Closed HORIZON-CL5-2026-01-D2-01 HORIZON

Development of sustainable and design-to-cost batteries with (energy-)efficient manufacturing processes and based on advanced and safer materials (Batt4EU Partnership)

Call text (as on F&T portal)

View on F&T portal

Expected Outcome:

Project results are expected to contribute to all of the following outcomes:

  • Development of next generation low-cost batteries for improving the affordability of electric mobility, enhancing the competitiveness of the European battery value chain, while lowering the share of Critical Raw Materials (CRM)[1];
  • Improved adaptation and flexibility of advanced and sustainable production processes in European battery manufacturing;
  • Improved adaptation/flexibility of design-to-circularity strategies.

Scope:

Proposals are expected to target technologies for design-to-cost batteries, with little reliance on CRMs, from one of the following two main technologies:

  • Liquid electrolyte lithium-ion batteries with lithium manganese iron phosphate (LMFP) or manganese-rich HLM (high lithium, manganese) as cathode materials (design-to-cost lithium-ion batteries for mobility[2]);
  • Sodium-ion batteries for mobility applications.

The projects are expected to demonstrate, at the end of the project, the following:

For HLM and LMFP chemistries, at the cell level:

  • Gravimetric energy density and volumetric energy density of at least 220 Wh/kg (for LMFP) and 250 Wh/kg (for HLM) and 550 Wh/L (for both) at operational temperature, respectively;
  • Charging duration of 20 minutes (20-80% SoC);
  • Cycle life of >4000 cycles for LMFP and >1500 cycles for HLM at 80% depth of discharge;
  • Electric Vehicle (EV) grade cell format and capacity;
  • A feasible pathway towards a competitive cost of 50-75€/kWh at pack level by 2030.

For sodium-ion batteries at cell level:

  • Gravimetric energy density and volumetric energy density of 180-200 Wh/kg and 400+ Wh/L at operational temperature, respectively;
  • Cycle life of 4000-6000 cycles at 80% depth of discharge;
  • Charging duration of 20 minutes (20-80% SoC);
  • EV grade cell format and capacity;
  • A credible pathway towards a competitive cost level of 50-75€/kWh at pack level by 2030.

Projects are expected to demonstrate the production of cell prototypes at pilot level and feasibility of compatibility (or improvement) of the developed materials with regards to at least one of the following cell production processes:

  • Dry or aqueous processing technologies;
  • Advanced electrode drying processes;
  • Improved cell formation processes and aging protocols;
  • Improved energy efficiency of processes in dry rooms.

Proposals are expected to provide the corresponding state-of-the-art benchmark for the selected production process and compare the project’s compatibility or improvement targets to said benchmark.

Furthermore, projects are expected to demonstrate the feasibility of compatibility (or improvement) of the developed materials with regards to at least one of the following:

  • Design for sorting, dismantling, separation, cost-effective repairing/regeneration, and safe recycling (including direct recycling);
  • Adapting Sensing solutions to improve lifetime and state of health detection;
  • Quantification of degradation mechanisms at early stage to determine the best strategy for beyond the first life.

The Commission initiative for Safe and Sustainable by Design[3] (SSbD) sets a framework for assessing the safety and sustainability of chemicals and materials which should be considered as a reference for project proposals.

Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation. The exploitation plans are expected to include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Proposals could consider the involvement of the European Commission's Joint Research Centre (JRC)[4] whose contribution could consist in providing added value regarding integral evaluation of safety of materials. For further information on the JRC’s possible contribution to the projects, please, search for additional publicly available information on the JRC’s website (EU Science Hub) on the NCP portal, or request specific information from the JRC (JRC-NCP-Network@ec.europa.eu)

JRC shall assure that all the other applicants receive the same information on the JRC’s possible contribution to the project (e.g., via the topic-specific FAQs under the Funding and Tenders Portal).

Projects are expected to collaborate and contribute to the activities of the Coordination and Support Action defined under the topic HORIZON-CL5-2025-D2-02-06.

To strengthen the European battery ecosystem, projects are expected to use materials, products and equipment produced in EU Member States and countries associated to Horizon Europe, unless it is demonstrated that no valid option exists. The procurement strategies should be described in the proposal, especially and to the furthest extent possible the place of production of the elements.

This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.

null

Activities are expected to achieve TRL6 (for manganese-rich HLM) and TRL7 (for lithium manganese iron phosphate and sodium-ion) by the end of the project – see General Annex B. Activities may start at any TRL.

