-CL5-2023-D3-01-07(HORIZON-IA), HORIZON-CL5-2023-D3-01-12(HORIZON-IA), HORIZON-CL5-2023-D3-01-14(HORIZON-IA), HORIZON-CL5-2023-D3-01-17(HORIZON-IA)
call topic details
Call status: Closed
Opening date: 2022-12-13 (3 years ago)
Closing date: 2023-03-30 (3 years ago)
Procedure: single-stage

Budget: 12,000,000
Expected grants: 2
Contribution: 6,000,000 - 6,000,000
News flashes

This call topic has been appended 6 times by the EC with news.

  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-04-04
    the call for proposals horizon-cl5-2023-...
  • 2023-03-02
    following the council implementing...
  • 2023-03-02
    following the council implementing...
  • 2022-12-13
    the submission session is now available...
  • 2022-12-13
    the submission session is now available...
Source information

Showing the latest information. Found 239 versions of this call topic in the F&T portal.

Information from

  • 2026-10-24_05-41-19
  • 2026-10-24_05-40-49
  • 2026-10-23_05-42-42
  • 2026-10-23_05-42-13
  • 2026-10-22_05-48-06
  • 2026-10-22_05-47-50
  • 2026-10-21_05-43-21
  • 2026-10-21_05-42-59
  • 2026-10-20_05-42-43
  • 2026-10-20_05-42-15
  • 2026-10-19_05-46-37
  • 2026-10-19_05-46-01
  • 2026-10-18_05-41-22
  • 2026-10-18_05-38-56
  • 2026-10-17_05-41-59
  • 2026-10-16_05-34-29
  • 2026-10-15_05-38-09
  • 2026-10-15_05-37-33
  • 2026-10-14_05-33-49
  • 2026-10-14_05-33-02
  • 2026-10-13_05-37-10
  • 2026-10-13_05-36-18
  • 2026-10-12_08-32-28
  • 2026-10-12_08-31-38
  • 2026-10-11_08-31-28
  • 2026-10-11_08-30-40
  • 2026-10-10_08-34-21
  • 2026-10-10_08-33-28
  • 2026-10-09_08-30-36
  • 2026-10-09_08-30-01
  • 2026-10-08_08-33-52
  • 2026-10-08_08-33-24
  • 2026-10-07_08-29-34
  • 2026-10-07_08-28-49
  • 2026-10-06_08-31-20
  • 2026-10-06_08-30-24
  • 2026-10-05_08-27-32
  • 2026-10-05_08-26-43
  • 2026-10-04_08-28-21
  • 2026-10-04_08-27-50
  • 2026-10-03_08-26-53
  • 2026-10-03_08-26-25
  • 2026-10-02_08-28-38
  • 2026-10-02_08-27-53
  • 2026-10-01_08-30-54
  • 2026-10-01_08-30-10
  • 2026-09-29_09-05-24
  • 2026-09-29_09-04-24
  • 2026-09-28_09-04-38
  • 2026-09-28_09-03-47
  • 2026-09-27_09-04-24
  • 2026-09-27_09-03-26
  • 2026-09-26_09-00-33
  • 2026-09-26_08-59-38
  • 2026-09-25_09-01-29
  • 2026-09-25_09-00-35
  • 2026-09-24_09-05-07
  • 2026-09-24_09-04-13
  • 2026-09-23_08-59-02
  • 2026-09-23_08-58-06
  • 2026-09-22_08-59-30
  • 2026-09-22_08-58-34
  • 2026-09-21_08-55-33
  • 2026-09-21_08-54-33
  • 2026-09-20_08-56-36
  • 2026-09-20_08-55-41
  • 2026-09-19_08-52-58
  • 2026-09-19_08-52-12
  • 2026-09-18_08-58-58
  • 2026-09-18_08-58-04
  • 2026-09-17_08-53-52
  • 2026-09-17_08-52-58
  • 2026-09-16_08-51-34
  • 2026-09-16_08-50-43
  • 2026-09-15_08-53-45
  • 2026-09-15_08-52-48
  • 2026-09-14_08-52-41
  • 2026-09-14_08-51-53
  • 2026-09-13_08-51-03
  • 2026-09-13_08-50-06
  • 2026-09-12_08-54-21
  • 2026-09-12_08-53-34
  • 2026-09-11_08-53-12
  • 2026-09-11_08-52-23
  • 2026-09-10_08-52-16
  • 2026-09-10_08-51-28
  • 2026-09-09_08-53-06
  • 2026-09-09_08-52-16
  • 2026-09-08_08-50-19
  • 2026-09-08_08-49-25
  • 2026-09-07_08-50-38
  • 2026-09-07_08-49-47
  • 2026-09-06_08-49-15
  • 2026-09-06_08-48-25
  • 2026-09-05_08-47-20
  • 2026-09-05_08-46-33
  • 2026-09-04_08-45-58
  • 2026-09-04_08-44-59
  • 2026-09-03_08-45-56
  • 2026-09-03_08-45-04
  • 2026-09-02_08-48-28
  • 2026-09-02_08-46-24
  • 2026-09-01_08-47-02
  • 2026-09-01_08-46-11
  • 2026-08-31_08-51-44
  • 2026-08-31_08-49-46
  • 2026-08-30_08-41-05
  • 2026-08-30_08-39-00
  • 2026-08-29_08-43-56
  • 2026-08-29_08-41-53
  • 2026-08-28_08-46-58
  • 2026-08-28_08-46-06
  • 2026-08-27_08-35-23
  • 2026-08-27_08-34-38
  • 2026-08-25_08-42-48
  • 2026-08-25_08-40-56
  • 2026-08-24_08-37-15
  • 2026-08-24_08-36-25
  • 2026-08-23_08-35-46
  • 2026-08-23_08-33-54
  • 2026-08-22_08-35-55
  • 2026-08-22_08-35-02
  • 2026-08-21_08-31-10