[1] Regulation - EU - 2024/1252 - EN - EUR-Lex (europa.eu)

[2] https://bepassociation.eu/our-work/sria/

[3] https://research-and-innovation.ec.europa.eu/research-area/industrial-research-and-innovation/key-enabling-technologies/chemicals-and-advanced-materials_en

[4] https://joint-research-centre.ec.europa.eu/laboratories-z/battery-energy-storage-testing_en

News flashes

2026-10-24

EVALUATION results

Published: 6 May 2025

Deadline: 20 January 2026

The results of the evaluation for each topic are as follows:

D2-01

D2-04

D2-05

D2-09

D5-17

D6-03

D6-04

Number of proposals submitted (including proposals transferred from or to other calls)

30

29

24

18

16

28

4

Number of inadmissible proposals

0

0

0

2

1

3

0

Number of ineligible proposals

1

0

1

0

1

0

0

Number of above-threshold proposals

20

26

18

12

6

19

3

Total budget requested for above-threshold proposals (EUR)

157,195,820.96

248,601,723.75

132,166,046.82

17,988,579.24

47,945,477.95

75,990,887.37

14,965,660.09

Number of proposals retained for funding

3

3

2

1

2

2

1

Number of proposals in the reserve list

3

3

2

2

2

3

2

Funding threshold (1)

13.50

15.00

13.50

15.00

12.50

14.50

14.50

Ranking distribution

Number of proposals with scores lower or equal to 15 and higher or equal to 14

2

5

1

4

0

2

1

Number of proposals with scores lower than 14 and higher or equal to 13

2

6

3

3

1

5

0

Number of proposals with scores lower than 13 and higher or equal to 10

16

15

14

5

5

12

2

D6-05

D6-06

D6-07

D6-08

D6-09

D6-10

D6-13

Number of proposals submitted (including proposals transferred from or to other calls)

12

4

25

19

4

10

48

Number of inadmissible proposals

0

0

1

5

0

0

1

Number of ineligible proposals

0

0

3

1

1

0

0

Number of above-threshold proposals

9

3

18

6

3

9

32

Total budget requested for above-threshold proposals (EUR)

36,134,090.35

11,848,306.66

185,736,461.70

46,503,126.51

10,115,009.66

70,959,683.30

158,537,805.84

Number of proposals retained for funding

1

1

2

2

1

2

2

Number of proposals in the reserve list

3

2

2

2

2

2

2

Funding threshold (1)

14.00

14.50

14.00

13.50

13.50

14.50

14.50

Ranking distribution

Number of proposals with scores lower or equal to 15 and higher or equal to 14

1

1

2

1

0

2

4

Number of proposals with scores lower than 14 and higher or equal to 13

5

2

3

1

2

2

4

Number of proposals with scores lower than 13 and higher or equal to 10

3

0

13

4

1

5

24

D6-14

D6-15

Number of proposals submitted (including proposals transferred from or to other calls)

59

8

Number of inadmissible proposals

3

1

Number of ineligible proposals

0

0

Number of above-threshold proposals

46

4

Total budget requested for above-threshold proposals (EUR)

228,771,694.64

15,994,205.72

Number of proposals retained for funding

2

1

Number of proposals in the reserve list

2

2

Funding threshold (1)

13.50

15.00

Ranking distribution

Number of proposals with scores lower or equal to 15 and higher or equal to 14

1

2

Number of proposals with scores lower than 14 and higher or equal to 13

7

0

Number of proposals with scores lower than 13 and higher or equal to 10

38

2

(1) Proposals with the same score were ranked according to the priority order procedure set out in the call conditions (for HE, in the General Annexes to the Work Programme or specific arrangements in the specific call/topic conditions). To determine the ranking for ‘Innovation actions’, the score for ‘Impact’ is given a weight of 1.5.

Summary of observer report:

“The evaluation was a long and complex task, with a large number of topics. The evaluators were drawn from a diverse range of backgrounds and were experts in their field. All experts were fully committed to the process and produced good quality individual reports, supported by very able project officers and moderators. The rapporteurs fully supported moderators and project officers in ensuring that the consensus meetings were conducted appropriately, and in a fair manner. In conclusion, this was a fair, equitable and well-conducted evaluation, which complied with the rules of the call.”

We recently informed the applicants about the evaluation results for their proposals.

For questions, please contact the Research Enquiry Service.

2026-10-24

The call for proposals HORIZON-CL5-2026-01 has closed on 20 January 2026.

338 proposals have been submitted. The breakdown per topic is:

  • HORIZON-CL5-2026-01-D2-01 (IA): 30
  • HORIZON-CL5-2026-01-D2-04 (RIA): 29
  • HORIZON-CL5-2026-01-D2-05 (IA): 24
  • HORIZON-CL5-2026-01-D2-09 (CSA): 18
  • HORIZON-CL5-2026-01-D5-17 (IA): 16
  • HORIZON-CL5-2026-01-D6-03 (RIA): 28
  • HORIZON-CL5-2026-01-D6-04 (RIA): 4
  • HORIZON-CL5-2026-01-D6-05 (RIA): 12
  • HORIZON-CL5-2026-01-D6-06 (IA): 4
  • HORIZON-CL5-2026-01-D6-07 (IA): 25
  • HORIZON-CL5-2026-01-D6-08 (IA): 19
  • HORIZON-CL5-2026-01-D6-09 (CSA): 4
  • HORIZON-CL5-2026-01-D6-10 (IA): 10
  • HORIZON-CL5-2026-01-D6-13 (RIA): 48
  • HORIZON-CL5-2026-01-D6-14 (RIA): 59
  • HORIZON-CL5-2026-01-D6-15 (RIA): 8

Evaluation results are expected to be communicated in May/June 2026.

2026-10-24

As call HORIZON-CL5-2026-01 is from Horizon Europe Work Programme 2025, the relevant General Annexes apply:

https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/wp-call/2025/wp-14-general-annexes_horizon-2025_en.pdf

Applicants are advised to use the dedicated versions of the application form template found in the application/submission form of their proposal.

call topic details
Call status: Closed
Opening date: 2025-09-25 (1 year ago)
Closing date: 2026-01-20 (9 months ago)
Procedure: single-stage

Budget: 24,000,000
Expected grants: 3
Contribution: 8,000,000 - 8,000,000
News flashes

This call topic has been appended 3 times by the EC with news.

  • 2026-10-24
    evaluation resultspublished: 6 may 2025d...
  • 2026-10-24
    the call for proposals horizon-cl5-2026-...
  • 2026-10-24
    as call horizon-cl5-2026-01 is from hori...
Source information

Showing the latest information. Found 9 versions of this call topic in the F&T portal.

Information from

  • 2026-05-13_06-37-33
  • 2026-02-10_06-33-01
  • 2026-01-21_06-32-19
  • 2026-01-16_06-32-16
  • 2026-01-14_06-32-02
  • 2025-10-28_15-45-42
  • 2025-07-24_06-30-06
  • 2025-07-18_03-30-13
  • 2025-06-07_03-30-10

Check the differences between the versions.

Annotations

You must be logged in to add annotations
No annotations yet

Events

Hand-picked events relevant to this call topic.

No events yet

There are currently no events linked to this call topic.

Timeline

Track where this call stands in its lifecycle, from work programme to grant signature, and see what's likely to happen next.

Grant agreement signed · 20 Sep 2026 (1 month ago)

All expected milestones for this call have passed.

Today

Call published

07 Jun 2025

Work programme published

25 Jul 2025 · est.

Call opens

25 Sep 2025

Call closes

20 Jan 2026

Outcome expected

20 Jun 2026 · est.

Grant agreement signed

20 Sep 2026 · est.

Preparation Open for submission Evaluation Grant preparation Not yet reached
  1. Call published

    07 Jun 2025 · 1 year ago

    This topic was first published in TopicTree.

  2. Work programme published Estimated

    25 Jul 2025 · 1 year ago

    Topics are listed in the Work Programme before the call opens. Spotting this early gives you a head start on partner search and proposal planning.

  3. Call opens

    25 Sep 2025 · 1 year ago

    Submissions can be made from this date.

  4. Call closes

    20 Jan 2026 · 9 months ago

    Deadline to submit a proposal.

  5. Outcome expected Estimated

    20 Jun 2026 · 4 months ago

    The maximum time to inform applicants of the evaluation outcome is five months after the call closes.

  6. Grant agreement signed Estimated

    20 Sep 2026 · 1 month ago

    The maximum time to sign the grant agreement is three months after applicants are informed of the outcome.

Funded Projects

Loading...

Project information comes from CORDIS (for Horizon 2020 and Horizon Europe) and will be sourced from F&T Portal (for Digital Europe projects)

Ecosystem bubbles

This call topic is part of the following thematic bubbles.

Not part of a bubble yet

This call topic has not been grouped into an ecosystem bubble.

Call document info

This section will come soon and contain the scraped information from the call document, such as the expected impact, scope, and other relevant sections. In the meantime, you can find this information in the call text section or directly on the F&T portal. View on F&T portal