  • 2026-08-21_08-29-14
  • 2026-08-20_08-34-50
  • 2026-08-20_08-34-02
  • 2026-08-19_08-34-36
  • 2026-08-19_08-32-41
  • 2026-08-18_08-28-05
  • 2026-08-18_08-27-16
  • 2026-08-17_08-30-53
  • 2026-08-17_08-28-59
  • 2026-08-16_08-25-28
  • 2026-08-16_08-23-38
  • 2026-08-14_08-28-56
  • 2026-08-14_08-26-57
  • 2026-08-13_08-25-27
  • 2026-08-13_08-23-36
  • 2026-08-12_08-24-48
  • 2026-08-12_08-22-59
  • 2026-08-11_08-27-01
  • 2026-08-11_08-25-04
  • 2026-08-10_08-24-04
  • 2026-08-10_08-21-55
  • 2026-08-09_08-22-40
  • 2026-08-09_08-20-43
  • 2026-08-08_08-19-20
  • 2026-08-08_08-18-34
  • 2026-08-07_08-18-32
  • 2026-08-07_08-17-39
  • 2026-08-06_08-20-20
  • 2026-08-06_08-18-30
  • 2026-08-05_08-20-55
  • 2026-08-05_08-20-07
  • 2026-08-04_08-21-07
  • 2026-08-04_08-20-17
  • 2026-08-03_08-20-16
  • 2026-08-03_08-18-23
  • 2026-08-02_08-17-18
  • 2026-08-02_08-16-36
  • 2026-08-01_08-18-51
  • 2026-08-01_08-18-11
  • 2026-07-31_08-18-30
  • 2026-07-31_08-16-33
  • 2026-07-30_08-15-48
  • 2026-07-30_08-15-02
  • 2026-07-29_08-17-41
  • 2026-07-29_08-17-00
  • 2026-07-28_08-16-50
  • 2026-07-28_08-16-06
  • 2026-07-27_08-12-31
  • 2026-07-27_08-10-47
  • 2026-07-26_08-09-07
  • 2026-07-26_08-08-20
  • 2026-07-25_08-09-33
  • 2026-07-25_08-08-49
  • 2026-07-24_08-11-16
  • 2026-07-24_08-09-33
  • 2026-07-23_08-11-14
  • 2026-07-23_08-09-24
  • 2026-07-22_08-12-46
  • 2026-07-22_08-11-01
  • 2026-07-21_08-08-18
  • 2026-07-21_08-07-33
  • 2026-07-20_08-09-40
  • 2026-07-20_08-07-54
  • 2026-07-19_08-09-03
  • 2026-07-19_08-08-27
  • 2026-07-18_08-08-48
  • 2026-07-18_08-08-08
  • 2026-07-17_08-08-17
  • 2026-07-17_08-07-28
  • 2026-07-16_07-49-17
  • 2026-07-16_07-47-52
  • 2026-07-15_07-48-10
  • 2026-07-15_07-47-37
  • 2026-07-14_07-46-51
  • 2026-07-14_07-46-18
  • 2026-07-13_07-48-37
  • 2026-07-13_07-47-16
  • 2026-07-12_07-48-02
  • 2026-07-12_07-46-47
  • 2026-07-11_07-46-41
  • 2026-07-11_07-45-19
  • 2026-07-10_07-46-46
  • 2026-07-10_07-45-29
  • 2026-07-09_07-46-56
  • 2026-07-09_07-45-33
  • 2026-07-08_07-46-36
  • 2026-07-08_07-45-24
  • 2026-07-07_07-45-24
  • 2026-07-07_07-44-54
  • 2026-07-06_07-46-56
  • 2026-07-06_07-45-41
  • 2026-07-05_07-42-17
  • 2026-07-05_07-41-53
  • 2026-07-04_07-44-33
  • 2026-07-04_07-43-22
  • 2026-07-03_07-43-46
  • 2026-07-03_07-43-12
  • 2026-07-02_07-42-32
  • 2026-07-02_07-42-09
  • 2026-07-01_08-09-20
  • 2026-07-01_08-08-28
  • 2026-06-30_09-49-26
  • 2026-06-30_08-05-28
  • 2026-06-29_11-35-20
  • 2026-06-29_08-09-00
  • 2026-06-28_09-32-33
  • 2026-06-28_08-01-56
  • 2026-06-27_09-33-15
  • 2026-06-27_08-02-19
  • 2026-06-27_08-01-36
  • 2026-02-18_07-05-22
  • 2025-06-07_03-33-42
  • 2024-11-23_03-30-55
  • 2024-09-30_21-22-12
  • 2024-07-04_15-01-33
  • 2024-03-30_14-18-14

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Call published · 30 Sep 2024 (2 years ago)

All expected milestones for this call have passed.

Today

Work programme published

07 Oct 2022 · est.

Call opens

13 Dec 2022

Call closes

30 Mar 2023

Outcome expected

30 Aug 2023 · est.

Grant agreement signed

30 Nov 2023 · est.

Call published

30 Sep 2024

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Work programme published Estimated

    07 Oct 2022 · 4 years ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  2. Call opens

    13 Dec 2022 · 3 years ago

    Submissions can be made from this date.

  3. Call closes

    30 Mar 2023 · 3 years ago

    Deadline to submit a proposal.

  4. Outcome expected Estimated

    30 Aug 2023 · 3 years ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  5. Grant agreement signed Estimated

    30 Nov 2023 · 2 years ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

  6. Call published

    30 Sep 2024 · 2 years ago

    This topic was first published in TopicTree.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal